2016-2017
Report on Plans and Priorities
- Table of Contents

<< Previous | Table of Contents | Next >>

Report on Plans and Priorities - PDF Version (Size: 700.72 KB)

Help on accessing alternative formats, such as PDF, PPT and ZIP files, can be obtained in the alternate format help section.

Erratum

Subsequent to the tabling in Parliament and online publication of its 2016-2017 Report on Plans and Priorities (RPP) on March 7, 2016, Infrastructure Canada concluded that two figures in the Budgetary Financial Resources table in Section I of the report in both the English and French and HTML versions, were not the same figures that appeared on a second table of the document also in Section I, which are the correct figures (Page 17 in English and Page 18 in French).

Accordingly, the two figures have been revised as follows: In the Budgetary Financial Resources table (Page 16 in English and Page 17 in French), the 2017-2018 Planned Spending figure should read 4,161,469,038, rather than 4,461,469,038. And the 2018-2019 Planned Spending figure should read 4,684,311,192, rather than 4,687,344,192.

This revision has also been made to the HTML versions of the document in English and French on Infrastructure Canada's website, and the hyperlink to this table on the departmental website has also been updated.


Table of Contents

<< Previous | Table of Contents | Next >>
Date modified: