| Addington Highlands | County Road 41 Reconstruction (7.5 Kilometres) | $ 2,681,534.00 |
| Adelaide Metcalfe | Kerwood Fire Hall | $ 200,000.00 |
| Adelaide Metcalfe | Cuddy Drive Reconstruction | $ 265,000.00 |
| Adjala-Tosorontio | Resurfacing Concession Road 7 | $ 79,101.00 |
| Adjala-Tosorontio | New Shelter for the Alliston District Humane Society | $ 266,667.00 |
| Adjala-Tosorontio | Pave Sideroad 30 - Adjala | $ 45,672.00 |
| Adjala-Tosorontio | Everett Reservoir Repairs | $ 30,525.00 |
| Adjala-Tosorontio | Replacement of Concession Road 7 Bridge | $ 370,239.34 |
| Admaston/Bromley Township | Admaston/Bromley - Expansion | $ 104,000.00 |
| Ajax | Replacement of Polybutylene Service Connections - Chatfield Drive | $ 233,333.00 |
| Ajax | Replacement of Polybutylene Service Connections - Garnett Drive and Muirfield Street | $ 31,573.00 |
| Ajax | Replacement of Polybutylene Service Connections - Hawkins Crescent and Cornwallis Court | $ 77,720.00 |
| Ajax | Replacement of Polybutylene Service Connections - Hillings Drive | $ 28,333.00 |
| Ajax | Replacement of Polybutylene Service Connections - Humphrey Drive and Pinehurst Avenue | $ 101,627.00 |
| Ajax | Replacement of Polybutylene Service Connections - Kipling Crescent and Pinehurst Avenue | $ 81,840.00 |
| Ajax | Replacement of Polybutylene Service Connections - Love Crescent and Athabasca Street | $ 46,573.00 |
| Ajax | Replacement of Polybutylene Service Connections - Millinton Crescent and McClure Court | $ 130,200.00 |
| Ajax | Replacement of Polybutylene Service Connections - Muirfield Street | $ 32,240.00 |
| Ajax | Replacement of Polybutylene Service Connections - Stockbridge Crescent | $ 76,667.00 |
| Ajax | Road Rehabilitation - Church Street | $ 116,667.00 |
| Ajax | Roadside Protection Improvements | $ 3,667.00 |
| Ajax | St. Francis de Sales Rehabilitation and Retrofit | $ 852,473.00 |
| Ajax | Replacement of Polybutylene Service Connections - Athabasca Street | $ 37,200.00 |
| Ajax | Replacement of Polybutylene Service Connections - Carnelly Crescent | $ 110,000.00 |
| Ajax | Reconstruction of Fairall Street | $ 1,106,517.00 |
| Alberton | Alberton Fire Hall | $ 62,585.00 |
| Alberton | Rehabilitation and resurfacing of the Kehl-Domanski Road Loop | $ 68,403.53 |
| Alexandria | Park Street Sanitary Sewer Replacement | $ 250,000.00 |
| Alexandria | Alexandria Water System Upgrade | $ 1,140,000.00 |
| Alexandria | Glengarry Registry Office - Alexandria | $ 95,780.00 |
| Alfred-Plantagenet | Bolt Road Rehabilitation | $ 380,990.00 |
| Alfred-Plantagenet | Boundary Road Rehabilitation | $ 296,466.00 |
| Algonquin Highlands | McClintock Sewage Lagoon Rehabilitation | $ 50,000.00 |
| Algonquin Highlands | Disaster Mitigation Program - Generators | $ 75,000.00 |
| Algonquin Highlands | Expansion to the Township of Algonquin Highlands Airport | $ 1,263,167.00 |
| Alma | Construction of a Community Hall in Alma | $ 520,567.00 |
| Almonte | Construction of a mechanical sewage treatment plant and upgrade of pump station | $ 9,355,518.00 |
| Almonte | Rehabilitation of MacLan Bridge | $ 201,236.00 |
| Alnwick/Haldimand | Shelter Valley Road Rehabilitation | $ 343,333.00 |
| Alnwick/Haldimand | Replacement of Benlock Road overflow bridge | $ 111,880.33 |
| Alvinston | Municipal Administration Building Accessibility | $ 86,166.00 |
| Alvinston | Upgrades to the wastewater treatment facility | $ 322,456.00 |
| Amaranth | Sand Storage Building | $ 86,711.00 |
| Amherstburg | Victoria Street Sewer Separation | $ 310,000.00 |
| Amherstburg | Dalhousie Street Reconstruction | $ 666,666.00 |
| Amherstburg | Construction of the Amherstburg multi-use recreation complex | $ 7,866,888.00 |
| Armour | Landfill Site Improvements | $ 50,000.00 |
| Armour | Armour Commercial Drive - Intersection modification and renewal | $ 210,000.00 |
| Armour | Armour Office Modification and Renewal | $ 26,664.00 |
| Armour | Replacement of Leggetts Bridge | $ 833,333.00 |
| Armstrong | Improvements to community roads | $ 27,000.00 |
| Arnprior | Taxiway Reconstruction | $ 33,333.00 |
| Arnprior | Arnprior Library Expansion | $ 225,000.00 |
| Arnprior | Upgrade of the Water Pollution Control Centre | $ 5,330,000.00 |
| Arran-Eldersie | Replacement of Existing Tara Water Standpipe | $ 526,740.00 |
| Arran-Elderslie | Forrester's Bridge | $ 164,000.00 |
| Asphodel-Norwood | Upgrades to the Water System and the Installation of Water Meters | $ 337,000.00 |
| Asphodel-Norwood | Reconstruction of King Street | $ 1,145,260.00 |
| Athens | Athens Town Hall Rehabilitation | $ 65,000.00 |
| Atikokan | Municipal Civic Centre | $ 106,103.00 |
| Atikokan | Dunbar Heights Sidewalk Rehabilitation | $ 46,154.00 |
| Atikokan | Rehabilitation of Main Street | $ 904,374.00 |
| Atikokan | Rehabilitation of the Atikokan Municipal Airport | $ 815,562.00 |
| Augusta | Reconstruction of Concession Road #2 | $ 814,815.00 |
| Aurora | Sheppard's Bush Residence Repairs | $ 127,500.00 |
| Aurora | Ada Johnson Park Washroom Building | $ 83,333.00 |
| Aurora | Energy Management and Building System Retrofits | $ 246,800.00 |
| Aurora | Construction of a trail network | $ 108,333.00 |
| Aurora | Rehabilitation of the sanitary sewer collection system | $ 1,580,000.00 |
| Avening | Rehabilitation of Avening Bridge | $ 500,000.00 |
| Aylmer | Sanitary Sewer Crossings Reconstruction | $ 166,665.00 |
| Aylmer | Town Hall Basement Retrofit | $ 78,000.00 |
| Aylmer | Improvements to the 4th Avenue sewer | $ 274,500.00 |
| Baden | Expansion of the Wilmot Recreation Complex | $ 3,016,110.00 |
| Bala | Bala Fire Station Renovation and Expansion | $ 116,666.00 |
| Baldwin | Township of Baldwin Landfill Closure | $ 70,666.00 |
| Baldwin | Hardwood Road Rehabilitation | $ 150,000.00 |
| Balmertown | Renewal of the Fifth Street Water Main and Road in Balmertown | $ 706,640.00 |
| Bancroft | Watermain | $ 616,477.00 |
| Barrie | Road, Drainage and Other Infrastructure Improvements on Toronto Street, Dunlop Street and Mary Street | $ 3,281,400.00 |
| Barrie | Watermain Construction on Anne Street, Cundles Road, Kozlov Street and Heather Street | $ 992,700.00 |
| Barrie | Watermain Construction on Salem Road | $ 506,400.00 |
| Barrie | Infrastructure Improvements on Boys Street and Donald Street, including Bunkers Creek and Kidd’s Creek Culverts | $ 1,166,700.00 |
| Barrie | Allandale Station Tunnel and Stairway | $ 700,000.00 |
| Barrie | Construction of a New Fire and Emergency Services Station and Headquarters | $ 4,260,000.00 |
| Barrie | Construction of a Stormwater Management Pond and Improvements to the Operations Centre | $ 1,728,000.00 |
| Barrie | Highway 400 - Innisfil Creek Bridge Rehabilitation | $ 250,000.00 |
| Barrie | Highway 400 - St. Vincent Bridge Rehabilitation | $ 1,500,000.00 |
| Barry's Bay | Upgrading the Barry's Bay wastewater treatment plant | $ 1,338,333.00 |
| Bayfield | Installation of a Water Distribution System in Bayfield | $ 2,318,391.00 |
| Bayham | Calton Line Rehabilitation | $ 686,667.00 |
| Bayham | Carson Line Bridge | $ 32,400.00 |
| Beardmore | Highway 11 - Blackwater River bridge rehabilitation | * |
| Beauchamp | McLean Road Upgrade | $ 13,200.00 |
| Beauchamp | Airport Road | $ 19,800.00 |
| Beaverton | Reconstruction of Victoria Avenue, Beaverton | $ 372,322.00 |
| Beckwith | Lake Park Road Reconstruction | $ 300,178.00 |
| Beckwith | Beckwith Township and Town of Carleton Place Trail Development | $ 480,667.00 |
| Beckwith | Construction of an outdoor artificial turf field | $ 429,733.00 |
| Belle Vallée | Construction of a multi-use building | $ 128,333.00 |
| Belleville | New Habitat for Humanity facility | $ 366,667.00 |
| Belleville | Dundas Street West Overpass Rehabilitation | $ 666,667.00 |
| Belleville | Expansion of the Belleville recreation and community centre | $ 11,666,667.00 |
| Belleville | Rehabilitation of the sanitary and storm sewer | $ 1,543,967.00 |
| Bergland | Moosebay Road Upgrade | $ 41,000.00 |
| Bewdley | Rehabilitation of Rice Lake Drive | $ 1,000,000.00 |
| Billings | New Windows for Old Mill building | $ 29,150.00 |
| Black River-Matheson | Rehabilitation of Municipal Wells | $ 20,200.00 |
| Blind River | Public Works Complex | $ 743,333.00 |
| Blind River | Reconstruction of West Street and improvements to drainage | $ 313,493.44 |
| Blind River | Replacement of Potomac River Bridge | $ 215,150.00 |
| Bonfield | Trunk Road Reconstruction | $ 316,517.00 |
| Bonnechere Valley | Lake Clear Road Stabilization | $ 210,100.00 |
| Bourget | Improvements to the Hamlet of Bourget watermain and roadworks | $ 602,871.00 |
| Bowmanville | Darlington Park Day Use Facilities Improvements | $ 175,000.00 |
| Bowmanville | Energy retrofit - Garnet B. Rickard Complex | $ 425,000.00 |
| Bracebridge | Muskoka Branch New Animal Shelter Project | $ 596,667.00 |
| Bracebridge | Construction of the Bracebridge skatepark | $ 134,265.13 |
| Bradford West Gwillimbury | 8th Line/Dissette Reconstruction | $ 1,972,000.00 |
| Bradford West Gwillimbury | Colborne Street Reconstruction | $ 540,333.00 |
| Bradford West Gwillimbury | Highway 400 - Regional Road 88 Bridge Rehabilitation | $ 200,000.00 |
| Bradford West Gwillimbury | Construction of the Bradford West Gwillimbury Library and Cultural Centre in Bradford | $ 3,675,000.00 |
| Bradford West Gwillimbury | Construction of the Bradford West Gwillimbury Sports and Leisure Centre | $ 8,241,666.00 |
| Bradford West Gwillimbury/Innisfil | Highway 400 reconstruction from north of Canal Road to Innisfil Beach Road | * |
| Bradford West Gwillimbury/Innisfil | Highway 400 reconstruction from north of Canal Road to Innisfil Beach Road | $ 41,500,000.00 |
| Brampton | Replacement of Roof Membrane at Beckett Sproule Reservoir | $ 500,000.00 |
| Brampton | Reservoir Rehabilitation Project - East Brampton cells 1 and 2 | $ 214,906.00 |
| Brampton | Reservoir Rehabilitation Project - East Brampton cells 3 and 4 | $ 400,000.00 |
| Brampton | Resurfacing - Airport Road from Steeles Avenue to Queen Street | $ 1,052,024.00 |
| Brampton | Resurfacing - Highway 50 from Countryside Drive to Coleraine Drive | $ 400,888.00 |
| Brampton | Upgrades to Chinguacousy Park | $ 8,164,000.00 |
| Brampton | Intermodal Sewage Pumping Station Enhancements | $ 183,334.00 |
| Brampton | Lionhead Pumping Station, Decommissioning and Gravity Sewer Connection | $ 416,667.00 |
| Brampton | Major Rehabilitation and Repair Works to Municipal Facilities at Copper Road | $ 425,600.00 |
| Brampton | McVean Drive Trunk Sewer | $ 1,495,259.00 |
| Brampton | Mount Pleasant Village Mobility Hub | $ 7,666,666.00 |
| Brampton | Peel Heritage Complex Expansion and Revitalization | $ 3,333,334.00 |
| Brampton | Police Fleet Garage and Inventory Stores | $ 3,000,000.00 |
| Brampton | Registration and Assessment Wing - St. Leonard’s Place | $ 833,000.00 |
| Brampton | Replacement of Old Watermains in the City of Brampton | $ 8,376,587.00 |
| Brampton | Brampton Social Services Centre | $ 2,200,000.00 |
| Brampton | Clarkway Drive Trunk Sewer | $ 1,579,417.00 |
| Brampton | Dixie Road Repairs | $ 246,666.00 |
| Brampton/Caledon | Resurfacing - Mayfield Road from McLaughlin Road to Mississauga Road | $ 289,430.00 |
| Brantford | Laurier Brantford YMCA Athletics and Recreation Complex | $ 16,700,000.00 |
| Brantford | Construction of Wayne Gretzky Centre | $ 12,960,782.00 |
| Brantford | Expansion of the Wayne Gretzky Sports Centre | $ 3,000,000.00 |
| Brantford | Rehabilitation of Chemical Road in Trout Creek | $ 381,264.70 |
| Brehtour and Casey Townships | Rehabilitation of Jacques Bridge | $ 126,666.00 |
| Breslau | Construction of a New Combined Airport/Fleet Maintenance and Fire Hall Services Facility | $ 2,366,667.00 |
| Breslau | Construction of Breslau Community Centre | $ 776,969.15 |
| Brighton | Presqu'ile Park Picnic Shelter | $ 50,000.00 |
| Brighton | Reconstruction of Drewery Street | $ 376,742.00 |
| Brock | Culvert 340 Replacement | $ 116,666.00 |
| Brockville | Jessie Street and George Street Sewer Separation | $ 500,000.00 |
| Brockville | Construction of the Maritime Discovery Centre of the 1000 Islands | $ 5,694,492.00 |
| Brockville | Rehabililitation of the Memorial Complex | $ 141,665.64 |
| Brooke-Alvinston | Lambton County Road 8 Rehabilitation | $ 633,334.00 |
| Brooke-Alvinston | Churchill Line Rehabilitation | $ 75,000.00 |
| Brooklin | Construction of the Brooklin Community Centre and Library | $ 4,853,333.00 |
| Bruce Mines | Rehabilitation of the downtown highway corridor in Bruce Mines | $ 399,989.00 |
| Brudenell, Lyndoch and Raglan | Upgrade to Letterkenny Road | $ 120,000.00 |
| Brudenell, Lyndoch and Raglan | Upgrade to Raglan Recreation Centre | $ 237,549.00 |
| Burlington | Roofing of City Buildings | $ 298,000.00 |
| Burlington | Transit Operations Centre Renewal/Expansion Project | $ 2,866,666.00 |
| Burlington | Hydro Corridor Bike Path Resurfacing | $ 600,000.00 |
| Burlington | New City Park | $ 2,300,000.00 |
| Burlington | New Fire Station in North East Burlington | $ 750,000.00 |
| Burlington | Accessibility Bridge | $ 500,000.00 |
| Burlington | Centennial Bike Path resurfacing | $ 833,333.00 |
| Burlington | Corporate-Wide Building Automation System | $ 500,000.00 |
| Burlington | Highway 403 - Rehabilitation and Resurfacing | $ 4,150,000.00 |
| Burlington | Region of Halton Skyway Wastewater Treatment Plant | $ 51,500,000.00 |
| Burlington | Burlington Perfoming Arts Centre | $ 1,500,000.00 |
| Burlington | Royal Botanical Gardens Infrastructure Renewal and Rehabilitation | * |
| Burpee and Mills | Municipal Complex Improvements | $ 8,791.00 |
| Burpee and Mills | Reconstruction of Campbell Road | $ 191,767.00 |
| Byng Inlet | Klondyke Road | $ 22,497.36 |
| Caledon | Resurfacing Highway 9 - West of Peel Road | $ 2,000,000.00 |
| Caledon | Water servicing for the communities of Campbell's Cross and Victoria in Town of Caledon | $ 1,717,100.00 |
| Caledon | Interconnection of Caledon East and Palgrave Water System | $ 1,394,863.00 |
| Caledon | Gore Road Rehabilitation | $ 83,333.00 |
| Caledon | Replacement of Heart Lake Road Bridge | $ 256,750.00 |
| Callander | Standby Power Generation | $ 100,000.00 |
| Callander | Rehabilitation of the Hart Road Bridge | $ 114,333.00 |
| Calvin | Landfill Site Expansion Project | $ 26,400.00 |
| Calvin | Replacement of Pautois Bridge No. 5 | $ 302,500.00 |
| Cambridge | Replacement of the Hespeler Wastewater Treatment Plant Raw Sewage Pumping Station | $ 3,333,300.00 |
| Cambridge | Road Rehabilitation Program - Cambridge | $ 4,166,666.00 |
| Cambridge | Upgrade of the Galt and Preston Wastewater Treatment Plants SCADA System | $ 3,333,300.00 |
| Cambridge | Upgrade of the Galt Wastewater Treatment Plant Digester | $ 2,000,000.00 |
| Cambridge | Municipal Buildings Rehabilitation - Cambridge | $ 5,000,000.00 |
| Cambridge | Operations Center Photovoltaic System | $ 500,000.00 |
| Cambridge | Preston Auditorium Rehabilitation - Cambridge | $ 800,000.00 |
| Cambridge | Public Works Building Rehabilitation - Cambridge | $ 1,400,000.00 |
| Cambridge | Rehabilitation and Renewal of the Chaplin Family YMCA | $ 343,333.00 |
| Cambridge | Rehabilitation of Shellard Road Bridge | $ 133,733.00 |
| Cambridge | Cambridge Performing Arts Complex | $ 6,000,000.00 |
| Cambridge and Township of North Dumfries | Regional Road 97 (Main Street) from Shellard Side Road to East of Franklin Boulevard | $ 370,000.00 |
| Canton de l'Archipel | Waste Management Efficiency Improvements | $ 227,666.00 |
| Canton de l'Archipel | Blackstone/Crane Lake Road Reconstruction | $ 1,000,000.00 |
| Canton de l'Archipel | Healey Lake Road Reconstruction | $ 1,666,666.00 |
| Carleton Place | Road Rehabilitation - Carleton Place | $ 716,666.00 |
| Carleton Place | Lanark Community Programs - Bennett Street Facilities Development | $ 550,000.00 |
| Carleton Place | Upgrade to the Carleton Place water treatment plant | $ 500,217.00 |
| Carleton Place | Improvements to the wastewater pollution control plant | $ 446,990.00 |
| Carling | Improvements to Snug Harbour Road | $ 91,667.00 |
| Carlow/Mayo | Renovations to Community Centre | $ 50,000.00 |
| Cartier | Improvements to Geneva Lake Road | $ 14,175.00 |
| Casey | Sand/salt Storage Facility | $ 63,360.00 |
| Casselman | Casselman Storm Sewers | $ 128,333.00 |
| Casselman | Improvements to the Casselman Water Works | $ 180,333.00 |
| Cavan Monaghan | County Road 28 Rehabilitation | $ 133,333.00 |
| Cavan Monaghan | Township of Cavan Monaghan water and sewer systems | $ 9,800,088.00 |
| Cayuga | Cayuga wastewater treatment plant | $ 1,539,000.00 |
| Central Elgin | St. Thomas Municipal Airport Hangar | $ 500,000.00 |
| Central Elgin | Port Stanley Watermain Project | $ 159,333.00 |
| Central Elgin | Sanitary sewer service for Elmwood Avenue and Bailey Avenue | $ 443,935.00 |
| Central Frontenac | Road Upgrade and Construction Project | $ 789,132.00 |
| Central Frontenac | Salt Storage Expansion Project | $ 116,666.00 |
| Central Frontenac | Office Extension | $ 66,666.00 |
| Central Huron | Orchard Line Road repaving project | $ 420,000.00 |
| Central Huron | Fire Hall | $ 435,000.00 |
| Centre Hastings | Centre Hastings Municipal Office and Council Chambers | $ 315,000.00 |
| Centre Hastings | Reconstruction of Springbrook Road west of Highway 62 | $ 295,637.15 |
| Chalk River | Corrective Measures to the Chalk River Water Treatment Plant | $ 130,000.00 |
| Chamberlain | Public Works Garage | $ 100,000.00 |
| Chamberlain | Improvements to Wawbewawa Road | $ 48,300.00 |
| Champlain | Riverflow Cycling Trail | $ 1,453,333.00 |
| Champlain | Vankleek Hill Arena Elevator Replacement | $ 66,666.00 |
| Chapleau | Lisgar Street Bridge Improvements | $ 45,000.00 |
| Chapleau | Community centre rehabilitation in the Town of Chapleau | $ 198,565.00 |
| Chapleau | Esher Como Healy Road upgrades | $ 67,500.00 |
| Chapleau | Reconstruction of Monk Street | $ 607,777.00 |
| Chapple | Replacement of the Barron Bridge | $ 502,260.00 |
| Chatham | Robertson Outfall Sanitary Sewer Separation Project | $ 3,833,333.00 |
| Chatham | Sanitary Sewer Rehabilitation - Community of Chatham | $ 666,667.00 |
| Chatham | Sanitary Sewer Rehabilitation - Community of Chatham | $ 666,667.00 |
| Chatham | Van Allen Street Sanitary Sewer Separation Project | $ 1,666,667.00 |
| Chatham | YMCA of Chatham-Kent Facility Renewal Project | $ 4,301,720.00 |
| Chatham | King Street Sanitary Sewer Relining | $ 1,666,666.00 |
| Chatham | Renewal of Base Line Bridge Over Little Bear Creek East | $ 773,955.00 |
| Chatham | Renewal of Princess Street Bridge Over McGregor Creek | $ 733,333.00 |
| Chatham | Renewal of Sydenham River Bridge on Langstaff Line | $ 800,000.00 |
| Chatham | Chatham Kent Women's Centre Expansion Project | $ 322,475.00 |
| Chatham-Kent | Talbot Trail Resurfacing | $ 267,773.00 |
| Chatham-Kent | Queen's Line Resurfacing | $ 429,732.00 |
| Chatham-Kent | Bay Line Road Resurfacing | $ 152,692.00 |
| Chatham-Kent | Bear Line Road Resurfacing | $ 125,848.00 |
| Chatham-Kent | Highway 401 - Essex Road to Bloomfield Road Eastbound Lanes | $ 2,450,000.00 |
| Chatsworth | Williamsford Community Centre Rehabilitation | $ 250,000.00 |
| Chatsworth | Chatsworth Road 24 | $ 166,666.00 |
| Chatsworth | Concession 6 | $ 140,000.00 |
| Chatsworth | Replacement of Gamble Bridge and reconstruction of Sideroad 1 | $ 395,370.00 |
| Chisholm | Landfill Site - Groundwater Monitoring Wells | $ 18,033.00 |
| Chisholm | Municipal Fire Hall Upgrade | $ 30,000.00 |
| Chisholm | Reconstruction of Memorial Park Drive | $ 228,899.00 |
| Chute-à-Blondeau | Voyageur Park Infrastructure | $ 100,000.00 |
| Chute-à-Blondeau | New Community/Emergency Centre | $ 329,980.00 |
| Clarence-Rockland | Regional Water Supply - Phase 2 | $ 8,912,563.00 |
| Clarence-Rockland | Clarence-Rockland Sporting Event and Training Centre | $ 6,800,000.00 |
| Clarington | Replacement of Polybutylene Service Connections - Centerfield Drive | $ 38,333.00 |
| Clarington | Replacement of Polybutylene Service Connections - Valleycrest Drive | $ 51,667.00 |
| Clarington | Replacement of Polybutylene Service Connections - Windsor Valley Gate | $ 3,333.00 |
| Clarington | Replacement of Polybutylene Service Connections - Windsor Valley Place | $ 20,000.00 |
| Clarington | Road Rehabilitation - Regional Highway 2 | $ 416,667.00 |
| Clarington | Replacement of Polybutylene Service Connections - Belleview Court | $ 30,000.00 |
| Clarington | Replacement of Polybutylene Service Connections - Black Creek Trail | $ 66,667.00 |
| Clarington | Replacement of Polybutylene Service Connections - Carriage Lane | $ 16,667.00 |
| Clarington | Concession Road 6 Pavement Rehabilitation - Old Scugog Road to Acres Road | $ 826,667.00 |
| Clarington | Highway 35 - Wilmot Creek Bridge Rehabilitation | $ 250,000.00 |
| Clarington | Rehabilitation of Concession Road 7/8 | $ 1,590,000.00 |
| Clearview | Stayner to Collingwood Trail | $ 66,667.00 |
| Clearwater Lake | Upgrading Burditt Lake Road | $ 9,900.00 |
| Clinton | Extension of wastewater and road services to Clinton area | $ 453,661.00 |
| Cloyne | Bon Echo Park Shelter Construction | $ 45,000.00 |
| Clydesville | Rehabilitation of Clydesville Bridge | $ 415,377.79 |
| Cobalt | Teck-Cominco Prospect Park Upgrades | $ 25,000.00 |
| Cobalt | Energy Retrofit Municipal Buildings | $ 31,666.00 |
| Cobden | Combined flow reduction program | $ 178,945.00 |
| Cobourg | Construction of the Cobourg Multi-Use Community Centre | $ 9,133,333.00 |
| Cobourg | County of Northumberland/United Way Emergency Management System Headquarters/Food 4 All Warehouse | $ 458,333.00 |
| Cobourg | D'Arcy Street Reconstruction | $ 1,050,000.00 |
| Cobourg | Construction of a tertiary filtration unit | $ 483,333.00 |
| Cobourg | Rehabilitation of Factory Creek Bridge | $ 330,318.82 |
| Cochenour | Replacement of airport terminal building | $ 1,437,233.00 |
| Cochrane | Ferguson Subdivision | $ 150,000.00 |
| Cochrane | Genier Road Resurfacing | $ 1,187,600.00 |
| Cochrane | Rehabilitation of 8th Street and Chalmers Avenue | $ 1,845,040.00 |
| Cochrane | Replacement of watermains and storm sewer upgrades on Fifth Street West | $ 1,100,000.00 |
| Cockburn Island | Implementation of broadband - Cockburn Island | $ 62,500.00 |
| Coe Hill | Rehabilitation of former King's Highway No. 620, phase 3 | $ 652,252.00 |
| Colborne | Upgrade of the Colborne Wastewater Treatment Plant | $ 2,125,086.00 |
| Coldwater | Improvements to the Coldwater water distribution system | $ 1,500,000.00 |
| Coleman | Replacement of the Coleman Township water distribution system | $ 1,812,025.00 |
| Collingwood | Craigleith Provincial Park Visitor Facility Infrastructure Renewal | $ 53,500.00 |
| Collingwood | Downtown Collingwood Infrastructure Rehabilitation and Economic Revitalization | $ 2,000,000.00 |
| Collingwood | Improvements to the Collingwood Regional Airport | $ 441,000.00 |
| Conmee | Access Improvements to Library, Community Centre and Municipal Office | $ 50,000.00 |
| Cornwall | Highway 401 Centre Road Bridge rehabilitation | * |
| Cornwall | New Emergency Medical Services Headquarters Building | $ 1,700,000.00 |
| Cornwall | Brookdale Avenue Watermain | $ 700,000.00 |
| Cornwall | Historic Jail Kitchen and Courtyard | $ 90,000.00 |
| Cornwall | Cornwall Wastewater Treatment Plant | $ 18,500,000.00 |
| Cornwall | Construction of a watermain on Tollgate Road | $ 285,000.00 |
| Cornwall | Construction of the Cornwall multi sport facility | $ 9,221,465.00 |
| County Elgin | Rehabilitation of Calton Line | $ 1,814,465.34 |
| County of Brant | County Road 16 Rehabilitation | $ 2,100,000.00 |
| Courtright | Construction of the St. Clair Regional Wastewater Treatment Plant | $ 10,509,921.00 |
| Cramahe | Durham Street Reconstruction | $ 116,666.00 |
| Cramahe | Highway 401 - Herley Road Underpass Rehabilitation | $ 750,000.00 |
| Creemore | Upgrading Creemore Sewage Plant | $ 181,333.00 |
| Dawn-Euphemia | Watermain - Lambton Line-Dawn Valley | $ 274,000.00 |
| Dawson | Atwood Road #2 Upgrade | $ 29,333.00 |
| Deep River | Ridge Road Reconstruction | $ 1,310,000.00 |
| Delta | Renewal of Park Centre in Kagawong | $ 68,053.81 |
| Denbigh | Reconstruction of Matawatchan Road | $ 513,165.00 |
| Denbigh | Denbigh - Garage Addition | $ 43,685.00 |
| Desbarats | Recreation Centre - Safety and Energy Upgrades | $ 68,333.00 |
| Deseronto | Improvements to the Deseronto wastewater treatment system | $ 1,500,000.00 |
| Deseronto | Renovation of the Deseronto Community Centre | $ 675,000.00 |
| Devlin | Rehabilitation of Cain Road | $ 20,572.58 |
| Devon | Rehabilitation of the Devon Road | $ 86,108.95 |
| Dinorwic | Highway 17 - Melgund River and Nugget Creek bridges rehabilitation | * |
| Dobie | Installation of a rink dome in Dobie | $ 27,474.45 |
| Dorchester | Replacement of the Dorchester Bridge | $ 2,270,400.00 |
| Dorset | Moorelands Camp 100th Anniversary Build | $ 255,546.00 |
| Douglas | Rehabilitation of the Douglas Community Road Infrastructure | $ 100,480.00 |
| Douro-Dummer | Warsaw Community Centre | $ 50,000.00 |
| Douro-Dummer | Municipal Building Addition | $ 366,666.00 |
| Dresden | Dresden Storm Sewers | $ 1,000,000.00 |
| Drummond Centre | Drummond - Concession 1A | $ 364,273.00 |
| Drummond North Elmsley | Churchill Road Rehabilitation | $ 396,786.00 |
| Drummond/North Elmsley | Prestonvale Road Rehabilitation | $ 472,764.00 |
| Dryden | Water Meter Implementation | $ 600,000.00 |
| Dryden | Upgrade of the Dryden Sewage Treatment Plant | $ 9,966,666.00 |
| Dubreuilville | Realignment of the Intersection of Rue de l'Église and Rue des Pins | $ 85,000.00 |
| Dundalk | Library and Ontario Provincial Police Emergency Services Office | $ 340,000.00 |
| Dundalk | Rehabilitation of the water supply system | $ 251,167.00 |
| Dundalk | Renovations to the Dundalk Memorial Park | $ 167,000.00 |
| Dundas | Dundas Valley School of Art | $ 2,450,000.00 |
| Dungannon | Replacement of the Mill Line bridge | $ 102,300.00 |
| Dunnville | Rock Point Park Infrastructure | $ 255,000.00 |
| Durham | Downtown Revitalization | $ 200,000.00 |
| Dutton/Dunwich | Improvements to Sewer System | $ 341,667.00 |
| Dutton/Dunwich | Chalmers Line Culvert Replacement | $ 105,000.00 |
| Dutton/Dunwich | Replacement of Celtic Culvert | $ 164,000.00 |
| Dysart | Renovations to the West Guilford Community Centre | $ 40,000.00 |
| Dysart | Haliburton Lake Road rehabilitation | $ 124,492.00 |
| Dysart et al | Road #1 Rehabilitation | $ 300,000.00 |
| Dysart et al | Blue Hawk Culvert Replacement | $ 266,666.00 |
| Eagle River | Renovation of the Cascade Road Bridge | $ 151,416.00 |
| Ear Falls | Ear Falls Multiplex | $ 2,710,810.00 |
| Earlton | Upgrade of airport | $ 12,810.73 |
| Earlton | Resurfacing of Tenth Street | $ 188,856.77 |
| Earlton Notherly | Highway 11 - Englehart River and Aidie Creek bridges rehabilitation | * |
| East Ferris | Improvements to the East Ferris Community Centre | $ 1,166,766.00 |
| East Garafraxa | 10th Line Improvement Project | $ 224,586.00 |
| East Garafraxa | Improvements to A Line | $ 82,736.04 |
| East Gwillimbury | Administration Building Renovation | $ 233,334.00 |
| East Gwillimbury | Boag Road Bridge - East Gwillimbury | $ 250,000.00 |
| East Gwillimbury | Emergency Medical Services Central Support Facility and Health Connection/Contact Centre | $ 7,333,333.00 |
| East Gwillimbury | Garfield Material Recovery Facility Upgrades | $ 2,533,333.00 |
| East Hawkesbury | Concession Road 1 Reconstruction | $ 215,800.00 |
| East Hawkesbury | Rehabilitation of Bridge No. 5 | $ 178,907.00 |
| East Ignace | Highway 17 - Gulliver River bridge rehabilitation | * |
| East Zorra Tavistock | 10th Line Road Improvements | $ 221,778.00 |
| East Zorra Tavistock | 16th Line Resurfacing | $ 697,968.00 |
| East Zorra-Tavistock | Rehabilitation of Maplewood Sideroad and 15th Line in Tavistock | $ 510,866.00 |
| Eastern Ontario | Eastern Ontario Regional Broadband Network | $ 55,000,000.00 |
| Eby | Beverly Street Improvement | $ 16,371.00 |
| Edwardsburg/Cardinal | Grain Storage Expansion | $ 1,841,704.00 |
| Edwardsburgh/Cardinal | Development of the Port of Prescott | $ 11,575,412.00 |
| Eganville | Alice Street Rehabilitation | $ 275,000.00 |
| Eganville | Upgrade of the Eganville wastewater system | $ 356,500.00 |
| Eganville | Upgrades to the Eganville Water Treatment Plant and Universal Water Meter Installation | $ 300,000.00 |
| Elizabethtown-Kitley | Kitley Line 2 Reconstruction | $ 66,666.00 |
| Elizabethtown-Kitley | Reconstruction of Second Concession Road in Elizabethtown-Kitley | $ 887,604.00 |
| Elk Lake | Improvements to drainage on Grey Street | $ 66,711.58 |
| Elk Lake | Replacement of the Makobe River Bridge | $ 191,000.00 |
| Elliot Lake | Pearson Drive Watermain | $ 307,230.00 |
| Elliot Lake | Highway 108 Sanitary Sewer Line | $ 598,274.00 |
| Elmira | Samuel Street and Area Reconstruction | $ 866,666.00 |
| Elmira | Snyder Avenue Reconstruction | $ 866,666.00 |
| Elmira | Replacement and upgrading of the water and wastewater services | $ 878,727.00 |
| Elora | Reconstruction of Church Street (Elora) | $ 443,333.00 |
| Emo | Retrofitting the Emo-LaVallee Community Centre | $ 12,136.00 |
| Emo | Fisher Road Rebuild Project | $ 41,667.00 |
| Emsdale | Public Works Shop and Office Roof | $ 14,000.00 |
| Englehart | Englehart trunk sanitary sewer and water main improvements | $ 729,308.00 |
| Englehart | Improvements to Sprucegrove River Road | $ 28,350.00 |
| Englehart | Replacement of the lagoon lift station pump | $ 50,340.22 |
| Enniskillen | Shiloh Line Rehabilitation | $ 167,870.00 |
| Enniskillen | Marthaville Road Rehabilitation | $ 173,049.00 |
| Enniskillen | Rehabilitation of Oil Springs Line | $ 80,000.00 |
| Erin | Reconstruction of Sideroad 5 - Erin | $ 316,667.00 |
| Erin | Deer Pit Storm Water Facility | $ 403,334.00 |
| Erinsville | Rehabilitation of County Road 41 | $ 1,303,659.00 |
| Espanola | Avery Drive reconstruction and force main upgrade | $ 766,500.00 |
| Espanola | Improvements to Panache Lake Road | $ 107,654.47 |
| Essa | Rehabilitation and Repaving of Various Urban Streets in Angus Area | $ 114,322.00 |
| Essa | Replacement of the Angus Branch of the Essa Public Library in the Township of Essa | $ 786,666.00 |
| Essex | Sustainability of the Civic Centre Facility | $ 206,667.00 |
| Essex | McGregor Library and Community Centre | $ 600,000.00 |
| Essex | County Road 18 Pavement Preservation | $ 172,402.00 |
| Essex | County Road 23 and County Road 8 Intersection Improvement | $ 416,667.00 |
| Essex | County Road 23 from Highway 3 to County Road 27 and County Road 27 from Highway 3 to County Road 23 Pavement Preservation | $ 321,282.00 |
| Essex | County Road 31/3rd Concession Intersection Improvement | $ 416,667.00 |
| Essex | Construction of Harrow Soccer Complex | $ 779,167.00 |
| Essex | Reconstruction of Dunn Road | $ 1,238,306.00 |
| Eton | Rehabilitation of Adam's Road in Eton | $ 51,055.21 |
| Evanturel | Rehabilitation of Wendigo Road | $ 184,840.00 |
| Exeter | Implementation of a municipal flood diversion system in Exeter | $ 462,550.00 |
| Fallbrook | Replacement of Ennis Road Bridge | $ 316,667.00 |
| Faraday | Faraday Landfill Capacity Reclamation | $ 123,837.00 |
| Faraday | Construction of the Faraday Landfill Leachate Management System | $ 778,264.00 |
| Fauquier | Groundhog River Park | $ 42,375.00 |
| Fenelon Falls | Construction of the Fenelon Falls recreation complex | $ 3,500,000.00 |
| Fergus | Reconstruction of Side Road 19 | $ 1,800,000.00 |
| Fergus | Expansion of the Wellington County Museum and Archives | $ 1,152,897.00 |
| Finch | Construction of Salt Storage Facilities | $ 1,850,000.00 |
| Finch | Renovations to the North Stormont Arena | $ 374,087.85 |
| Flinton | Replacement of Wagers Bridge | $ 249,596.15 |
| Florence | Improvements to the Florence Community Centre | $ 559,333.00 |
| Foleyet | Nat River Bridge Coating | $ 200,000.00 |
| Foleyet | Foleyet Community Hall Renovations | $ 16,417.00 |
| Foleyet | Drinking water system improvement | $ 32,175.00 |
| Foleyet | Rehabilitation of Finn Hill in Foleyet | $ 26,430.48 |
| Foleyet | Renovation to Office Building | $ 33,000.00 |
| Fonthill | Reconstruction of Pelham Street | $ 852,572.00 |
| Fordwich | Reconstruction of County Road 30 (Patrick Street) | $ 404,830.28 |
| Fort Erie | Ridge Road Infrastructure Improvements | $ 1,961,333.00 |
| Fort Erie | Frenchman's Creek Sewage Servicing | $ 6,666,666.00 |
| Fort Erie | Construction of the North Crescent Park storm drainage system | $ 1,090,899.86 |
| Fort Frances | Biomass Road Reconstruction and Infrastructure Renewal (Water and Sanitary Sewer) Project | $ 571,365.00 |
| Fort Frances | Reconstruction of the Fort Frances public library and technology centre | $ 983,690.00 |
| Fort Frances | Replacement of Grit Removal Equipment at the Sewage Treatment Plant | $ 256,630.00 |
| Frankford | Batawa-Frankford Water and Wastewater Development | $ 1,666,666.00 |
| French River | Rehabilitation of Shaw Road | $ 500,000.00 |
| French River | Expansion of the Noëlville landfill site | $ 347,600.00 |
| French River | Highway 11 - French River and Pickerel River bridges rehabilitation | * |
| Front of Yonge | Road Resurfacing Program | $ 180,464.00 |
| Front of Yonge | Reconstruction and Drainage Improvements - Ballycanoe and Escott-Yonge Townline Road | $ 134,466.00 |
| Front of Yonge | Highway 401 - Rehabilitation of Donovan Creek Bridge | $ 250,000.00 |
| Front of Yonge, Athens, Rideau Lakes | County Road 5 Resurfacing | $ 1,070,000.00 |
| Frontenac | Construction of a new Sydenham library | $ 726,667.00 |
| Frontenac Islands | Road Rehabilitation Project | $ 342,333.00 |
| Frontenac Islands | Wolfe Island Wind Plant - Haul Roads Rehabilitation (Stage 2) | $ 158,666.00 |
| Galway-Cavendish and Harvey | South Salmon Lake Road | $ 66,666.00 |
| Galway-Cavendish and Harvey | Kennedy Drive Rehabilitation | $ 133,333.00 |
| Galway-Cavendish and Harvey | Buckhorn Welcome and Tourist Information Centre | $ 133,333.00 |
| Gananoque | Sanitary Sewer Infiltration Control Project | $ 150,000.00 |
| Gananoque | Sewage Lagoon Desludging Project | $ 200,000.00 |
| Gananoque | Brock Street reconstruction | $ 2,102,999.00 |
| Georgian Bluffs | Park Head Culvert Replacement | $ 97,000.00 |
| Georgian Bluffs | 24th Street West Drainage Improvements | $ 163,170.00 |
| Georgian Bluffs | Big Bay Culvert Replacement | $ 55,000.00 |
| Georgian Bluffs | Construction of an anaerobic treatment and electrical power plant | $ 833,333.00 |
| Georgian Sands | Replacement of Georgian Sands watermains | $ 1,088,817.00 |
| Georgina | Old Homestead Road Resurfacing | $ 520,000.00 |
| Georgina | Georgina Water Treatment Plant Upgrade | $ 2,400,000.00 |
| Georgina | Construction of the Georgina civic centre multi-season outdoor recreation campus | $ 4,736,458.00 |
| Geraldton | Upgrades to the Geraldton sewage works | $ 597,333.00 |
| Geraldton | Rehabilitation of Airport Road | $ 1,862,553.00 |
| Gillies | PeeDee Park Enhancement | $ 3,000.00 |
| Gillies | Emergency Helipad Upgrade | $ 10,000.00 |
| Glencoe | Expansion of the Glencoe Wastewater Treatment Facility | $ 1,829,167.00 |
| Glencoe | Glencoe standpipe replacement | $ 1,926,833.00 |
| Glenora | Lake on the Mountain Vault Toilet and Glenora Fisheries Roof | $ 150,000.00 |
| Goderich | Point Farms Park Infrastructure Development | $ 322,500.00 |
| Goderich | Construction of ultraviolet disinfection facilities | $ 240,701.52 |
| Goderich/Ashfield-Colborne-Wawanosh (Huron) | Highway 21 - Goderich to Sheppardton | $ 4,900,000.00 |
| Gogama | Upgrades to wastewater treatment system | $ 20,984.85 |
| Gordon/Barrie Island | Gordon/Barrie Island Parks Rehabilitation | $ 62,490.00 |
| Gordon/Barrie Island | Gore Bay Manitoulin Airport Runway Rehabilitation | $ 1,685,992.50 |
| Gore Bay | Renovations to the Gore Bay Memorial Arena | $ 106,666.00 |
| Gore Bay | Construction of New Fire Hall | $ 113,333.00 |
| Gore Bay | Improvements to Gordon and Barrie Island roads | $ 508,333.00 |
| Gore Bay | Replacement of water lines on Gore Street | $ 391,988.00 |
| Gorham | Lappe Volunteer Fire Department Hall Expansion | $ 48,600.00 |
| Gorham Township | Rehabilitation of Hazelwood Drive | $ 112,250.00 |
| Goulais River | Improvements to Haviland Shore Drive | $ 45,000.00 |
| Grand Bend | New and Enhanced Trails in Pinery Park | $ 62,500.00 |
| Grand Bend | Pinery Park Infrastructure | $ 4,000,000.00 |
| Grand Bend | Pinery Road Rehabilitation | $ 350,000.00 |
| Grand Bend | Grand Bend Main Street Redevelopment | $ 870,830.00 |
| Grand Bend | Expansion and Upgrade of the Grand Bend Sewage Treatment Facility | $ 7,450,000.00 |
| Grand Valley | Grand Valley Wastewater Servicing Program | $ 5,213,652.00 |
| Gravenhurst | Expansion of the Centennial Centre and aquatic facility in Gravenhurst | $ 6,175,716.00 |
| Greater Madawaska | Mill Street | $ 76,833.00 |
| Greater Madawaska | Pucker Street | $ 266,667.00 |
| Greater Napanee | Rehabilitation of Camden Road | $ 179,608.00 |
| Greater Napanee | Rehabilitation of Thomas Street | $ 463,791.00 |
| Greater Napanee | Rehabilitation of South Shore Road | $ 1,979,285.00 |
| Greater Sudbury | Science North - Building Exterior Retrofit | $ 500,000.00 |
| Greater Sudbury | Science North - Building Interior Retrofit | $ 275,000.00 |
| Greater Sudbury | Science North Infrastructure Renewal | $ 2,295,431.00 |
| Greater Sudbury | Highway Resurfacing - Sudbury and North Bay areas | $ 500,000.00 |
| Greater Toronto Area / région du Grand Toronto | GO Transit Improvements | $ 250,000,000.00 |
| Greely | New Library in Greely | $ 400,000.00 |
| Greenwood | Restoration and upgrades to the Pickering Museum Village | $ 295,000.00 |
| Grey Highlands | Flesherton Arena and Community Hall Complex | $ 150,000.00 |
| Grey Highlands | Construction of the Grey Highlands Library - Flesherton Branch | $ 456,434.00 |
| Grimsby | Watermain Replacement Project | $ 441,660.00 |
| Grimsby | West Niagara YMCA | $ 6,000,000.00 |
| Grimsby | Baker Road Wastewater Treatment Plant Upgrade | $ 8,333,334.00 |
| Grimsby | Book Road Reconstruction | $ 80,000.00 |
| Grimsby | Grimsby Town Hall Redevelopment/Renovation | $ 2,187,660.00 |
| Gross & Burt | Liskeard Lumber Road Repairs | $ 140,000.00 |
| Gross & Burt | North Englehart Management Unit (EMU) Road rehabilitation | $ 50,000.00 |
| Guelph | River Run Performing Arts Centre Rehabilitation | $ 757,166.00 |
| Guelph | Road Reconstruction - Norfolk Street | $ 1,800,000.00 |
| Guelph | Road Reconstruction - Speedvale Avenue | $ 1,333,333.00 |
| Guelph | Road Reconstruction - Stevenson Street | $ 1,500,000.00 |
| Guelph | Road Reconstruction - Westmount Road | $ 1,000,000.00 |
| Guelph | Sidewalk Rehabilitation | $ 1,000,000.00 |
| Guelph | Stone Road Bicycle Lanes | $ 750,000.00 |
| Guelph | Township Storage Building | $ 165,333.00 |
| Guelph | Transit Facility Rehabilitation | $ 592,166.00 |
| Guelph | Upgrades to the Transit Terminal Infrastructure | $ 2,666,666.00 |
| Guelph | Victoria Road North - Ferndale to City Limit | $ 800,000.00 |
| Guelph | Victoria Road South | $ 833,333.00 |
| Guelph | Wyndham Street: Carden to Wellington - Guelph | $ 2,800,000.00 |
| Guelph | Intersection - Speedvale/Stevenson | $ 833,300.00 |
| Guelph | Intersection - Victoria/Woodlawn | $ 750,000.00 |
| Guelph | Intersection Improvement - Eramosa and Delhi | $ 790,000.00 |
| Guelph | Intersection Improvement - Victoria and Eastview | $ 500,000.00 |
| Guelph | Main Fire Station Rehabilitation | $ 397,833.00 |
| Guelph | Maltby Road - Gordon to Hanlon | $ 933,300.00 |
| Guelph | Paving Woodlawn Road | $ 379,166.00 |
| Guelph | Dawson Road - Shelldale to Speedvale | $ 900,000.00 |
| Guelph | Edinburgh Road - Speedvale to London | $ 833,300.00 |
| Guelph | Family and Children's Services | $ 1,433,333.00 |
| Guelph/Eramosa | Construction of the Marden Park Recreation Facility | $ 2,066,517.00 |
| Hagersville | Improvements to the Hagersville Wastewater Treatment Plant | $ 3,077,381.00 |
| Haileybury | Albert Street Reconstruction | $ 333,333.00 |
| Halton Hills - Acton | Acton Branch Library Replacement | $ 1,166,666.00 |
| Hamilton | Ronald McDonald House | $ 4,333,333.00 |
| Hamilton | Sir Allen MacNab Rehabilitation Project | $ 1,000,000.00 |
| Hamilton | Sir Wilfrid Laurier Rehabilitation | $ 500,000.00 |
| Hamilton | Stone Church Water Reservoir and Pumping Station Upgrades | $ 1,500,000.00 |
| Hamilton | Upgrades to the Ferguson Pumping Station | $ 6,666,667.00 |
| Hamilton | Upgrades to the Woodward Water Treatment Plant | $ 14,000,000.00 |
| Hamilton | Westmount Recreation Centre | $ 7,000,000.00 |
| Hamilton | Kenilworth Water Reservoir and Pumping Station Upgrades | $ 2,266,667.00 |
| Hamilton | Lister District Energy Expansion - Hamilton | $ 400,000.00 |
| Hamilton | Lower Stoney Creek Recreation Centre | $ 4,333,333.00 |
| Hamilton | Morgan Firestone Arena Twinning | $ 3,425,000.00 |
| Hamilton | Construction of a new cargo facility at the Hamilton International Airport | * |
| Hamilton | Building Upgrades/Efficiency Upgrades - Big Brothers Big Sisters of Hamilton and Burlington facility | $ 416,250.00 |
| Hamilton | Coronation Arena | $ 1,000,000.00 |
| Hamilton | Emergency Services Training Facility/Emergency Operations Centre | $ 8,333,333.00 |
| Hamilton | Energy Recovery - Biogas and Digester | $ 10,000,000.00 |
| Hamilton | Energy Retrofit - 700 Woodward Ave | $ 1,500,000.00 |
| Hamilton | Hillcrest Water Reservoir Upgrades | $ 2,866,667.00 |
| Hamilton | Improvements to the Woodward Avenue wastewater treatment plant | $ 100,000,000.00 |
| Hamilton | Desjardins Canal bridge rehabilitation | * |
| Hamilton | Highway 6 Underpass Plains Road rehabilitation | * |
| Hamilton | Road resurfacing of Highway 403 between Highway 6 and Aberdeen Avenue | $ 7,800,000.00 |
| Hamilton, Halton and Peel Regions | Bridge Repairs - Hamilton, Halton and Peel | $ 1,100,000.00 |
| Hanover | Rehabilitation and Expansion of Water Treatment Plant | $ 1,200,000.00 |
| Hanover | 7th and 8th Avenue Sanitary Sewer Extension | $ 1,050,000.00 |
| Hanover | Construction of the Hanover Regional Recreation Complex | $ 3,467,211.58 |
| Harley | Belle Vallee Road - Gravel Resurfacing | $ 86,000.00 |
| Harley | Development Road East Rehabilitation | $ 140,000.00 |
| Harris | Sale Barn Road | $ 4,333.00 |
| Harris | Vahey Road | $ 2,333.00 |
| Harris Hill | Rehabilitation of local roads in Spohn Township | $ 42,515.00 |
| Harriston | Harriston Community Centre Upgrades | $ 62,333.00 |
| Harriston | Upgrade of the Harriston Sewage Collection and Treatment System | $ 637,666.00 |
| Hastings Highlands | Reconstruction of Peterson Road | $ 700,000.00 |
| Havelock | Decommissioning of the Havelock Lagoons | $ 153,333.00 |
| Hawkesbury | Dehumidifer - Sports Complex in Hawkesbury | $ 53,333.00 |
| Hawkesbury | Upgrade of the Hawkesbury Wastewater Treatment Plant | $ 11,882,988.00 |
| Hawkesville | Improvements to Steffler Road | $ 332,267.00 |
| Head, Clara and Maria | Admininistrative Building Lighting Upgrades | $ 5,833.00 |
| Head, Clara and Maria | Administration Building Insulation Upgrades | $ 4,167.00 |
| Head, Clara and Maria | Garage Energy Savings Retrofit | $ 12,833.00 |
| Hearst | Rouse Street Rehabilitation | $ 230,500.00 |
| Hearst | Tremblay Street Rehabilitation | $ 95,000.00 |
| Hearst | Wastewater lagoon and system upgrade - Hearst | $ 323,000.00 |
| Hearst | Allen Street Rehabilitation | $ 380,000.00 |
| Hearst | Club Action Hearst Community Centre | $ 692,333.00 |
| Hearst | Fontaine Drive rehabilitation | $ 289,000.00 |
| Hearst | Garnett Street Rehabilitation | $ 55,500.00 |
| Hearst | Improvements to the Hearst Community Curling Club | $ 650,650.00 |
| Hearst | Rehabilitation of the Hearst Water Treatment Plant | $ 390,700.00 |
| Highlands East | Road No. 503 Rehabilitation | $ 374,667.00 |
| Highlands East | Silent Lake Park Shelter Construction | $ 45,000.00 |
| Highlands East | Hadlington Road | $ 250,200.00 |
| Hilliardton | Construction of a Sand and Salt Shed | $ 37,846.39 |
| Hillsburgh | Hillsburgh Street Rehabilitation | $ 286,667.00 |
| Hilton | Hamilton Drive Rehabilitation | $ 81,932.00 |
| Hilton Beach | Hilton Beach Community Centre Rehabilitation | $ 51,056.00 |
| Horton | Reconstruction of Garden of Eden Road | $ 651,667.00 |
| Howick | Spencetown Road Reconstruction | $ 108,000.00 |
| Howick | Municipal Public Works Garage Addition | $ 69,000.00 |
| Howick | Gough Road Reconstruction | $ 104,000.00 |
| Hudson | Road B - Rehabilitation | $ 60,000.00 |
| Hudson | Sawmill Road Rehabilitation | $ 145,000.00 |
| Hudson | Community Hall Renewal | $ 61,920.00 |
| Huntsville | Port Sydney Fire Hall | $ 400,000.00 |
| Huntsville | Renovations to Community Living Huntsville Facilities | $ 533,333.00 |
| Huntsville | Construction of Brunel Road sports park | $ 766,775.00 |
| Huntsville | Revitalization of Hanes Road | $ 941,004.56 |
| Huntsville and Parry Sound | Highway Resurfacing - Huntsville and Parry Sound areas | $ 375,000.00 |
| Huron East | Bridge Guiderails 2010 | $ 13,333.00 |
| Huron East | County Road 14 Resurfacing | $ 302,866.00 |
| Huron East | County Road 19 Resurfacing | $ 571,030.00 |
| Huron East | Cranbrook McNabb Resurfacing and Bridge Deck Waterproofing | $ 453,333.00 |
| Huron Park | Huron Park Industrial Area Reconstruction | $ 2,266,666.00 |
| Huron Shores | Rehabilitation of Maple Ridge Road | $ 28,667.00 |
| Huron Shores | Dayton Road Loop (sections 9-11) | $ 133,333.00 |
| Huron Shores | Upgrade of Ansonia/Hopper Loop | $ 362,083.00 |
| Huron-Kinloss | Concession 4 Surface Paving | $ 333,333.00 |
| Ignace | West Street Rehabilitation | $ 490,955.00 |
| Ignace | Lakeshore Drive Rehabilitation | $ 513,333.00 |
| Ignace | Rehabilitation of Pine Street | $ 411,283.00 |
| Indian River | Reconstruction of Indian River Line and Bridge | $ 219,383.69 |
| Ingersoll | Wonham Street North Reconstruction | $ 575,803.00 |
| Ingersoll | Ingersoll Water Shop | $ 233,333.00 |
| Ingersoll | King Street West Reconstruction | $ 1,422,830.00 |
| Ingersoll | Reconstruction of Clark Road East - Ingersoll | $ 1,515,123.00 |
| Ingleside, Osnabruck Centre | Installation of Watermains in Osnabruck Centre | $ 673,716.00 |
| Innerkip | Improvements to Coleman and Burton streets | $ 246,069.00 |
| Innisfil | Improvements to Highway 400 Detour Routes | $ 333,333.00 |
| Innisfil | Innisfil Beach Park Improvements | $ 333,300.00 |
| Innisfil | Precinct 3 Reconstruction - Innisfil Beach Road | $ 675,000.00 |
| Inverhuron | Extension of water distribution and sanitary sewage sollection facilities | $ 3,038,200.00 |
| Iroquois Falls | Reconstruction of Union and Gauthier Roads | $ 560,846.00 |
| Jacques Township | Improvements to Howcum Lake Road | $ 100,800.00 |
| Jocelyn | Construction and rehabilitation of all-season trails | $ 101,000.00 |
| Johnson | Johnson and Tarbutt Landfill Expansion | $ 78,650.00 |
| Johnson | Government Road Improvements | $ 58,000.00 |
| Johnson | Rehabilitation of Gordon Lake Road | $ 146,962.56 |
| Johnson | Replacement of Gordon Lake Road Bridge | $ 120,000.00 |
| Johnstown | Bridge rehabilitation work on Highway 16 | * |
| Joly | Airport Road Widening | $ 125,000.00 |
| Kagawong | Bridal Veil Falls and Kagawong River Valley project | $ 7,176.00 |
| Kagawong | Extension of Rural Route 2 in Englehart | $ 30,866.30 |
| Kapuskasing | Maple Drive Rehabilitation | $ 400,000.00 |
| Kapuskasing | Brock Crescent Rehabilitation | $ 330,000.00 |
| Kapuskasing | Cedar Street Rehabilitation - Kapuskasing | $ 1,153,333.00 |
| Kapuskasing | Upgrades to the Kapuskasing waste water treatment plant | $ 2,504,666.00 |
| Kawartha Lakes | North West Trunk | $ 1,666,666.00 |
| Kawartha Lakes | Rehabilitation of Kawartha Lakes Road 45 | $ 1,233,333.00 |
| Kearney | Rehabilitation of Arterial Road 518E | $ 1,394,334.00 |
| Kemptville | North Grenville Public Library | $ 1,333,870.00 |
| Kemptville | Boundary Road Rebuild | $ 600,000.00 |
| Kemptville | Construction of Pinehill Road roundabout | $ 132,957.45 |
| Kenora | Mather-Walls House Repairs | $ 150,000.00 |
| Kenora | Birchcliff Group Home | $ 733,333.00 |
| Kenora | Highway 17 - East and West of Kenora | $ 3,050,000.00 |
| Kenora | Highway 17 Gateway Rehabilitation Project | $ 2,333,333.00 |
| Kenora | Creation of Lake of the Woods Discovery Centre | $ 1,038,503.00 |
| Kenora | Enhancements to the City of Kenora water distribution system | $ 1,000,000.00 |
| Kenora | Hard surfacing Bigstone Bay Road | $ 23,244.62 |
| Kenora | Improvements to McKenzie Portage Road | $ 19,000.00 |
| Kenora | Refurbishment of Inglis Lake Road Surface | $ 3,239.92 |
| Kenora | Twinning of Highway 17 | $ 50,000,000.00 |
| Kenora-Rainy River | Highway 71 - Log River tributary culvert rehabilitation | * |
| Kerns | Sand/Salt Shed | $ 89,496.00 |
| Killaloe, Hagarty and Richards | Stone Church Road and Cardinal Road Rehabilitation | $ 21,000.00 |
| Killaloe, Hagarty and Richards | Cameron Street Rehabilitation | $ 14,333.00 |
| Killaloe, Hagarty and Richards (Renfrew) | Round Lake Residential Ontario Ranger Camp Renewal | $ 440,000.00 |
| Killarney | New Trail in Killarney Park | $ 45,000.00 |
| Killarney | Renewal of the Killarney Residential Ontario Ranger Camp | $ 550,000.00 |
| Killarney | Expansion of the Killarney waste disposal site | $ 153,000.00 |
| Kincardine | Connaught Park - Accessibility Project | $ 100,000.00 |
| Kincardine | Replacement of the Huron-Terrace Bridge | $ 635,566.00 |
| Kincardine | Restoration of the Kincardine Centre for the Arts | $ 331,100.00 |
| King | Construction of a new Schomberg Arena | $ 4,720,000.00 |
| King | Highway 27 Resurfacing | $ 3,033,333.00 |
| King City | Resurfacing roads in King City | $ 568,444.00 |
| Kingsford | Improvement of Off Lake Road in Emo | $ 31,500.00 |
| Kingston | Robert Meek Revitalization | $ 300,000.00 |
| Kingston | Sanitary Sewer System - Extraneous Flow Reduction and Asset Rehabilitation | $ 833,333.00 |
| Kingston | Water Master Plan Implementation - Bayridge Drive | $ 2,533,334.00 |
| Kingston | Water Master Plan Implementation - Front Road | $ 3,333,333.00 |
| Kingston | Water Master Plan Implementation - O’Connor Drive Reservoir and Discharge Header | $ 4,083,333.00 |
| Kingston | Isabel Bader Centre for the Performing Arts at Queen's University | $ 15,000,000.00 |
| Kingsville | Cull Drive Infrastructure Renewal | $ 669,500.00 |
| Kingsville | Dual Salt Storage Facility - Maintenance Depot | $ 166,667.00 |
| Kingsville | Improvements to the Kingsville Sewer System | $ 3,735,366.00 |
| Kirkland Lake | Renewal of Esker Lake Ontario Ranger Camp | $ 230,000.00 |
| Kirkland Lake | Kirkland Lake Wastewater Improvement Project | $ 16,000,000.00 |
| Kirkland Lake | Reconstruction of Taylor Avenue and Prospect Avenue | $ 659,056.85 |
| Kitchener | Road Rehabilitation | $ 1,400,000.00 |
| Kitchener | Sewer and Watermain Rehabilitation | $ 833,334.00 |
| Kitchener | Storm Water Infrastructure Rehabilitation | $ 690,000.00 |
| Kitchener | The Family Centre (Family and Children's Services of Waterloo Region) | $ 2,667,000.00 |
| Kitchener | McLennan Park Development | $ 1,000,000.00 |
| Kitchener | Accessibility Improvements | $ 334,000.00 |
| Kitchener | Centre in the Square Rehabilitation | $ 400,000.00 |
| Kitchener | City Hall Lighting | $ 334,000.00 |
| Kitchener | Consolidated Maintenance Facility Improvements | $ 4,666,667.00 |
| Kitchener | Consolidated Maintenance Facility Solar Roof | $ 1,366,667.00 |
| Kitchener | Energy Management Systems | $ 500,000.00 |
| Kleinburg | McMichael Grounds Infrastructure Repairs | $ 2,100,000.00 |
| Komoka | Middlesex Centre community wellness and recreation centre | $ 8,102,641.00 |
| L'Orignal | Improvements to the King Street Sewage Pumping Station | $ 192,269.00 |
| Lafontaine | Redevelopment of the Lafontaine Pavilion in Perkinsfield | $ 220,000.00 |
| Laird | Laird Hall Rehabilitation | $ 10,000.00 |
| Laird | Restoration and redirection of disposal site | $ 95,095.00 |
| Lake of Bays | Winter Sand Storage Building | $ 236,666.00 |
| Lake of the Woods | Frenchman's Rock Road Upgrade | $ 54,333.00 |
| Lakefield | Construction of the Lakefield elevated storage tank | $ 1,846,500.00 |
| Lakefield | Replacement of Deer Bay Bridge | $ 788,113.00 |
| Lakehurst | Rehabilitation of the Lakehurst Hall | $ 200,000.00 |
| Lakeshore | Salt Storage Facility - Tilbury North Depot | $ 75,000.00 |
| Lakeshore | County Road 2 Pavement Preservation | $ 410,213.00 |
| Lakeshore | County Road 21 Pavement Preservation | $ 106,582.00 |
| Lakeshore | County Road 22 Improvement Program | $ 2,632,465.00 |
| Lakeshore | County Road 25 from County Road 42 to Highway 401 Pavement Rehabilitation | $ 254,971.00 |
| Lakeshore | County Road 42 from County Road 25 to County Road 27 pavement rehabilitation | $ 409,172.00 |
| Lakeshore | County Road 42 Pavement Preservation | $ 793,097.00 |
| Lakeshore | County Road 8 Pavement Preservation | $ 168,782.00 |
| Lakeshore | Emergency Medical Services Base - Lakeshore | $ 466,667.00 |
| Lakeshore | Construction of the Lakeshore Multi-Use Recreational Facility | $ 17,300,000.00 |
| Lambton Shores | Forest Water Distribution System Upgrade | $ 2,327,895.00 |
| Lanark Highlands | Galbraith Road Improvements | $ 501,890.00 |
| Lanark Highlands | Highland Line Improvements | $ 484,232.00 |
| Langton | Langton Arena Upgrades | $ 250,000.00 |
| Lansdowne | Charleston Lake Park Shelter Construction | $ 45,000.00 |
| Lansdowne | Improvements to the Lansdowne drinking water system | $ 320,834.00 |
| Lappe | Remediation of Trout Lake Waste Transfer and Recycling Facility | $ 215,339.13 |
| Larder Lake | Larder Lake Municipal Complex | $ 268,469.00 |
| Larder Lake | Renovation and Relocation of the Larder Lake Public Library | $ 86,333.00 |
| LaSalle | Front Road Infrastructure and Public Safety Renewal | $ 2,000,000.00 |
| LaSalle | Construction of Laurier Road extension and the Highway 3/Highway 401/Windsor-Essex Parkway Interchange | $ 6,000,000.00 |
| LaSalle | Improvements to Malden Road | $ 3,416,633.00 |
| Latchford | Cosens Avenue - Murphy Mill Extension | $ 25,000.00 |
| Latchford | Replacement of the roof at the Fred Keenan Centre | $ 20,000.00 |
| Laurentian Valley | Rehabilitation of Bruham Avenue Watermain | $ 100,000.00 |
| LaVallee | Pyne Road Rehabilitation | $ 19,000.00 |
| Leamington | New Administration Building | $ 4,166,666.00 |
| Leamington | County Road 14 Pavement Preservation | $ 340,507.00 |
| Leamington | East Side Arterial Road | $ 1,799,428.00 |
| Leamington | Emergency Medical Services - Leamington | $ 500,000.00 |
| Leamington | Erie-Seacliff Intersection Improvements | $ 866,666.00 |
| Leamington | Upgrade of the Leamington Pollution Control Centre - Phases 4 and 5 | $ 6,000,000.00 |
| Leamington | Development of Seacliff Park in Leamington | $ 1,057,696.00 |
| Leeds and the Thousand Islands | Maple Grove Road | $ 280,000.00 |
| Levack | Windy Lake Park Shelter Construction | $ 45,000.00 |
| Levack Onaping | Rehabilitation of Ministic Lake Road in Levack Onaping | $ 42,281.00 |
| Limerick | Pleasure Bay Road Rehabilitation | $ 179,064.00 |
| Lincoln | Regional Road 73 (Fly Road) Reconstruction and upgrading | $ 900,000.00 |
| Lincoln | Improvements to Prince William Street | $ 366,667.00 |
| Lincoln | Beamsville arena and library complex | $ 5,000,000.00 |
| Lindsay | Homeward Bound | $ 400,000.00 |
| Lion's Head | Construction of Sand/Salt Storage Facilities | $ 272,000.00 |
| Listowel | Rehabilitation of North Perth Administration Building | $ 1,200,000.00 |
| Listowel | Listowel wastewater and water infrastructure renewal | $ 2,106,167.00 |
| Little Currrent | Recreation Centre energy conservation upgrades | $ 136,967.00 |
| Lombardy (Rideau Lakes) | South Elmsley Hall Renovation/Addition | $ 96,500.00 |
| London | Replacing Arena Lights - Kinsmen Arena | $ 30,000.00 |
| London | Replacing Arena Lights - Nichols Arena | $ 40,000.00 |
| London | Replacing Arena Lights - Stronach Arena | $ 30,000.00 |
| London | Replacing the Roof and Compressors at Carling Arena | $ 206,666.00 |
| London | Roof Replacement - Farquharson Arena | $ 206,666.00 |
| London | Site Improvements at Exeter Road Operations Centre | $ 190,000.00 |
| London | Skyway Industrial Park - Phase 2 | $ 2,116,666.00 |
| London | South London - Eden Avenue Storm Sewer Installation | $ 466,666.00 |
| London | Thames Valley Parkway - Main Branch | $ 450,000.00 |
| London | Thames Valley Parkway - North Branch | $ 500,000.00 |
| London | The Grand Theatre Rehabilitation Project | $ 919,792.00 |
| London | Transit Building Repairs | $ 2,360,000.00 |
| London | Veterans Memorial Parkway | $ 233,000.00 |
| London | Walnut/Kensington Area Sanitary and Storm Sewer Replacement | $ 300,000.00 |
| London | Wellington Road Gateway | $ 900,000.00 |
| London | Hutton House Main Building Expansion | $ 256,250.00 |
| London | Improvements to City Hall | $ 1,566,667.00 |
| London | Innovation Industrial Park - Phase 3 | $ 4,533,333.00 |
| London | Kiwanis Park - Improve Park Amenities | $ 683,333.00 |
| London | Library Building Rehabilitation | $ 133,333.00 |
| London | Medway Park - Improve Park Amenities | $ 316,666.00 |
| London | Multi-Sport/Activity Indoor Centre | $ 1,325,263.00 |
| London | Oakridge Optimist Park - Improve Park Amenities | $ 387,000.00 |
| London | Old East London - Storm Sewer Installation and Sanitary Sewer Replacement | $ 666,666.00 |
| London | Old South Combined Sewer Overflow | $ 1,333,333.00 |
| London | Old South Storm Sewer and Sanitary Sewer | $ 1,066,666.00 |
| London | Oxford - New Operations Facility | $ 934,666.00 |
| London | Piccadilly Park - Improve Park Amenities | $ 116,667.00 |
| London | Quebec Street Overpass Rehabilitation | $ 666,667.00 |
| London | Renovations - The Cornerstone | $ 1,389,957.00 |
| London | Repairs to Sewer System - Old East London | $ 733,333.00 |
| London | Repairs to Sewer System - Old North/Downtown | $ 866,667.00 |
| London | Repairs to Sewer System - Old South London | $ 666,667.00 |
| London | Repairs to Sewer System - South London | $ 400,000.00 |
| London | A. J. Tyler Operations Centre Building Improvements | $ 397,000.00 |
| London | A.J. Tyler Operations Centre - Building Improvements | $ 239,666.00 |
| London | Additional Development of Operations Facility | $ 40,000.00 |
| London | Adelaide Operations Centre Building Expansion | $ 150,000.00 |
| London | Argyle Arena Lighting Upgrade | $ 33,333.00 |
| London | Basil Grover Park - Improve Park Amenities | $ 146,666.00 |
| London | Bathurst Street Sanitary Sewer Replacement | $ 466,666.00 |
| London | Boyle Community Centre - Facility Renovations | $ 400,000.00 |
| London | Byron Community Centre - Facility Renovations | $ 432,000.00 |
| London | Carling Heights - Building Restoration | $ 433,333.00 |
| London | Carling Heights - Facility Expansion | $ 120,000.00 |
| London | City Hall Building Improvements | $ 200,000.00 |
| London | Dundas Street Gateway | $ 1,000,000.00 |
| London | Ed Blake Park - New Park Features | $ 391,666.00 |
| London | Expansion of Ronald McDonald House of Southwestern Ontario | $ 2,600,000.00 |
| London | Fire Hall No. 10 - Building Improvements | $ 225,000.00 |
| London | Fire Hall No. 9 - Building Improvements | $ 183,333.00 |
| London | Goodwill Social Enterprise Abilities Centre | $ 3,898,151.00 |
| London | Hale and Trafalgar Street Overpass - London | $ 3,816,338.00 |
| London | Highbury Bridge Rehabilitation | $ 526,666.00 |
| London | HELP Clean Water (Huron Elgin London Project) | $ 49,985,307.00 |
| Longford Mills | Rehabilitation of Airport Road | $ 238,536.77 |
| Loring | Improvements to Birchwood Trail | $ 18,900.00 |
| Loyalist | Amherst Island Culvert Replacement Project | $ 111,000.00 |
| Lucan | Lucan Community Memorial Centre Upgrades | $ 66,666.00 |
| Lucan | Renewal - Lucan Scout and Guide Hall | $ 21,667.00 |
| Lucan | Asphalting of Museum Walkways and Parking Area | $ 5,000.00 |
| Lucan | Facility Rehabilitation | $ 156,666.00 |
| Lucan | George Street Watermain Replacement | $ 190,755.00 |
| Lucan | Renewal of the Lucan waste water treatment plant | $ 657,474.29 |
| Lucan Biddulph | Saintsbury Line Reconstruction | $ 319,416.00 |
| Lucknow | Lucknow and District Firehall | $ 375,000.00 |
| Lyndhurst | Leeds and the Thousand Islands - Lyndhurst Fire Hall and Combined Training Facility | $ 666,666.00 |
| Lyndhurst | Construction of Storm Water Management Facilities in Lyndhurst | $ 775,556.00 |
| Macdonald | Sportsplex Upgrades | $ 41,625.00 |
| Macdonald | Milligan Gazebo | $ 19,498.00 |
| Macdonald | Municipal Office Addition | $ 33,054.00 |
| Machar | Eagle Lake Narrows Bridge | $ 181,125.00 |
| Machar | Reconstruction of Boundary Road | $ 85,791.65 |
| Madoc | Accessibility Upgrade | $ 7,000.00 |
| Madoc | Rehabilitation of Barry Cooper Road in Madoc | $ 543,685.68 |
| Madoc | Rehabilitation of Moira Street | $ 746,063.00 |
| Magnetawan | New Municipal Complex | $ 667,000.00 |
| Magnetawan | Rehabilitiation of Ahmick Lake Road | $ 210,000.00 |
| Magnetawan | Reconstruction of South Sparks Street | $ 283,333.00 |
| Malahide | Firehall/Multi-Use Building | $ 566,666.00 |
| Mallorytown | Rehabilitation of County Road #2 from Mallorytown to Long Beach | $ 829,948.04 |
| Manitouwadge | Improvements to the Manitouwadge Airport | $ 100,000.00 |
| Manitouwadge | Manitouwadge waste water lagoon project | $ 83,333.00 |
| Manitowaning | Diversion of Assiginack landfill waste and capacity retention | $ 173,633.00 |
| Manitowaning/Assiginack | Manitowaning Arena Community Centre Facelift | $ 342,000.00 |
| Mapleton | Upgrading Drayton Wastewater Treatment Plant | $ 558,466.00 |
| Marathon | Provide Potable Water to the Visitors Information Centre | $ 18,000.00 |
| Marathon | Development of a Regional Waste Management System | $ 2,495,360.00 |
| Markdale | Replacement of Markdale Sewage Pumping Stations | $ 456,625.00 |
| Markham | Warden Avenue Resurfacing | $ 658,333.00 |
| Markham | Facility Accessibility, Energy Retrofit and Emergency Operations Centre Rehabilitation | $ 2,400,000.00 |
| Markham, Vaughan, Richmond Hill, Newmarket | Rehabilitation of concrete bus stops | $ 966,666.00 |
| Markstay | Chiniguchi River road re-surfacing project | $ 112,318.92 |
| Marmora | Marmora and Lake Supervisory Control and Data Acquisition Upgrades | $ 150,000.00 |
| Marmora | Rehabilitation of Centre Line Road | $ 98,333.00 |
| Marmora and Lake | Replacement of the Station Bridge | $ 268,283.30 |
| Massey | Public Works Building Renovation and Addition | $ 131,000.00 |
| Massey | Hugh Cummings Street Watermain | $ 85,000.00 |
| Massey | Realignment and reconstruction of Birch Lake Road | $ 237,076.69 |
| Matachewan | Municipal Building Improvements | $ 36,304.00 |
| Matachewan | Upgrades to the Water Distribution System | $ 677,766.00 |
| Mattawa | Samuel de Champlain Museum and Information Centre | $ 150,000.00 |
| Mattawa | Highway 17 sewer and water replacement | $ 1,800,000.00 |
| Mattice | Rehabilitation and Upgrade of Two Major Municipal Buildings | $ 44,000.00 |
| Mattice | Community Parks Enhancements | $ 16,666.00 |
| Maynooth | Hastings Highlands Recreational/Cultural Facility | $ 1,522,666.00 |
| Maynooth | Construction of salt/sand structure | $ 410,333.67 |
| Maynooth | Reconstruction of Musclow Greenview Road | $ 1,000,000.00 |
| McDougall | Reconstruction of Oakridge Road | $ 113,098.00 |
| McKellar | Middle River Bridge Replacement | $ 766,666.00 |
| McKellar | Improvements to the community centre | $ 383,500.00 |
| McKerrow | Construction of the Baldwin Recreation Building | $ 82,311.11 |
| McNab/Braeside | Rehabilitation of Poole Street | $ 183,945.21 |
| Meaford | 3rd Line Rehabilitation | $ 63,667.00 |
| Meaford | Boucher and Victoria Watermain | $ 67,667.00 |
| Meaford | Construction of the St. Vincent Street water booster station | $ 562,000.00 |
| Meaford | Replacement of the Harris Bridge | $ 338,450.27 |
| Meldrum Bay | Construction of a waterfront exhibit centre for Meldrum Bay | $ 177,847.00 |
| Merrickville-Wolford | Snowdons Corners Road Construction | $ 139,333.00 |
| Merrickville-Wolford | Main Street Watermain Replacement | $ 319,333.00 |
| Merrickville-Wolford | Collar Hill Road Construction | $ 91,667.00 |
| Merrickville-Wolford | Replacement of the Village of Merrickville-Wolford sewage treatment plant | $ 2,440,000.00 |
| Metcalfe | Integrated Road, Water and Sewer - 8th Line Road/Lloyd Graham Avenue | $ 833,333.00 |
| Middlesex Centre | Denfield Operations Centre | $ 2,000,000.00 |
| Midhurst | Archives Expansion | $ 1,377,833.00 |
| Midland | Municipal Office Expansion/Retrofit | $ 1,333,333.00 |
| Midland | Construction of the Midland Soccer Field | $ 250,000.00 |
| Miller Lake | Cabot Head Provincial Nature Reserve Improvements | $ 12,500.00 |
| Milton | Tremaine Road Widening | $ 5,333,333.00 |
| Milton | Milton Sports Centre - Expansion Phase 1 | $ 6,678,425.00 |
| Milton | Community Living North Halton | $ 400,000.00 |
| Milton | Construction of arts and cultural centre | $ 8,112,107.09 |
| Milverton | Replacement of sanitary sewers | $ 424,461.00 |
| Mindemoya | Improvements to the Mindemoya Arena | $ 95,975.00 |
| Minden | Riverview Walk | $ 521,820.00 |
| Minden | Construction of the Minden Elevated Storage Tank | $ 802,083.00 |
| Minden | Reconstruction of County Road 21 and rehabilitation of Allsaw Bridge | $ 876,666.00 |
| Mine Centre | Resurfacing of Mine Centre Road | $ 27,738.00 |
| Minesing | Development of a park in Minesing | $ 500,000.00 |
| Minto | Rehabilitation of the Palmerston Lions park brownfield | $ 316,667.00 |
| Mississauga | Reservoir Rehabilitation Project - Silverthorn Reservoir | $ 500,000.00 |
| Mississauga | Resurfacing - Cawthra Road from Lakeshore Road to North Service Road | $ 332,349.00 |
| Mississauga | Resurfacing - Dixie Road from Highway 401 to Derry Road | $ 2,053,236.00 |
| Mississauga | Road Rehabilitation - Eglinton Avenue West | $ 715,000.00 |
| Mississauga | Robert Speck Parkway Noise Attenuation Barrier Replacement | $ 64,166.00 |
| Mississauga | Serson Park | $ 80,000.00 |
| Mississauga | Silverthorn pumping station improvements and upgrades | $ 1,090,334.00 |
| Mississauga | Stormwater Management Facility No. 3601 - Dredging and Rehabilitation | $ 166,666.00 |
| Mississauga | Tomken Road Noise Attenuation Barrier Replacement | $ 154,000.00 |
| Mississauga | Turner Valley Road - Road Rehabilitation | $ 91,000.00 |
| Mississauga | Winston Churchill Boulevard - Road Rehabilitation | $ 1,657,060.00 |
| Mississauga | Winston Churchill Boulevard - Road Rehabilitation | $ 638,202.00 |
| Mississauga | Interior Reservoir Coatings - Hanlan South Reservoir Cell | $ 733,333.00 |
| Mississauga | Interior Reservoir Coatings - Meadowvale Cells 1 and 2 | $ 366,666.00 |
| Mississauga | Kennedy Road - New Sidewalk Construction | $ 10,313.00 |
| Mississauga | Lakeshore Road West - Road Rehabilitation | $ 973,917.00 |
| Mississauga | Lakeview Branch Library Redevelopment | $ 833,333.00 |
| Mississauga | Lorne Park Branch Library Redevelopment | $ 1,333,333.00 |
| Mississauga | Maingate Drive - Road Rehabilitation | $ 238,334.00 |
| Mississauga | Malton Community Centre and Library Expansion | $ 3,333,333.00 |
| Mississauga | Malton Paramedic Satellite Station | $ 266,666.00 |
| Mississauga | Meadowvale North Pumping Station Expansion | $ 2,489,000.00 |
| Mississauga | Meyerside Drive - New Sidewalk Construction | $ 83,850.00 |
| Mississauga | Mid-way Boulevard - New Sidewalk Construction | $ 22,966.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Burnhamthorpe Road East | $ 102,933.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Burnhamthorpe Road East | $ 12,266.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Burnhamthorpe Road East | $ 22,933.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Burnhamthorpe Road East | $ 72,266.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Burnhamthorpe Road East | $ 26,933.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Burnhamthorpe Road East | $ 92,266.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Burnhamthorpe Road East | $ 9,866.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Burnhamthorpe Road West | $ 56,466.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Confederation Parkway | $ 58,666.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Eglinton Avenue | $ 15,466.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Eglinton Avenue | $ 59,200.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Mavis Road | $ 45,333.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Mavis Road | $ 176,000.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Rathburn Road East | $ 39,200.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Rathburn Road West | $ 86,400.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Rathburn Road West | $ 69,333.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Rathburn Road West | $ 133,333.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Rathburn Road West | $ 113,333.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Rathburn Road West | $ 40,000.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Rathburn Road West | $ 66,400.00 |
| Mississauga | Noise Attenuation Barrier Replacement - Tomken Road | $ 88,000.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Arbour Green | $ 38,300.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Beechwood Park | $ 21,433.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Ben Machree Park | $ 18,033.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Bloor Athletic Field | $ 38,300.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Bonnie Brea | $ 14,666.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Brandon Gate Park | $ 34,933.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Brentwood Park | $ 45,066.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Brookmede Park | $ 51,833.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Burnhamthorpe Library Grounds | $ 31,566.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Derry Greenway | $ 24,800.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Douglas Kennedy Park | $ 107,000.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Eden Woods | $ 76,600.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Edengrove Park | $ 73,233.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Elmcreek Park | $ 31,466.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Fred Halliday Memorial Park | $ 22,900.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Glen Eden Park | $ 96,866.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Glendenning Park | $ 11,266.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Golden Orchard Park | $ 29,333.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Gordon Lummiss Park | $ 27,200.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Hawkins Glen | $ 24,800.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Hiawatha Park | $ 21,400.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Huron Park | $ 187,233.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - J.C. Saddington Park | $ 80,000.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - J.J. Plause Park | $ 200,500.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Kennedy Park | $ 24,800.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Kindree Gate | $ 18,033.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Kings Masting Park | $ 100,800.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Kogaydiwin Trail | $ 83,366.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Lake Aquitaine | $ 214,000.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Lake Aquitaine Trail | $ 113,766.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Lake Wabukayne | $ 135,166.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - McCauley Green | $ 41,700.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - McKenzie Park | $ 28,166.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Meadow Green | $ 62,900.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Meadowvale Sports Park | $ 28,166.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Millgrove Park | $ 34,933.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Millgrove Trail | $ 321,000.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Northwood Park | $ 83,366.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Pinecliff Park | $ 14,333.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Plowmans Park | $ 29,333.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Prinetree Grove Park | $ 11,300.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Promenade Meadows | $ 41,700.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Rathwood District Park | $ 96,866.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Rayfield Park | $ 38,300.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Richard F.C. Mortenson Park | $ 31,566.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Richards Memorial Park | $ 18,033.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Sandgate Park | $ 11,300.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Sawmill Valley Trail | $ 275,966.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Settlers Green | $ 55,200.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Shalebank Hollow | $ 28,166.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Shaver Trail | $ 90,133.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Shelby Park | $ 48,433.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Sheridan Creek Trail | $ 128,433.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Springbank Meadows | $ 34,933.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Springfield Park | $ 28,166.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Spruce Park | $ 31,466.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Stillmeadows Park | $ 21,433.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Stonebrook Park | $ 51,833.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Taffey Park | $ 18,033.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Thornlodge Park | $ 117,133.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Trappers Green | $ 141,933.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Turney Woods | $ 48,433.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Wakefield Common Park | $ 24,800.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Wildwood Park | $ 86,733.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Windwood Park | $ 96,866.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Windy Hollow | $ 86,733.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Woodeden Park | $ 48,433.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Woodgreen Park | $ 38,300.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Woodhurst Heights | $ 117,133.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Woodington Green | $ 135,166.00 |
| Mississauga | Pathway Paving and Lighting Rehabilitation - Woodland Chase Park | $ 51,833.00 |
| Mississauga | Port Credit Branch Library Redevelopment | $ 833,333.00 |
| Mississauga | Port Credit Trunk Sewer and Forcemain | $ 2,666,667.00 |
| Mississauga | Rathburn Road East Noise Attenuation Barrier Replacement | $ 51,333.00 |
| Mississauga | Rathburn Road East Noise Attenuation Barrier Replacement | $ 64,166.00 |
| Mississauga | Rathburn Road East Noise Attenuation Barrier Replacement | $ 30,800.00 |
| Mississauga | Redevelopment of the Burnhamthorpe Branch Library | $ 5,533,333.00 |
| Mississauga | Replacement of Old Watermains in the City of Mississauga | $ 12,262,016.00 |
| Mississauga | Admiral Boulevard - Road Rehabilitation | $ 364,422.00 |
| Mississauga | Aerowood Drive - Road Rehabilitation | $ 156,000.00 |
| Mississauga | Argentia Road - Road Rehabilitation | $ 583,984.00 |
| Mississauga | Bonhill Road - New Sidewalk Construction | $ 34,883.00 |
| Mississauga | Britannia Road East - New Sidewalk Construction | $ 17,680.00 |
| Mississauga | Britannia Road East - Road Rehabilitation | $ 424,125.00 |
| Mississauga | Britannia Road West - New Sidewalk Construction | $ 38,653.00 |
| Mississauga | Britannia Road West - New Sidewalk Construction | $ 11,396.00 |
| Mississauga | Brunel Road - New Sidewalk Construction | $ 47,710.00 |
| Mississauga | Burnamthorpe Road - Road Rehabilitation | $ 273,000.00 |
| Mississauga | Burnhamthorpe Road West Noise Attenuation Barrier Replacement | $ 118,066.00 |
| Mississauga | Cardiff Boulevard - New Sidewalk Construction | $ 80,600.00 |
| Mississauga | City Centre Transit Priority - Mavis | $ 443,333.00 |
| Mississauga | City Centre Transit Priority - Rathburn | $ 1,390,000.00 |
| Mississauga | Civic Centre: Underground Parking Garage Repairs and Public Square Rehabilitation | $ 13,333,333.00 |
| Mississauga | Columbus Road - New Sidewalk Construction | $ 46,843.00 |
| Mississauga | Creditview Road - Road Rehabilitation | $ 487,500.00 |
| Mississauga | Derry Road East - New Sidewalk Construction | $ 339,256.00 |
| Mississauga | Derry Road West - New Sidewalk Construction | $ 59,193.00 |
| Mississauga | Dixie Road - New Sidewalk Construction | $ 37,093.00 |
| Mississauga | Dundas Street West Noise Attenuation Barrier Replacement | $ 82,133.00 |
| Mississauga | Eglinton Avenue West - Road Rehabilitation | $ 452,000.00 |
| Mississauga | Eglinton Avenue West Noise Attenuation Barrier Replacement | $ 8,983.00 |
| Mississauga | Eglinton Avenue West Noise Attenuation Barrier Replacement | $ 10,780.00 |
| Mississauga | Eglinton Avenue West Noise Attenuation Barrier Replacement | $ 8,983.00 |
| Mississauga | Eglinton Avenue West Noise Attenuation Barrier Replacement | $ 8,983.00 |
| Mississauga | Eglinton Avenue West Noise Attenuation Barrier Replacement | $ 10,780.00 |
| Mississauga | Eglinton Avenue West Noise Attenuation Barrier Replacement | $ 10,780.00 |
| Mississauga | Expansion of the Clarkson Community Centre and Library | $ 3,333,333.00 |
| Mississauga | Freemont Boulevard - New Sidewalk Construction | $ 21,493.00 |
| Mississauga | Hadwen Road - New Sidewalk Construction | $ 21,060.00 |
| Mississauga | Haultain Court - Road Rehabilitation | $ 45,500.00 |
| Mississauga | Hershey Centre Redevelopment | $ 891,667.00 |
| Mississippi Mills | Spring Street Reconstruction, and Water and Sewer Main Replacement | $ 147,000.00 |
| Mississippi Mills | Reconstruction of 4 Kilometres of 8th Concession - Ramsay | $ 160,000.00 |
| Mississippi Mills | Renovations to Almonte Community Centre | $ 651,740.00 |
| Mitchell | Mitchell Emergency Management System Base | $ 310,000.00 |
| Mitchell | Reconstruction of Wellington Street North | $ 635,000.00 |
| Mono | Mono Cliffs Provincial Park construction | $ 9,000.00 |
| Mono | Blind Line Reconstruction (County Road 10 to County Road 16) | $ 507,667.00 |
| Mono | Replacement of Mono Bridge 26 | $ 162,608.87 |
| Montague | Preservation of Rideau River Road | $ 85,333.00 |
| Montague | Rehabilitation of McCrea Road | $ 58,333.00 |
| Moonbeam | Library Accessibility | $ 130,000.00 |
| Moonbeam | Fire Hall Expansion | $ 145,833.00 |
| Moonbeam | Upgrade of Walker Road | $ 218,907.00 |
| Moose Factory Island | Hudson's Bay Staff House Repairs | $ 60,000.00 |
| Moose Factory Island | Improvements to the Water Distribution System | $ 668,151.00 |
| Moosonee | Replacement of Butler Creek Bridge | $ 1,449,936.00 |
| Morpeth | Rondeau Park Picnic Shelter | $ 50,000.00 |
| Morpeth | Repairs to Rondeau Road | $ 350,000.00 |
| Morrisburg | St. Lawrence Parks Commission - Road and Bridge Repairs | $ 3,550,000.00 |
| Morson | Lakewood Drive Upgrade | $ 38,000.00 |
| Morson | Development of phase 2 of Waterfront Park | $ 60,000.00 |
| Mount Brydges | Mount Brydges Sanitary Sewer Servicing | $ 2,812,794.00 |
| Mount Brydges | Connection of the Mount Brydges and Area Water System to the Lake Huron System | $ 873,700.00 |
| Mount Forest | Upgrade of a sewage pumping station and a discharge forcemain in Mount Forest | $ 1,383,000.00 |
| Mount Forest | Upgrade of the Egremont Street water system and sanitary sewer | $ 1,041,667.00 |
| Mulmur | Rehabilitation of Mulmur Landfill Road | $ 602,850.00 |
| Muskoka | Highway 11 - Sedore Road Underpass rehabilitation | $ 500,000.00 |
| Muskoka Lakes | Camp Pine Crest | $ 1,400,000.00 |
| Napanee | Rehabilitation of Roblin Road | $ 327,894.00 |
| Napanee | Reconstruction of Bridge Street West | $ 632,665.00 |
| Neebing | Sand and Salt Storage Shed | $ 33,333.00 |
| Neebing | Pardee Road Resurfacing Project | $ 143,820.00 |
| Neebing | Construction of the Pine River bridge | $ 443,000.00 |
| Nestor Falls | Resurfacing Nestor Falls airstrip | $ 830,640.00 |
| Neustadt | Renovations to the Neustadt Arena | $ 66,667.00 |
| New Canaan | New Facility for Windsor-Essex Therapeutic Riding Association | $ 724,640.00 |
| New Hamburg | Rehabilitation of Shade Street Bridge | $ 247,500.00 |
| New Liskeard | Construction of a biofuel pellet plant | $ 1,458,750.00 |
| New Tecumseth | Restoration of the Monument Building | $ 65,933.60 |
| Newbury | Newbury Municipal Office Expansion and Renovation | $ 98,000.00 |
| Newmarket | Water and Wastewater - Instrumentation and Control Replacement | $ 366,666.00 |
| Newmarket | Parkview Crescent Road Reconstruction | $ 319,000.00 |
| Newmarket | Davis Drive Resurfacing | $ 766,667.00 |
| Newmarket | Cultural revitalization of historic downtown | $ 2,035,000.00 |
| Newmarket | Retrofitting the Old Town Hall into a Creative Centre | $ 1,698,621.00 |
| Niagara (Port Colborne) | Highway 140 - Highway 3 to Niagara Road 23 in Port Colborne | $ 3,000,000.00 |
| Niagara Falls | Niagara Falls Downtown Infrastructure Revitalization | $ 889,033.00 |
| Niagara Falls | Niagara Falls Platform Project | $ 700,000.00 |
| Niagara Falls | Niagara Parks Commission - War of 1812 | $ 4,470,000.00 |
| Niagara Falls | Regional Road 101 (Mountain Road) Reconstruction and storm drainage project | $ 1,166,000.00 |
| Niagara Falls | Boys and Girls Club Niagara Falls Centre | $ 4,000,000.00 |
| Niagara Falls | Children's Aid Society - Phase 2 | $ 836,667.00 |
| Niagara Falls | Combined Sewer Overflow High Rate Treatment - Niagara Falls Wastewater Treatment Plant | $ 5,000,000.00 |
| Niagara Falls | Drummond Road Reconstruction | $ 2,100,000.00 |
| Niagara Falls | Expansion of the Lundy's Lane Historical Museum | $ 3,237,666.00 |
| Niagara-on-the-Lake | Multi-Purpose trail | $ 50,000.00 |
| Niagara-on-the-Lake | Niagara District Airport Infrastructure Improvements | $ 3,869,334.00 |
| Niagara-on-the-Lake | Construction of a community centre | $ 2,031,000.00 |
| Niagara-on-the-Lake | Niagara-on-the-Lake Wastewater Treatment Project | $ 14,426,667.00 |
| Nipigon | Upgrades to Wastewater Treatment in Nipigon | $ 3,450,000.00 |
| Nipigon | Highway 17 - Cypress and Little Gravel River bridges rehabilitation | * |
| Nipissing | Nipissing Fire Station #1 Addition | $ 70,000.00 |
| Nipissing | Nipissing Public Works Garage - Energy Retrofitting | $ 26,666.00 |
| Nipissing | Rehabilitation of Ski Hill and Mountainview Roads in Nipissing | $ 28,526.83 |
| Nipissing | Rehabilitation of Wolfe Lake Road | $ 57,004.02 |
| Nobel | Killbear Picnic Shelter | $ 50,000.00 |
| Nobel | Killbear Road Rehabilitation | $ 350,000.00 |
| Nobel | East and West Carling Bay Road/Bayview Drive improvements | $ 776,585.00 |
| Nobel | Replacement of McDougall Recreation Facility | $ 439,200.00 |
| Norfolk | County Road 42 Road Rehibiliation | $ 2,760,000.00 |
| Norfolk County | Water meter replacement program | $ 1,540,000.00 |
| North Algona Wilberforce | Smiths Bay Road Resurfacing | $ 60,000.00 |
| North Algona Wilberforce | B-Line Road Resurfacing Project | $ 115,000.00 |
| North Algona Wilberforce | Golden Lake Municipal Building Rehabilitation | $ 18,000.00 |
| North Bay | YES! Employment Expansion and Renovations | $ 1,000,000.00 |
| North Bay | Algonquin/Front Rehabiliation Program | $ 4,666,666.00 |
| North Bay | District of Nipissing Social Services Administration Board Accommodation | $ 900,465.00 |
| North Bay | Construction of a multi-use outdoor sports complex | $ 3,000,000.00 |
| North Bay | Installation of North Bay water meters | $ 2,320,483.00 |
| North Dumfries | Regional Road 97 (Cedar Creek Road) from Edworthy Side Road to Waterloo/Oxford Boundary | $ 1,150,000.00 |
| North Dumfries | Development of multi-use recreation facility | $ 4,391,333.00 |
| North Dundas | Winchester Water Transmission Main Project | $ 278,333.00 |
| North Dundas | Reconstruction of Belmeade Road | $ 833,133.00 |
| North Dundas | Reconstruction of Boyne Road | $ 865,387.00 |
| North Frontenac | Rehabilitation of Ardoch Road | $ 250,000.00 |
| North Glengarry | Construction of Glengarry Indoor Sports Complex | $ 400,000.00 |
| North Huron (Blyth) | Blyth Campground Event Venue with Washrooms, Showers and Laundry | $ 45,675.00 |
| North Kawartha | North Kawartha Library and Community Police Building | $ 293,333.00 |
| North Kawartha | Public Works Garage | $ 316,666.00 |
| North Kawartha | Fire Station 1 Addition | $ 133,333.00 |
| North Kawartha | Reconstruction of Anstruther Lake Road in Apsley | $ 1,133,215.00 |
| North Middlesex | County Road 81 (Grand Bend Road) Rehabilitation | $ 476,096.00 |
| North Perth | Reconstruction of the Hilpert Bridge | $ 182,117.00 |
| North Shore | Renovations to Municipal Building and New Fire Station | $ 72,000.00 |
| North Stormont | Finch-Roxborough Boundary Road Reconstruction | $ 377,233.00 |
| Northeastern Manitoulin and the Islands | Upgrade Membrane Cassettes at Little Current Water Plant | $ 166,603.00 |
| Northeastern Manitoulin and the Islands | Indian Mountain Road Upgrade | $ 74,583.00 |
| Northern Bruce Peninsula | Municipal Building for Tourism and Public Washroom Facility | $ 133,333.00 |
| Northern Bruce Peninsula | Bike Lanes on Bruce Road | $ 700,000.00 |
| Northern Bruce Peninsula/Town of South Bruce Peninsula | Highway 6 - Tobermory Towards Mar | $ 10,000,000.00 |
| Northumberland | Upgrades to alternate detour route for Highway 401 | $ 2,009,680.00 |
| Norwich | County Road 13 Rehabilitation | $ 304,443.00 |
| Norwich | County Road 55 Rehabilitation | $ 463,283.00 |
| Norwich | Fire and Emergency Operations Centre Station #1 | $ 366,666.00 |
| Norwood | Public Works Facility | $ 576,667.00 |
| O'Connor | O'Connor Municipal Building and Council Chambers | $ 107,800.00 |
| O'Connor | Bridge No. 1 Rehabilitation | $ 16,200.00 |
| Oakville | Oakville Southwest (Phase 3) Wastewater Treatment Plant | $ 16,733,333.00 |
| Oakville | Renewal and expansion of the Oakville Transit Facility | $ 15,000,000.00 |
| Oakville | Bronte Creek Park Facility Improvements | $ 150,000.00 |
| Odessa | Reconstruction of Factory Street in Odessa | $ 221,375.00 |
| Oil Springs | Waterline replacement project | $ 278,040.00 |
| Oil Springs | Improvements to the Oil Springs Water System | $ 129,788.81 |
| Oliver Paipoonge | Rosslyn Library Addition | $ 100,000.00 |
| Oliver Paipoonge | Kakabeka Fire Station | $ 104,000.00 |
| Oliver Paipoonge | Improvements to Twin-City Crossroads and Arthur Street West | $ 777,718.58 |
| Orangeville | William Street - Watermain and Sanitary Sewer Replacement | $ 600,000.00 |
| Orangeville | Dufferin County Administration and Provincial Offences Court Addition | $ 2,700,000.00 |
| Orangeville | Reconstruction of Roads and Services in the South Park Subdivision | $ 1,650,000.00 |
| Orangeville | Renovations to the Tony Rose Memorial Sports Centre | $ 500,000.00 |
| Orillia | Orillia Common Roof | $ 1,270,620.00 |
| Orillia | Rehabilitation of Albany Avenue | $ 666,666.00 |
| Orillia | Construction of a public library and market square | $ 2,000,000.00 |
| Orleans | Setting Up of Orléans-Cumberland Community Resource Centre | $ 250,000.00 |
| Oro-Medonte | Improvements to County Road 19 | $ 1,603,333.00 |
| Oro-Medonte | Lake Simcoe Regional Airport Upgrades and Expansion | $ 4,596,000.00 |
| Oro-Medonte | Highway 11 Resurfacing | $ 8,000,000.00 |
| Orrville - Parry Sound area | Highway 518 - East of Highway 400 towards Orrville | $ 2,050,000.00 |
| Osgoode | Prescott Subdivision - Pedestrian and Cyclist Rural Pathway | $ 466,667.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Connery Crescent | $ 133,333.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Eastlawn Street | $ 41,667.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Elite Court | $ 34,720.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Ellesmere Court | $ 25,000.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Fleming Court | $ 23,333.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Homestead Court | $ 60,000.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Lichen Crescent | $ 68,200.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Nevada Court | $ 10,000.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Noel Court | $ 20,000.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Overbank Drive | $ 169,880.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Renaissance Drive | $ 73,333.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Roundelay Court | $ 93,334.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Sagebush Street | $ 54,560.00 |
| Oshawa | Road Rehabilitation - Regional Road 60 | $ 183,333.00 |
| Oshawa | Oshawa Civic Complex Renewal and Expansion | $ 6,368,333.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Adele Crescent | $ 52,080.00 |
| Oshawa | Replacement of Polybutylene Service Connections - Castlegrove Avenue | $ 28,520.00 |
| Oshawa | City Hall Floor 2 Renovations | $ 48,333.00 |
| Oshawa | Facility Booking Office Renovation Project | $ 66,667.00 |
| Oshawa | Highway 401 - Farewell Creek bridge Rehabilitation | $ 250,000.00 |
| Ottawa | Resurfacing - Transit Roads and Park & Ride Areas | $ 18,333.00 |
| Ottawa | Resurfacing Transit Roads and Park & Ride Areas - St. Laurent to Blair | $ 190,000.00 |
| Ottawa | Resurfacing Transit Roads and Park and Ride Areas | $ 240,000.00 |
| Ottawa | Rural Road Operational Improvements | $ 110,333.00 |
| Ottawa | Rural Road Operational Improvements | $ 43,333.00 |
| Ottawa | Rural Road Operational Improvements | $ 68,333.00 |
| Ottawa | Rural Road Operational Improvements | $ 122,000.00 |
| Ottawa | Rural Road Operational Improvements | $ 51,333.00 |
| Ottawa | Rural Road Operational Improvements | $ 28,333.00 |
| Ottawa | Rural Road Operational Improvements | $ 137,333.00 |
| Ottawa | Rural Road Upgrades | $ 123,333.00 |
| Ottawa | Rural Road Upgrades | $ 95,333.00 |
| Ottawa | Rural Road Upgrades | $ 66,000.00 |
| Ottawa | Rural Road Upgrades | $ 27,000.00 |
| Ottawa | Rural Road Upgrades | $ 56,667.00 |
| Ottawa | Rural Road Upgrades | $ 40,000.00 |
| Ottawa | Rural Road Upgrades | $ 140,000.00 |
| Ottawa | Rural Road Upgrades | $ 61,333.00 |
| Ottawa | Rural Road Upgrades | $ 67,667.00 |
| Ottawa | Rural Road Upgrades | $ 96,333.00 |
| Ottawa | Rural Road Upgrades | $ 28,667.00 |
| Ottawa | Rural Road Upgrades | $ 100,000.00 |
| Ottawa | Rural Road Upgrades | $ 66,667.00 |
| Ottawa | Rural Road Upgrades | $ 218,000.00 |
| Ottawa | Rural Road Upgrades | $ 80,000.00 |
| Ottawa | Sidewalk and Curb Rehabilitation | $ 172,667.00 |
| Ottawa | Sidewalks - Data Centre Road West | $ 120,000.00 |
| Ottawa | Smith Road Upgrades | $ 73,667.00 |
| Ottawa | Southwest Transitway Extension - Fallowfield to Barrhaven | $ 16,248,333.00 |
| Ottawa | Tenth Line Road Upgrades | $ 42,000.00 |
| Ottawa | Terry Fox Drive - Flamborough Road to Kanata Avenue | $ 15,900,000.00 |
| Ottawa | The Boys and Girls Club of Ottawa - Britannia Clubhouse Renewal | $ 410,000.00 |
| Ottawa | The Good Companions Centre - Renovation | $ 257,000.00 |
| Ottawa | Third Line Road South upgrades | $ 133,333.00 |
| Ottawa | Transitway Improvement Program - Blair Station | $ 33,333.00 |
| Ottawa | Transitway Improvement Program - Core Area | $ 555,333.00 |
| Ottawa | Transitway Improvement Program - Hurdman Station | $ 25,000.00 |
| Ottawa | Transitway Improvement Program - Lighting Program | $ 25,000.00 |
| Ottawa | Transitway Improvement Program - St-Laurent Station | $ 58,333.00 |
| Ottawa | Transitway Improvement Program - St-Laurent Supervisor's Office | $ 7,500.00 |
| Ottawa | Transitway Renewal - Blair Road Ramp | $ 333,333.00 |
| Ottawa | Transitway Renewal - Nicholas Street Ramp | $ 433,333.00 |
| Ottawa | Transitway Renewal - Sackville Road Pedestrian Bridge | $ 66,667.00 |
| Ottawa | Transitway Wall Preservation | $ 333,333.00 |
| Ottawa | Urban Multi-Use Pathways for Pedestrians - Woodroffe Pathway Extension | $ 33,333.00 |
| Ottawa | Wabano Cultural and Community Centre | $ 2,333,333.00 |
| Ottawa | Wellspring Ottawa: Cancer Survivorship Centre | $ 850,000.00 |
| Ottawa | Improvements to Mer Bleue Road | $ 1,471,667.00 |
| Ottawa | Improvements to Patro d'Ottawa Building | $ 405,667.00 |
| Ottawa | Installation of a Lining in the Collector Sewer | $ 1,266,666.00 |
| Ottawa | Installation of Bicycle Shelters and Racks | $ 166,666.00 |
| Ottawa | Installation of Concrete Sheds | $ 266,666.00 |
| Ottawa | Installation of New Bus Shelters | $ 146,666.00 |
| Ottawa | Integrated Road, Water and Sewer - Argyle Avenue, Park Avenue, Queen Elizabeth Way | $ 1,500,000.00 |
| Ottawa | Integrated Road, Water and Sewer - Cambridge Street/Jackson Avenue/Frederick Place | $ 833,333.00 |
| Ottawa | Integrated Road, Water and Sewer - Churchill Avenue | $ 2,500,000.00 |
| Ottawa | Integrated Road, Water and Sewer - Indian Road | $ 1,666,667.00 |
| Ottawa | Integrated Road, Water and Sewer - Pinewood Crescent | $ 1,000,000.00 |
| Ottawa | Integrated Road, Water and Sewer - Pleasant Park Road | $ 1,500,000.00 |
| Ottawa | Integrated Road, Water and Sewer - Sandridge Road | $ 2,666,667.00 |
| Ottawa | Integrated Road, Water and Sewer - Stormont Street/Apeldoorn Avenue | $ 1,166,666.00 |
| Ottawa | Integrated Road, Water and Sewer - Sussex Drive | $ 2,000,000.00 |
| Ottawa | Integrated Road, Water and Sewer - Tremblay Road | $ 1,333,333.00 |
| Ottawa | Integrated Road, Water and Sewer - Triole Street | $ 1,000,000.00 |
| Ottawa | Integrated Road, Water and Sewer - Tweedsmuir Avenue | $ 2,000,000.00 |
| Ottawa | Investing in Better Futures for Youth - Youth Services Bureau | $ 266,667.00 |
| Ottawa | Kilbirnie Park Gazebo | $ 28,333.00 |
| Ottawa | New Change Room at the Dulude Arena | $ 33,333.00 |
| Ottawa | New Change Room at the Manotick Arena | $ 56,666.00 |
| Ottawa | New Change Room at the Tom Brown Arena | $ 56,666.00 |
| Ottawa | New Sidewalks - Belfast Road | $ 70,000.00 |
| Ottawa | New Sidewalks - Bronson | $ 80,000.00 |
| Ottawa | New Sidewalks - City Wide | $ 1,000,000.00 |
| Ottawa | New Sidewalks - Coventry | $ 50,000.00 |
| Ottawa | New Sidewalks - Eagleson Road | $ 78,667.00 |
| Ottawa | New Sidewalks - Hunt Club - Billy Bishop | $ 60,000.00 |
| Ottawa | New Sidewalks - Hunt Club - Bowesville | $ 156,667.00 |
| Ottawa | New Sidewalks - ShorelineTewsley Transit Link | $ 41,667.00 |
| Ottawa | New Sidewalks linking Canada Post to Public Transit | $ 48,333.00 |
| Ottawa | O-Train Corridor Upgrades | $ 300,000.00 |
| Ottawa | Ottawa Chinatown Gateway Project | $ 125,000.00 |
| Ottawa | Ottawa Humane Society | $ 3,600,000.00 |
| Ottawa | Ottawa Public Library - Alta Vista Branch Retrofit | $ 250,000.00 |
| Ottawa | Ottawa Public Library - Cumberland Branch Retrofit | $ 250,000.00 |
| Ottawa | Ottawa Public Library - Sunnyside Branch Renovation | $ 425,000.00 |
| Ottawa | Ottawa Public Library - Vanier Branch Retrofit | $ 250,000.00 |
| Ottawa | Pathway Rehabilitation on Jockvale Road | $ 100,000.00 |
| Ottawa | Pedestrian - Beautification of St-Joseph Boulevard | $ 833,333.00 |
| Ottawa | Pedestrian and Rural Pathways - Prescott Russell Pathway linkage | $ 666,667.00 |
| Ottawa | Pedestrian Overpass - Woodroffe Avenue to Baseline Transit Station | $ 1,666,667.00 |
| Ottawa | Pedestrian Urban Multi-Use Pathways | $ 116,667.00 |
| Ottawa | Pedestrian Urban Multi-Use Pathways - Alta Vista Transportation Corridor Pathway | $ 83,333.00 |
| Ottawa | Pedestrian Urban Multi-Use Pathways - Industrial Road | $ 8,333.00 |
| Ottawa | Pedestrian Urban Multi-Use Pathways - Ottawa River Capital Pathway #1 Improvements | $ 36,667.00 |
| Ottawa | Pedestrian Urban Multi-Use Pathways - Sawmill Creek Pathway Connections | $ 83,333.00 |
| Ottawa | Prince of Wales Drive Drainage Culvert | $ 66,667.00 |
| Ottawa | Reconstruction of the Main Entrance at the Vernon Library | $ 50,000.00 |
| Ottawa | Redesign of the Bob MacQuarrie Visual Arts Studio | $ 133,333.00 |
| Ottawa | Renovation of the Bruyère Centre for Immigrants | $ 375,000.00 |
| Ottawa | Renovation of the Hintonburg Community Centre | $ 16,666.00 |
| Ottawa | Renovation of the Ruth E. Dickinson Library | $ 183,333.00 |
| Ottawa | Accessibility Improvements at Three Facilities | $ 66,666.00 |
| Ottawa | Baseline Station Tunnel and College Avenue Overpass | $ 12,500,000.00 |
| Ottawa | Bellevue Manor Community Centre | $ 26,666.00 |
| Ottawa | Building Capacity Project - Diefenbunker | $ 106,000.00 |
| Ottawa | Centrepointe Theatre Expansion Project | $ 4,000,000.00 |
| Ottawa | Culvert Replacement on Stonecrest Road | $ 156,666.00 |
| Ottawa | Earl Armstrong Road | $ 11,500,000.00 |
| Ottawa | Elevator Upgrades at the Kanata Recreation Complex | $ 85,000.00 |
| Ottawa | Expansion and Renovation of the Western Ottawa Community Resource Centre | $ 1,200,000.00 |
| Ottawa | French Hill Rural Road Upgrades | $ 49,667.00 |
| Ottawa | Goulbourn Municipal Office Septic System Reconstruction | $ 23,333.00 |
| Ottawa | Hazeldean Road Widening | $ 21,666,666.00 |
| Ottawa | Highway 417 - Highway 7 to Interchange 163 | $ 4,050,000.00 |
| Ottawa | Hunt Club Road Extension to Highway 417 - Phase 1 | $ 6,666,667.00 |
| Ottawa | Ottawa Convention Centre | $ 50,000,000.00 |
| Ottawa | Ottawa Light Rail Transit** | $ 600,000,000.00 |
| Ottawa | Ottawa River Action Plan - Sewer Separation | $ 23,635,000.00 |
| Ottawa | Ottawa River Integrated Protection Plan | $ 9,365,000.00 |
| Ottawa | Strandherd - Armstrong Bridge | $ 15,986,229.00 |
| Ottawa | Update and expansion of La Nouvelle Scène Theatre | * |
| Owen Sound | Owen Sound Primary Sewage Upgrade | $ 14,955,000.00 |
| Owen Sound | Construction of the Owen Sound multi-purpose recreation facility at Victoria Park | $ 10,871,860.00 |
| Owen Sound | Replacement of the 9th Street Bridge | $ 664,035.00 |
| Paisley | Ross Street Watermain, Paisley | $ 263,750.00 |
| Papineau-Cameron | Construction of Sand Dome | $ 89,167.00 |
| Paris | Construction of a community centre | $ 7,124,894.00 |
| Parkhill | Renovation and expansion of the North Middlesex Arena | $ 1,667,780.00 |
| Parry Sound | Public Works Building | $ 81,333.00 |
| Parry Sound | Reconstruction of Cascade Street | $ 933,333.00 |
| Parry Sound | Esprit Place Family Centre - Entranceway Accessibility and Expansion | $ 82,482.00 |
| Parry Sound | Improvements to District Social Services Buildings | $ 759,602.00 |
| Parry Sound | Improvements to the Bobby Orr Community Centre | $ 1,049,850.00 |
| Parry Sound | Reconstruction of watermains under James, Gibson and Mary streets | $ 1,114,145.38 |
| Peace Tree | Rehabilitation of the Peace Tree sewage in Aweres | $ 67,012.87 |
| Pelee | Road rehabilitation - Township of Pelee | $ 969,392.00 |
| Pelham | Visitor Infrastructure Renewal at Niagara Escarpment Short Hills Park | $ 20,000.00 |
| Pelham | Fire Station #2 Replacement (Fenwick) | $ 990,000.00 |
| Pelham | Reconstruction of Haist Street | $ 1,839,633.00 |
| Pembroke | Winter Maintenance and Control Activities Facility | $ 500,000.00 |
| Pembroke | Reconstruction of Pembroke Street West | $ 854,304.94 |
| Pembroke | Reconstruction of the downtown connector in Pembroke | $ 1,031,062.00 |
| Penetanguishene | Improvements to Awenda Park Trail | $ 12,500.00 |
| Penetanguishene | Awenda Park Infrastructure Upgrade | $ 75,000.00 |
| Penetanguishene | Elevated Water Tower Resurfacing | $ 125,000.00 |
| Penetanguishene | Upgrades to the Philip H. Jones Pollution Control Plant | $ 6,510,703.00 |
| Perth | Wilson Street Corridor Rehabilitation | $ 3,033,333.00 |
| Perth | Ontario Heritage Trust - Inge-Va in Perth | $ 150,000.00 |
| Perth | Ontario Heritage Trust - McMartin House in Perth | $ 250,000.00 |
| Perth | Drummond Street West Corridor Rehabilitation | $ 130,000.00 |
| Perth | Highway 23 - Newry to Perth Line 84 | $ 350,000.00 |
| Perth | Improvement to Ebb's Bay Road in Drummond-North Elmsley Township | $ 432,653.21 |
| Perth | Renewal of the Last Duel Park | $ 93,167.00 |
| Perth East | Library Building Project | $ 400,000.00 |
| Perth East | Perth Road 135 Rehabilitation | $ 295,600.00 |
| Perth South | Rehabilitation of Line 26 | $ 316,050.00 |
| Perth South | Rehabilitation of Line 29 | $ 215,600.00 |
| Perth South | Rehabilitation of Line 6 | $ 210,000.00 |
| Perth South | Rehabilitation of bridge structure 67 (Road 134) | $ 73,111.76 |
| Perth South | Replacement of the Trout Creek bridge | $ 430,667.00 |
| Petawawa | Russell Street Rehabilitation | $ 516,063.00 |
| Petawawa | Gutzman Road rehabilitation | $ 82,355.26 |
| Petawawa | Reconstruction of Barron Canyon Road | $ 1,000,000.00 |
| Peterborough | Taylors Bridge Replacement | $ 233,333.00 |
| Peterborough | Market Hall Restoration Project | $ 2,795,335.00 |
| Peterborough | City Hall (Main Building) Heating, Ventilation and Air Conditionning Replacement | $ 266,666.00 |
| Peterborough | Highway 115 - Peterborough Road 10 to Highway 7A | $ 1,250,000.00 |
| Peterborough | Reconstruction of County Road 20 | $ 725,295.00 |
| Peterborough | Rehabilitation of Hunter Street bridge | $ 4,447,666.00 |
| Peterborough | Peterborough Commuter Rail Report | $ 150,000.00 |
| Petrolia | West Street Reconstruction | $ 274,667.00 |
| Petrolia | Queen/Nelson Street reconstruction | $ 713,333.00 |
| Pickering | Replacement of Polybutylene Service Connections - Cowan Crescent and Eastlawn Street | $ 57,866.00 |
| Pickering | Replacement of Polybutylene Service Connections - Foster Court | $ 15,333.00 |
| Pickering | Replacement of Polybutylene Service Connections - Frazer Road | $ 16,120.00 |
| Pickering | Replacement of Polybutylene Service Connections - Houston Court and Frazer Road | $ 10,907.00 |
| Pickering | Replacement of Polybutylene Service Connections - Labrador Drive | $ 59,520.00 |
| Pickering | Replacement of Polybutylene Service Connections - Maclaren Court | $ 17,360.00 |
| Pickering | Replacement of Polybutylene Service Connections - Mooreland Court and Frazer Road | $ 85,213.00 |
| Pickering | Replacement of Polybutylene Service Connections - Portland Court | $ 54,000.00 |
| Pickering | Replacement of Polybutylene Service Connections - Pridham Court | $ 12,400.00 |
| Pickering | Replacement of Polybutylene Service Connections - Rands Road | $ 64,480.00 |
| Pickering | Replacement of Polybutylene Service Connections - Rands Road | $ 52,080.00 |
| Pickering | Replacement of Polybutylene Service Connections - Rosebank Road and Labrador Drive | $ 19,840.00 |
| Pickering | Replacement of Polybutylene Service Connections - Sunningdale Avenue | $ 32,240.00 |
| Pickering | Replacement of Polybutylene Service Connections - Sunningdale Avenue and Cornwallis Court | $ 26,040.00 |
| Pickering | Road Rehabilitation - Regional Road 5 | $ 333,333.00 |
| Pickering | Rosebank Road Sanitary Sewerage Pumping Station | $ 1,833,333.00 |
| Pickering | Replacement of Polybutylene Service Connections - Abingdon Court | $ 55,000.00 |
| Pickering | Replacement of Polybutylene Service Connections - Anthony Court | $ 8,334.00 |
| Pickering | Replacement of Polybutylene Service Connections - Bashford Road | $ 45,880.00 |
| Pickering | Frenchman’s Bay Harbour Entrance Rehabilitation | * |
| Pickering | Downtown Pickering Pedestrian Bridge and Public Transit Hub | $ 5,000,000.00 |
| Pickering | Reconstruction of Toy Avenue in Pickering | $ 350,000.00 |
| Pickering | Duffin Creek Water Pollution Control Centre | $ 46,666,667.00 |
| Picton | Sandbanks Provincial Park Picnic Shelter | $ 50,000.00 |
| Picton | Sandbanks Road Repairs | $ 350,000.00 |
| Picton | New Trail in Sandbanks Park | $ 62,500.00 |
| Pinewood | Pinewood Fire Hall Addition | $ 47,000.00 |
| Plummer Additional | Bruce Station Hall Rehabilitation | $ 11,500.00 |
| Plummer Additional | Copper Bay Road Resurfacing | $ 29,000.00 |
| Plummer Additional | Rehabilition of Old Soo Road in Plummer Additional | $ 198,000.00 |
| Plympton-Wyoming | Improvements to the Queen Street force main | $ 305,000.00 |
| Point Clark | Point Clark Area North West: replacement of watermains, storm sewers and road reconstruction | $ 336,348.00 |
| Point Clark | Reconstruction of Huron Road | $ 976,666.00 |
| Point Edward | Alfred Street (from Michigan Avenue to Village of Point Edward/City of Sarnia Boundary) | $ 110,000.00 |
| Point Edward | Bayview Storm Station Upgrades | $ 267,400.00 |
| Point Edward | Community Health Services Department Expansion | $ 558,000.00 |
| Point Edward | Rehabilitation and reconstruction of Michigan Avenue | $ 685,170.25 |
| Pointe au Baril | Improvements to South Shore Road | $ 597,714.00 |
| Port Burwell | Port Burwell Park Infrastructure Construction | $ 300,000.00 |
| Port Burwell, Vienna | Rehabilitation of the Bayham Water Distribution System | $ 720,948.00 |
| Port Carling | Improvements to Port Carling Streetscape | $ 258,265.00 |
| Port Carling | Replacement of Port Carling Wastewater Treatment Plant | $ 4,401,667.00 |
| Port Colborne | Seaway Wastewater Treatment Plant Expansion | $ 7,333,334.00 |
| Port Colborne | Soccer Complex Restoration and Rehabilitation | $ 100,000.00 |
| Port Colborne | Port Cares Reach Out Centre Renovations | $ 335,000.00 |
| Port Colborne | Catharine Street Watermain | $ 216,667.00 |
| Port Colborne | Construction of a Multi-Use Health and Wellness Recreation Centre | $ 6,866,667.00 |
| Port Elgin | MacGregor Point Park Infrastructure Development | $ 322,500.00 |
| Port Elgin | MacGregor Point Park Shelter Construction | $ 45,000.00 |
| Port Elgin | 10th Concession Drainage and Storm Sewer Installation | $ 403,333.00 |
| Port Hope | Joint Operations Centre | $ 1,672,448.00 |
| Port Hope | Reconstruction of Dorset Street in Port Hope | $ 545,000.00 |
| Port Hope | Rehabilitation of Peter and Hope streets | $ 602,978.49 |
| Port Hope | Construction of a new underpass on Highway 401 at East Townline Road | * |
| Port Hope | Trent River Bridge Repairs on Highway 401 | * |
| Port McNicoll | Improvements to the Port McNicoll wastewater treatment plant capacity | $ 2,708,000.00 |
| Port Perry | Revitalization of the Port Perry Downtown Waterfront | $ 3,500,000.00 |
| Powassan | Rehabilitation of Maplehill Bridge | $ 135,193.28 |
| Prescott | Maynard Waste Disposal Site Rehabilitation | $ 200,000.00 |
| Prescott | Prescott Water Pollution Control Centre Tank Insulation | $ 50,000.00 |
| Prescott | Prince Street Rehabilitation Program | $ 400,000.00 |
| Prescott | Asbestos Removal at Prescott's Water and Wastewater Treatment Facilities | $ 38,333.00 |
| Prescott | Florence Street Gravity Sewer | $ 73,333.00 |
| Prince Edward | Rehabilitation of County Road #15 | $ 1,166,666.00 |
| Prince Edward | Rehabilitation of County Road 25 | $ 256,666.00 |
| Prince Edward County | Watermains and sanitary sewers on Queen and Centre streets | $ 1,259,306.22 |
| Providence Bay | Improvements to the Providence Bay Arena | $ 81,986.48 |
| Puslinch | Expansion of the Puslinch multi-use recreational facility | $ 716,328.00 |
| Quinte West | Highway 401 - Stockdale Road Overpass Rehabilitation in Trenton | $ 300,000.00 |
| Quinte West | Replacement of the Smithfield overhead bridge | $ 2,365,833.00 |
| Radcliffe and Raglan | Rehabilitation of County Road 515/Palmer Road from Palmer Rapids to Combermere | $ 366,666.00 |
| Rainy River | Municipal Office Renewal | $ 15,000.00 |
| Rainy River | Refurbish Public Works Garage and Fire Hall | $ 140,000.00 |
| Rainy River | Upgrade of River Road | $ 33,000.00 |
| Rainy River | Upgrading of Japada Road | $ 27,061.00 |
| Rainy River | Rehabilitation of Atwood Avenue Water and Waste Water Lines | $ 666,667.00 |
| Raleigh, Chatham | Renewal of the Sixth Line Bridge Over Raleigh Plains Drain | $ 850,000.00 |
| Ramara | Water Meters | $ 280,000.00 |
| Ramara | County Road 44 Improvements | $ 1,666,666.00 |
| Ramara | Fire Hall #2 Expansion | $ 400,000.00 |
| Ramara | Improvements to Sideroad 15 and Concession B in Ramara | $ 323,333.00 |
| Red Rock | Lighting Retrofit | $ 11,666.00 |
| Red Rock | Boiler Replacement | $ 26,666.00 |
| Red Rock | Upgrades to wastewater treatment in Red Rock | $ 4,500,000.00 |
| Red Rock | Improvements to the Red Rock Recreation Centre | $ 280,577.00 |
| Red Rock | Installation of Water Meters | $ 82,533.90 |
| Red Rock Local Roads Board | Local road rehabilitation | $ 92,503.00 |
| Redbridge | Improvements to Songis Road | $ 98,926.38 |
| Redditt | Upgrading of Ena Lake Road | $ 17,550.00 |
| Redditt | Installation of ultraviolet treatment units | $ 127,710.00 |
| Redditt | Redditt waterline - membrane filtration | $ 121,050.00 |
| Renfrew | Road Resurfacing project | $ 160,000.00 |
| Renfrew | June Street Rehabilitation | $ 126,666.00 |
| Renfrew | Improvements to the Water Distribution System | $ 320,833.00 |
| Renfrew | Rehabilitation of County Road 58 in the County of Renfrew | $ 533,333.00 |
| Riceville | Rehabilitation of the Riceville Bridge | $ 411,584.32 |
| Richmond Hill | Richmond Hill Community Environmental Centre | $ 3,250,000.00 |
| Richmond Hill | Town-wide cycling infrastructure project | $ 343,811.00 |
| Richmond Hill | Leisure Lane Reconstruction | $ 933,000.00 |
| Richmond Hill | Axminster Drive Reconstruction | $ 424,000.00 |
| Richmond Hill | Clairage Drive Reconstruction | $ 1,545,000.00 |
| Richmond Hill | Elgin Barrow Arena Rehabilitation | $ 1,356,000.00 |
| Richmond Hill | Eyer Homestead Historical House Restoration | $ 1,020,000.00 |
| Richmond Hill | Gamble Road from Bathurst Street to Yonge Street | $ 1,233,333.00 |
| Richmond Hill | George Forster Historical House and Barn Restoration | $ 758,666.00 |
| Rideau Lakes | Rehabilitation of Golf Club Road | $ 133,333.00 |
| Robinson | Upgrading of Sheshegwaning Access Road | $ 178,138.00 |
| Rossport | Highway 17 - Canadian Pacific Railway overhead bridge rehabilitation | * |
| Rugby | Improvements to Rugby Lake Road | $ 43,717.04 |
| Rural Route 1, Grafton | Centreton Library | $ 182,900.00 |
| Rural Route 1, Shannonville | Melrose Sand Dome Roof Rehabilitation | $ 28,750.00 |
| Rural Route 2, Brockville | Revitalization of the Algonquin Warehouse Equipment Maintenance Garage | $ 150,000.00 |
| Russell | Reconstruction and Surface Treatment - Route 200 | $ 366,650.00 |
| Russell | Construction of the Russell Public Library | $ 600,000.00 |
| Russell | Expansion and rehabilitation of the Russell sewage system | $ 2,567,904.00 |
| Russell and Nation | Brisson Bridge Rehabilitation | $ 528,000.00 |
| Sables-Spanish Rivers | Replacement of Four Large Culverts | $ 250,000.00 |
| Sarnia | Wellington Street Reconstruction | $ 3,900,000.00 |
| Sarnia | Investing in Community Learning - YMCA Learning and Career Centre | $ 425,187.00 |
| Sarnia | Pathways Community Therapeutic Pool and Recreation Facility Expansion Project | $ 593,333.00 |
| Sauble Beach | Construction of the Sauble Beach sewage treatment plant | $ 3,120,000.00 |
| Saugeen Shores | Bruce County Road 17 | $ 450,000.00 |
| Saugeen Shores | Construction of an inlet works building and sewage receiving station | $ 770,000.00 |
| Saugeen Shores | Rehabilitation of Northshore and Miramichi Bay roads | $ 357,500.00 |
| Sault Ste. Marie | New Municipal Building for Algoma Public Health | $ 7,333,334.00 |
| Sault Ste. Marie | Community Centre Rehabilitation in Sault Ste. Marie | $ 50,000.00 |
| Sault Ste. Marie | Highway Resurfacing - Algoma Region | $ 500,000.00 |
| Sault Ste. Marie | Hub Trail and Waterfront Walkway Expansion | $ 1,666,666.00 |
| Sault Ste. Marie | Reconstructing and Upgrading of 3rd Line of Peoples Road | $ 3,558,468.00 |
| Sault Ste. Marie | Huron Central Railway Rehabilitation | $ 15,000,000.00 |
| Scarborough | Children's Visitation Centre - Children’s Aid Society | $ 633,333.00 |
| Schreiber | New Municipal Public Works Garage | $ 288,733.00 |
| Schreiber | Resurfacing of Sunset Drive | $ 40,000.00 |
| Schreiber | Highway 17 - Canadian Pacific Railway Selim overhead rehabilitation | * |
| Scugog | Road Rehabilitation - Regional Road 7 | $ 450,000.00 |
| Scugog | Old Simcoe Road Reconstruction project | $ 1,353,333.00 |
| Seguin | Reconstruction of Tally Ho - Swords Road | $ 770,780.00 |
| Serpent River | Improvements to the Serpent River water distribution system | $ 169,373.00 |
| Severn | Fairgrounds Road Upgrade | $ 200,000.00 |
| Severn | Highway 400 - Resurfacing of Select Northbound Lanes | $ 1,100,000.00 |
| Shakespeare | Construction of Shakespeare Wastewater Servicing | $ 1,877,697.00 |
| Shallow Lake | Upgrades to the Shallow Lake Community Centre | $ 331,900.00 |
| Sharbot Lake | Revitalization of the playground at Oso Beach | $ 16,950.00 |
| Sharon | Sharon Temple Foundation Repair | $ 284,000.00 |
| Sheguiandah | Rehabilitation of Limit Street bridge | $ 63,991.81 |
| Shelburne | Upgrades to the Shelburne Community Centre | $ 1,000,000.00 |
| Shelburne | Construction of a water treatment facility and installation of water meters | $ 1,389,000.00 |
| Sherwood Lake Local Roads Board | Upgrades to Sherwood Lake Road | $ 9,000.00 |
| Shuniah | Safety Initiative for Highways 11, 17 and 61 | $ 1,768,000.00 |
| Shuniah | Grandview Beach Rehabilitation and Asphalt Paving | $ 325,592.00 |
| Shuniah | Rehabilitation of Silver Harbour and Bass Lake roads | $ 111,213.00 |
| Simcoe | Upgrade of the Simcoe water pollution control plant | $ 2,006,989.00 |
| Sioux Lookout | Development of the Sioux Lookout Cultural Centre for Youth and the Arts | $ 1,300,000.00 |
| Sioux Lookout | Improvements to the 7th Avenue sewer and road system | $ 1,235,322.00 |
| Sioux Narrows Nestor Falls | Construction of the Harbourfront and Interpretive Centre | $ 748,127.00 |
| Sioux Narrows-Nestor Falls | Municipal Multi-Use Facility | $ 165,000.00 |
| Smith-Ennismore-Lakefield | Charles Street Reconstruction | $ 167,325.00 |
| Smiths Falls | Replacement of Streetlighting | $ 290,000.00 |
| Smiths Falls | Upgrades to the water pollution control plant | $ 1,416,667.00 |
| Smithville | Townline road reconstruction | $ 770,009.00 |
| Smooth Rock Falls | Wastewater treatment plant upgrades | $ 79,186.86 |
| South Algonquin | Madawaska Multi-Purpose Building | $ 500,000.00 |
| South Bruce | Highway 9 - Clifford to Mildmay | $ 1,000,000.00 |
| South Bruce | Construction of the Teeswater and Formosa sanitary sewer collection and treatment system | $ 6,533,333.00 |
| South Bruce Peninsula | Sideroad 15 Bridge Replacement | $ 700,000.00 |
| South Bruce Peninsula | Howdenvale Road and Sunset Drive Roadway reconstruction and drainage improvements | $ 559,825.00 |
| South Dundas Township | Upgrades to the Iroquois Wastewater Treatment Plant in South Dundas | $ 9,000,000.00 |
| South Frontenac | Battersea Road | $ 325,000.00 |
| South Frontenac | Desert Lake Road | $ 300,000.00 |
| South Frontenac | Loughborough Lake Bridge Rehabilitation | $ 524,628.91 |
| South Glengarry | Rehabilitation of South Service Road/Trail | $ 1,302,108.00 |
| South River | South River watermain replacement and road reconstruction | $ 271,147.29 |
| South River | Rehabilitation of the South River Library | $ 166,891.00 |
| South Stormont | South Stormont Town Hall | $ 904,739.00 |
| South Stormont | Wales Village Watermain Extension | $ 306,667.00 |
| South Watten | Upgrading Highway 11 outside Fort Frances | $ 10,000.00 |
| South-West Oxford | Rehabilitation of County Road 9 | $ 562,558.00 |
| South-West Oxford | Dereham Line (South) | $ 37,809.00 |
| South-West Oxford | Foldens Line | $ 74,710.00 |
| South-West Oxford | Reconstruction of Dodge Line | $ 385,653.00 |
| Southampton | Sanitary Sewer Expansion - Saugeen River | $ 5,893,333.00 |
| Southwest Middlesex | Renovation of the Ekfrid Community Centre | $ 83,333.00 |
| Southwest Middlesex | Glencoe Fire Hall Replacement | $ 333,333.00 |
| Southwold | Renovation and Addition to Municipal Office | $ 168,000.00 |
| Southwold | Expansion of Landfill Gas Collection System - Green Lane Landfill | $ 337,000.00 |
| Southwold | Extension of the Southwold Water Distribution System | $ 659,114.27 |
| Southwold | Replacement of Oneida Bridge No. 6 | $ 78,286.03 |
| Spanish | Shedden Backline - Spanish | $ 172,580.00 |
| Spanish | Declerk Road | $ 128,068.00 |
| Spanish | Reconstruction of Garnier Road | $ 386,438.00 |
| Spanish | Rehabilitation of Spanish Public Road in the Town of Spanish | $ 531,020.00 |
| Springfield | Construction of the Malahide Community Place | $ 678,536.00 |
| Springwater | Improvements to Highway 400 Detour Routes - Wilson Drive | $ 816,666.00 |
| Springwater | Queen Street East | $ 533,333.00 |
| Sprucedale | Stisted Road Reconstruction Project | $ 63,333.00 |
| Sprucedale | Stisted Road slurry seal project | $ 53,333.00 |
| Sprucedale | Construction of the McMurrich/Monteith Recreation Centre | $ 150,000.00 |
| St. Agatha | Day Treatment Program Building | $ 375,000.00 |
| St. Catharines | Carlisle Street Garage Replacement | $ 9,333,333.00 |
| St. Catharines | Emergency Animal Shelter - Veterinary Facility | $ 450,000.00 |
| St. Catharines | Replacement of the Bourgoyne Bridge | $ 18,166,666.00 |
| St. Catharines | St. Catharines Arts Centre | $ 18,000,000.00 |
| St. Charles | Musky Bay Road Realignment | $ 237,009.00 |
| St. Charles | Reclamation of the St. Charles Landfill | $ 187,370.00 |
| St. Davids | Warner Road Reconstruction | $ 283,333.00 |
| St. Joseph | Parks Rehabilitation Project | $ 50,000.00 |
| St. Marys | St. Marys Water Tower Re-lining | $ 66,666.00 |
| St. Marys | Construction of a sludge treatment and management facility | $ 1,513,134.39 |
| St. Thomas | Wellington Street Reconstruction | $ 1,200,000.00 |
| St. Thomas | Installation of Stormwater Management at the Green Lane Landfill | $ 201,000.00 |
| St. Thomas | Canada Southern Railway Station Restoration Project | $ 546,400.00 |
| St. Thomas | Expansion of Leachate Control System - Green Lane Landfill | $ 1,528,000.00 |
| Stewarttown | Replacement of the Stewarttown Road bridge | $ 276,500.00 |
| Stirling | Water Treatment Plant - Standy Power System | $ 40,000.00 |
| Stirling | Police/Fire Facility | $ 1,000,000.00 |
| Stirling-Rawdon | Reconstruction of Hoards Road (Formerly County Road 8) in Stirling | $ 830,102.00 |
| Stirling-Rawdon | Rehabilitation of Front Street Sanitary Sewer System | $ 665,373.00 |
| Stirling/Rawdon - Hastings Highlands | Hastings Heritage Trail Improvements | $ 42,000.00 |
| Stone Mills | Municipal Garage | $ 833,550.00 |
| Stone Mills | Dewey Road Reconstruction | $ 633,210.00 |
| Stone Mills | Reconstruction of Frizzell Road | $ 1,043,607.24 |
| Storm Bay Local Roads Board | Improvements to road | $ 45,000.00 |
| Stratford | Southside storm system, Downie Ponds | $ 2,722,500.00 |
| Stratton | Community Centre Rehabilitation | $ 27,000.00 |
| Strong | Parks and Beaches Beautification Project | $ 33,333.00 |
| Strong | Replacement and Accommodation of Baler Unit | $ 96,164.00 |
| Sturgeon Falls | Minnehaha Bay Community Waterfront Park | $ 2,077,667.00 |
| Sturgeon Falls | Municipal Buildings Restoration Project | $ 170,000.00 |
| Sudbury | Municipal Road 80 (Paris Street), Kathleen Street to York Street | $ 3,833,334.00 |
| Sudbury | Rehabilitation of Falconbridge Highway in Sudbury | $ 4,333,334.00 |
| Sudbury | Rehabilitation of Lasalle Boulevard | $ 4,700,000.00 |
| Sudbury | Bell Park / Grace Hartman Amphitheatre | $ 1,665,000.00 |
| Sudbury | Highway 69 improvements | $ 35,800,000.00 |
| Sundridge | Municipal Office Expansion - Sundridge | $ 116,666.00 |
| Sundridge | Upgrades to Sundridge wastewater collection and treatment | $ 2,289,700.00 |
| Sutton West | Sibbald Point Museum | $ 100,000.00 |
| Sutton West | Sibbald Point Park - Day Use Improvements | $ 175,000.00 |
| Sutton West | Sibbald Point Picnic Shelter | $ 50,000.00 |
| Sydenham | Ambulance station - Township of South Frontenac | $ 250,000.00 |
| Sydenham | Improvements to the Sydenham Water Treatment Facility | $ 473,333.00 |
| Tarbutt and Tarbutt Additional | Improvements to Government and MacLennan roads | $ 119,093.00 |
| Tarbutt and Tarbutt Additional | Lakeshore Drive upgrades | $ 239,750.00 |
| Tavistock | Rudy Subdivision Reconstruction | $ 212,454.00 |
| Tay | Hogg Valley Road Reconstruction | $ 834,572.00 |
| Tay Valley | South Sherbrooke Fire Hall | $ 400,000.00 |
| Tay Valley | Stanleyville Road Rehabilitation and Improvement | $ 91,600.00 |
| Tay Valley | Upgrade Menzies Munro Road | $ 106,600.00 |
| Tecumseh | Salt Storage Facility - West Pike Creek Depot | $ 83,333.00 |
| Tecumseh | St. Alphonse Avenue Reconstruction | $ 1,255,000.00 |
| Tecumseh | County Road 11 from County Road 8 to Highway 3 Pavement Rehabilitation | $ 225,487.00 |
| Tecumseh | County Road 43 Pavement Preservation | $ 53,368.00 |
| Tecumseh | County Road 46 from County Road 17 to 8th Concession Pavement Rehabilitation | $ 285,906.00 |
| Tecumseh | Construction of the Oldcastle Hamlet wastewater servicing system | $ 1,583,333.00 |
| Teeswater | Teeswater Library Renovation and Accessibility Project | $ 115,000.00 |
| Tehkummah | Municipal Fire Hall | $ 110,000.00 |
| Tehkummah | Replacement of Government Road bridge | $ 300,000.00 |
| Temagami | Renewal of the storm water management system and lagoon in Temagami | $ 333,333.00 |
| Temiskaming Shores | Haileybury water reservoir 1 replacement | $ 340,000.00 |
| Temiskaming Shores | Highway Resurfacing - New Liskeard and Cochrane Regions | $ 500,000.00 |
| Temiskaming Shores | Construction of a new sanitary lift station and forcemain upgrades | $ 1,182,900.00 |
| Terrace Bay | Neys Visitor Centre Improvements | $ 100,000.00 |
| Terrace Bay | Retrofitting the St. Martin Catholic School into the Terrace Bay Public Library | $ 622,520.00 |
| Thames Centre | Recreation Facilities Expansion Project | $ 3,223,579.00 |
| The Blue Mountains | New Town Hall | $ 2,300,000.00 |
| The Blue Mountains | Beaver River Trail | $ 166,500.00 |
| The Blue Mountains | Reconstruction to the Plan 915 Water and Sanitary System at Blue Mountain | $ 1,363,849.00 |
| The Nation | Construction of a sewage collection system for Forest Park Community | $ 978,508.00 |
| Thedford | Thedford Bosanquet Community Centre Revitalization | $ 1,500,000.00 |
| Thedford | Thedford Village Green Project | $ 167,900.00 |
| Thessalon | Thessalon River Bridge Rehabilitation | $ 350,000.00 |
| Thessalon | Rehabilitation of Government Road bridge | $ 350,000.00 |
| Thorndale | Improvements to Wastewater Servicing in Thorndale | $ 2,951,667.00 |
| Thornhill | Expansion of the Thornhill Community Centre Library | $ 2,000,000.00 |
| Thorold | Seburn Road Bridge Replacement | $ 150,000.00 |
| Thorold | Ormond Street water and sewer improvements project | $ 693,000.00 |
| Thunder Bay | Prince Arthur’s Landing at Marina Park - Phase 1 | $ 14,650,000.00 |
| Thunder Bay | Renewal of the Mary J.L. Black Library | $ 1,370,000.00 |
| Thunder Bay | Upgrades to Gilbride Road | $ 112,500.00 |
| Thunder Bay | Highway 61 - Pine River bridge rehabilitation | * |
| Thunder Bay (Atikokan) | Spruce River Bridge Rehabilitation on Black Sturgeon Road | $ 250,000.00 |
| Thunder Bay (Atikokan) | McGraw Falls Bridge on Shabaqua Road | $ 300,000.00 |
| Thunder Bay District | Improvements to Hicks Lake Road safety | $ 94,500.00 |
| Tilbury | Sanitary Sewer Rehabilitation - Community of Tilbury | $ 400,000.00 |
| Tilbury East | Coutts Line Bridge | $ 700,000.00 |
| Tilbury East | Coutts Line Bridge over Baptiste Creek | $ 400,000.00 |
| Tillsonburg | Lisgar Avenue and Fourth Street Reconstruction | $ 675,000.00 |
| Tillsonburg | Reconstruction of Concession Street - Quarter Town Line Road | $ 515,824.00 |
| Timmins | Upgrades to wastewater treatment in the city of Timmins | $ 19,833,000.00 |
| Timmins | Rehabilitation of Star Lake Road | $ 202,772.00 |
| Timmins | Replacement of Barber's Bay Bridge | $ 1,873,333.00 |
| Tiny | Blam Beach Road Improvements | $ 113,645.00 |
| Toronto | Replacement of the Victoria Park Bus Terminal | $ 7,582,333.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 1,000,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 138,333.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 366,667.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 101,667.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 351,667.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 866,667.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 102,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 366,667.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 108,333.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 185,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 125,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 223,333.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 211,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 315,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 83,333.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 210,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 273,333.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 233,333.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 863,333.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 195,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 125,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 83,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 742,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 93,333.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 158,333.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 184,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 240,000.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 306,667.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 185,667.00 |
| Toronto | Replacement of Vintage Cast Iron Watermains | $ 700,000.00 |
| Toronto | Rexdale Multi-Service Community Hub | $ 2,730,000.00 |
| Toronto | Richview Library Project | $ 166,667.00 |
| Toronto | Rouge Beach Park - Trails and Pathways Rehabilitation | $ 100,000.00 |
| Toronto | Ryerson University Sports and Recreation Centre at Maple Leaf Gardens | $ 20,000,000.00 |
| Toronto | Scarborough Aboriginal Family-Life Centre | $ 845,180.00 |
| Toronto | Scarborough Heights Park - Trails and Pathways Rehabilitation | $ 13,333.00 |
| Toronto | Sidewalk Rehabilitation | $ 2,666,667.00 |
| Toronto | Solid Waste Management - Bermondsey Yard Improvements | $ 400,000.00 |
| Toronto | Solid Waste Management - Ingram Yard Improvements | $ 400,000.00 |
| Toronto | Solid Waste Management - Yonge Yard Improvements | $ 333,333.00 |
| Toronto | Spadina-Wellington Trunk Watermain Improvements | $ 2,000,000.00 |
| Toronto | Station Modernization Program | $ 7,139,000.00 |
| Toronto | Steeles Avenue Resurfacing | $ 5,000,000.00 |
| Toronto | Stephen Leacock Community Centre Redevelopment | $ 1,066,500.00 |
| Toronto | Subway Carhouse/Shop/Scarborough Rapid Transit - Facility Renewal Program | $ 3,520,000.00 |
| Toronto | Subway Escalator and Elevator Overhaul | $ 2,266,583.00 |
| Toronto | Subway Track Renewal | $ 1,590,667.00 |
| Toronto | Subway Tunnel Rehabilitation | $ 3,363,000.00 |
| Toronto | Tibetan Canadian Cultural Centre - Cultural Infrastructure Renewal | $ 3,311,625.00 |
| Toronto | Todmorden Mills Heritage Museum and Arts Centre | $ 423,000.00 |
| Toronto | Toronto Police Services 14 Division - Central Lockup | $ 8,680,000.00 |
| Toronto | Toronto Police Station Asphalt Repavement - 41 Division | $ 178,333.00 |
| Toronto | Toronto Reference Library Revitalization | $ 3,000,000.00 |
| Toronto | Toronto Transit Commission - Bridge and Tunnels | $ 4,459,833.00 |
| Toronto | Toronto Transit Commission - Bridges and Structures Maintenance Program | $ 1,418,000.00 |
| Toronto | Toronto Transit Commission - Easier Access Phase 3 | $ 7,376,917.00 |
| Toronto | Toronto Transit Commission - Facilities Roofing Rehabilitation Program | $ 3,922,667.00 |
| Toronto | Toronto Transit Commission - Kipling Station Improvements | $ 2,683,333.00 |
| Toronto | Toronto Transit Commission - Road Rehabilitation Program | $ 3,968,333.00 |
| Toronto | Toronto Transit Commission - Structural Paving Rehabilitation | $ 1,157,667.00 |
| Toronto | Toronto's Ronald McDonald House | $ 8,680,139.00 |
| Toronto | Transportation Facilities Improvements | $ 809,675.00 |
| Toronto | Transportation Facilities Improvements - Ellesmere Yard | $ 924,641.00 |
| Toronto | Transportation Facility Improvements | $ 412,698.00 |
| Toronto | Two New Covered Bunkers for Bermondsey Transfer Station | $ 483,333.00 |
| Toronto | Upgrades to the Streetcar Overhead System | $ 2,545,167.00 |
| Toronto | Upgrading Supporting Infrastructure for Streetcars | $ 534,667.00 |
| Toronto | Wedgewood Park - Trails and Pathways Rehabilitation | $ 13,333.00 |
| Toronto | West Deane Park North - Trails and Pathways Repair | $ 116,667.00 |
| Toronto | Wheel Trans Facility Renewal | $ 1,597,333.00 |
| Toronto | Woodford Park - Trails and Pathways Rehabilitation | $ 18,333.00 |
| Toronto | Woodgreen Seniors Community Facility | $ 700,000.00 |
| Toronto | Improvements to Salt Management Facilities - Ellesmere Yard | $ 666,667.00 |
| Toronto | Improvements to Salt Management Facilities - Kipling Yard | $ 666,667.00 |
| Toronto | Inglewood Heights Park - Trails and Pathways Rehabilitation | $ 26,667.00 |
| Toronto | Lake Shore Boulevard Resurfacing | $ 103,635.00 |
| Toronto | L'Amoreaux Community Centre North - Trails and Pathways Rehabilitation | $ 46,667.00 |
| Toronto | Laneway Improvements | $ 26,667.00 |
| Toronto | Laneway Improvements | $ 23,667.00 |
| Toronto | Laneway Improvements | $ 116,667.00 |
| Toronto | Laneway Improvements | $ 14,333.00 |
| Toronto | Laneway Improvements | $ 6,333.00 |
| Toronto | Laneway Improvements | $ 14,333.00 |
| Toronto | Laneway Improvements | $ 46,000.00 |
| Toronto | Laneway Improvements | $ 46,000.00 |
| Toronto | Laneway Improvements | $ 11,333.00 |
| Toronto | Laneway Improvements | $ 5,200.00 |
| Toronto | Laneway Improvements | $ 25,667.00 |
| Toronto | Laneway Improvements | $ 5,000.00 |
| Toronto | Laneway Improvements | $ 18,667.00 |
| Toronto | Laneway Improvements | $ 17,667.00 |
| Toronto | Laneway Improvements | $ 15,667.00 |
| Toronto | Laneway Improvements | $ 14,333.00 |
| Toronto | Laneway Improvements | $ 10,000.00 |
| Toronto | Laneway Improvements | $ 41,333.00 |
| Toronto | Laneway Improvements | $ 5,667.00 |
| Toronto | Laneway Improvements | $ 9,333.00 |
| Toronto | Laneway Improvements | $ 16,667.00 |
| Toronto | Laneway Improvements | $ 7,667.00 |
| Toronto | Laneway Improvements | $ 16,667.00 |
| Toronto | Laneway Improvements | $ 33,000.00 |
| Toronto | Laneway Improvements | $ 8,667.00 |
| Toronto | Laneway Improvements | $ 8,667.00 |
| Toronto | Laneway Improvements | $ 6,667.00 |
| Toronto | Laneway Improvements | $ 20,333.00 |
| Toronto | Laneway Improvements | $ 14,000.00 |
| Toronto | Lansdowne Avenue Bridge | $ 1,500,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 29,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 31,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 37,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 9,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 100,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 87,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 70,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 9,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 64,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 6,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 85,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 10,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 53,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 38,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 14,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 6,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 5,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 10,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 104,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 5,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 12,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 5,800.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 86,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 12,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 20,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 45,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 65,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 75,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 30,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 15,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 56,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 25,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 65,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 55,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 19,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 29,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 112,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 15,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 12,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 37,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 129,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 47,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 117,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 19,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 8,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 135,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 44,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 20,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 120,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 61,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 132,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 123,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 49,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 26,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 48,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 45,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 151,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 39,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 34,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 33,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 50,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 55,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 18,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 39,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 115,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 38,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 12,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 10,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 17,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 293,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 82,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 278,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 30,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 46,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 62,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 32,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 11,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 21,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 15,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 19,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 39,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 25,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 14,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 25,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 28,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 50,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 11,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 13,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 24,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 53,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 63,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 26,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 45,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 47,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 32,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 66,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 133,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 61,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 36,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 11,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 29,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 21,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 66,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 91,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 274,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 19,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 145,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 59,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 47,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 35,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 27,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 60,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 29,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 87,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 31,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 8,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 91,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 36,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 30,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 40,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 43,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 109,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 12,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 32,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 25,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 55,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 51,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 48,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 24,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 45,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 40,833.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 15,167.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 74,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 28,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 33,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 137,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 51,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 48,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 85,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 35,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 65,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 26,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 28,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 100,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 55,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 45,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 37,500.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 23,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 90,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 23,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 21,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 52,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 21,667.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 13,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 48,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 25,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 40,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 45,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 5,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 32,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 40,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 42,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 133,333.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 170,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 39,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 22,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 37,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 52,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 100,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 23,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 13,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 36,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 22,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 37,000.00 |
| Toronto | Lead Water Service Pipe Replacement | $ 44,000.00 |
| Toronto | Leaside Park | $ 66,667.00 |
| Toronto | Local Road Reconstruction | $ 34,667.00 |
| Toronto | Local Road Reconstruction | $ 26,333.00 |
| Toronto | Local Road Reconstruction | $ 20,333.00 |
| Toronto | Local Road Reconstruction | $ 104,667.00 |
| Toronto | Local Road Reconstruction | $ 317,000.00 |
| Toronto | Local Road Resurfacing | $ 46,135.00 |
| Toronto | Local Road Resurfacing | $ 41,829.00 |
| Toronto | Local Road Resurfacing | $ 53,998.00 |
| Toronto | Local Road Resurfacing | $ 47,973.00 |
| Toronto | Local Road Resurfacing | $ 46,849.00 |
| Toronto | Local Road Resurfacing | $ 34,695.00 |
| Toronto | Local Road Resurfacing | $ 81,073.00 |
| Toronto | Local Road Resurfacing | $ 70,352.00 |
| Toronto | Local Road Resurfacing | $ 171,962.00 |
| Toronto | Local Road Resurfacing | $ 100,315.00 |
| Toronto | Local Road Resurfacing | $ 85,437.00 |
| Toronto | Local Road Resurfacing | $ 67,231.00 |
| Toronto | Local Road Resurfacing | $ 46,520.00 |
| Toronto | Local Road Resurfacing | $ 146,028.00 |
| Toronto | Local Road Resurfacing | $ 55,060.00 |
| Toronto | Local Road Resurfacing | $ 55,519.00 |
| Toronto | Local Road Resurfacing | $ 201,427.00 |
| Toronto | Local Road Resurfacing | $ 23,231.00 |
| Toronto | Local Road Resurfacing | $ 98,505.00 |
| Toronto | Local Road Resurfacing | $ 99,326.00 |
| Toronto | Local Road Resurfacing | $ 73,011.00 |
| Toronto | Local Road Resurfacing | $ 76,424.00 |
| Toronto | Local Road Resurfacing | $ 88,070.00 |
| Toronto | Local Road Resurfacing | $ 27,259.00 |
| Toronto | Local Road Resurfacing | $ 74,532.00 |
| Toronto | Local Road Resurfacing | $ 46,393.00 |
| Toronto | Local Road Resurfacing | $ 38,179.00 |
| Toronto | Local Road Resurfacing | $ 24,489.00 |
| Toronto | Local Road Resurfacing | $ 178,460.00 |
| Toronto | Local Road Resurfacing | $ 32,399.00 |
| Toronto | Local Road Resurfacing | $ 28,115.00 |
| Toronto | Local Road Resurfacing | $ 128,588.00 |
| Toronto | Local Road Resurfacing | $ 36,810.00 |
| Toronto | Local Road Resurfacing | $ 37,221.00 |
| Toronto | Local Road Resurfacing | $ 52,933.00 |
| Toronto | Local Road Resurfacing | $ 52,496.00 |
| Toronto | Local Road Resurfacing | $ 53,389.00 |
| Toronto | Local Road Resurfacing | $ 70,882.00 |
| Toronto | Local Road Resurfacing | $ 70,296.00 |
| Toronto | Local Road Resurfacing | $ 15,085.00 |
| Toronto | Local Road Resurfacing | $ 36,784.00 |
| Toronto | Local Road Resurfacing | $ 23,120.00 |
| Toronto | Local Road Resurfacing | $ 97,348.00 |
| Toronto | Local Road Resurfacing | $ 131,465.00 |
| Toronto | Local Road Resurfacing | $ 8,992.00 |
| Toronto | Local Road Resurfacing | $ 8,918.00 |
| Toronto | Local Road Resurfacing | $ 54,758.00 |
| Toronto | Local Road Resurfacing | $ 48,674.00 |
| Toronto | Local Road Resurfacing | $ 42,238.00 |
| Toronto | Local Road Resurfacing | $ 24,820.00 |
| Toronto | Local Road Resurfacing | $ 27,836.00 |
| Toronto | Local Road Resurfacing | $ 48,674.00 |
| Toronto | Local Road Resurfacing | $ 44,111.00 |
| Toronto | Local Road Resurfacing | $ 124,312.00 |
| Toronto | Local Road Resurfacing | $ 46,393.00 |
| Toronto | Local Road Resurfacing | $ 40,612.00 |
| Toronto | Local Road Resurfacing | $ 40,277.00 |
| Toronto | Local Road Resurfacing | $ 22,816.00 |
| Toronto | Local Road Resurfacing | $ 69,556.00 |
| Toronto | Local Road Resurfacing | $ 57,801.00 |
| Toronto | Local Road Resurfacing | $ 63,733.00 |
| Toronto | Local Road Resurfacing | $ 63,206.00 |
| Toronto | Local Road Resurfacing | $ 90,510.00 |
| Toronto | Local Road Resurfacing | $ 50,956.00 |
| Toronto | Local Road Resurfacing | $ 50,535.00 |
| Toronto | Local Road Resurfacing | $ 20,063.00 |
| Toronto | Local Road Resurfacing | $ 55,671.00 |
| Toronto | Local Road Resurfacing | $ 48,310.00 |
| Toronto | Local Road Resurfacing | $ 90,199.00 |
| Toronto | Local Road Resurfacing | $ 78,272.00 |
| Toronto | Local Road Resurfacing | $ 67,509.00 |
| Toronto | Local Road Resurfacing | $ 66,951.00 |
| Toronto | Local Road Resurfacing | $ 57,953.00 |
| Toronto | Local Road Resurfacing | $ 50,289.00 |
| Toronto | Local Road Resurfacing | $ 38,278.00 |
| Toronto | Local Road Resurfacing | $ 137,657.00 |
| Toronto | Local Road Resurfacing | $ 136,519.00 |
| Toronto | Local Road Resurfacing | $ 6,388.00 |
| Toronto | Local Road Resurfacing | $ 55,671.00 |
| Toronto | Local Road Resurfacing | $ 121,989.00 |
| Toronto | Local Road Resurfacing | $ 11,104.00 |
| Toronto | Local Road Resurfacing | $ 22,897.00 |
| Toronto | Local Road Resurfacing | $ 327,199.00 |
| Toronto | Local Road Resurfacing | $ 30,117.00 |
| Toronto | Local Road Resurfacing | $ 57,953.00 |
| Toronto | Local Road Resurfacing | $ 266,813.00 |
| Toronto | Local Road Resurfacing | $ 48,978.00 |
| Toronto | Local Road Resurfacing | $ 20,839.00 |
| Toronto | Local Road Resurfacing | $ 285,656.00 |
| Toronto | Lynngate Park - Trails and Pathways Rehabilitation | $ 28,333.00 |
| Toronto | Main Road Resurfacing - Toronto Island | $ 100,000.00 |
| Toronto | Manhattan Park - Trails and Pathways Rehabilitation | $ 18,333.00 |
| Toronto | Maryvale Park - Trails and Pathways Rehabilitation | $ 40,000.00 |
| Toronto | Morningside Park - Trails and Pathways Rehabilitation | $ 116,667.00 |
| Toronto | Nesbitt Park | $ 33,333.00 |
| Toronto | New Central Lockup for the 11th Division of the Toronto Police | $ 9,693,000.00 |
| Toronto | North York Central Reference Library Renovation | $ 366,667.00 |
| Toronto | North York Community Basement Flooding Relief - Cactus Avenue | $ 233,333.00 |
| Toronto | North York Community Basement Flooding Relief - Caines Avenue | $ 633,333.00 |
| Toronto | North York Community Basement Flooding Relief - Connaught Avenue | $ 833,333.00 |
| Toronto | North York Community Basement Flooding Relief - Demaris Avenue | $ 166,667.00 |
| Toronto | North York Community Basement Flooding Relief - Driftwood Avenue | $ 166,667.00 |
| Toronto | North York Community Basement Flooding Relief - Finch Avenue | $ 833,333.00 |
| Toronto | North York Community Basement Flooding Relief - Fontainbleau Drive | $ 666,667.00 |
| Toronto | North York Community Basement Flooding Relief - Godstone Road | $ 1,066,667.00 |
| Toronto | North York Community Basement Flooding Relief - Gustav Crescent | $ 33,333.00 |
| Toronto | North York Community Basement Flooding Relief - Homewood Avenue | $ 2,083,333.00 |
| Toronto | North York Community Basement Flooding Relief - Hoover Crescent | $ 270,000.00 |
| Toronto | North York Community Basement Flooding Relief - Leith Hill Rd | $ 250,000.00 |
| Toronto | North York Community Basement Flooding Relief - Meadowacres Drive | $ 300,000.00 |
| Toronto | North York Community Basement Flooding Relief - Northwood Drive | $ 200,000.00 |
| Toronto | North York Community Basement Flooding Relief - Patricia Avenue | $ 833,333.00 |
| Toronto | North York Community Basement Flooding Relief - Rockford Road | $ 100,000.00 |
| Toronto | North York Community Basement Flooding Relief - St. Paschat Court | $ 30,000.00 |
| Toronto | North York Community Basement Flooding Relief - Steeles Avenue East | $ 600,000.00 |
| Toronto | North York Community Basement Flooding Relief - Sunnycrest Road | $ 150,000.00 |
| Toronto | North York Community Basement Flooding Relief - Tanner Court | $ 66,667.00 |
| Toronto | North York Community Basement Flooding Relief - Tobruk Crescent | $ 33,333.00 |
| Toronto | North York Community Basement Flooding Relief - Topcliff Avenue | $ 250,000.00 |
| Toronto | Northern District Library Renovation | $ 316,667.00 |
| Toronto | Permanent Storage Facility in Yonge-Dundas Square | $ 66,667.00 |
| Toronto | Police Headquarters Exterior Rehabilitation | $ 111,667.00 |
| Toronto | Port Royal Park - Trails and Pathways Rehabilitation | $ 30,000.00 |
| Toronto | Queen Street Bridge | $ 1,500,000.00 |
| Toronto | R.V. Burgess Park | $ 26,667.00 |
| Toronto | Rebuild Emergency Medical Services Station 19 | $ 701,333.00 |
| Toronto | Reception Centre Improvement - COSTI Immigrant Services | $ 1,000,000.00 |
| Toronto | Reconstruction and Expansion of Emergency Medical Services Station 40 | $ 1,033,333.00 |
| Toronto | Reconstruction and Resurfacing of Don Mills Road | $ 19,333.00 |
| Toronto | Reconstruction and Resurfacing of Eglinton Avenue East | $ 38,000.00 |
| Toronto | Reconstruction and Resurfacing of Empress Avenue | $ 19,000.00 |
| Toronto | Reconstruction and Resurfacing of Finch Avenue East | $ 168,667.00 |
| Toronto | Reconstruction and Resurfacing of Lawrence Avenue West | $ 556,333.00 |
| Toronto | Reconstruction and Resurfacing of Leslie Street | $ 177,667.00 |
| Toronto | Reconstruction and Resurfacing of Millwood Road | $ 142,667.00 |
| Toronto | Reconstruction and Resurfacing of Victoria Park Avenue | $ 3,000,000.00 |
| Toronto | Reconstruction and Resurfacing of Yonge Street | $ 557,000.00 |
| Toronto | Regent Park Arts and Cultural Centre | $ 12,000,000.00 |
| Toronto | Rehabilitation of Trails and Pathways - Albion Gardens Park | $ 41,667.00 |
| Toronto | Rehabilitation of Trails and Pathways - Birchmount Stadium Park | $ 53,333.00 |
| Toronto | Rehabilitation of Trails and Pathways - Bloordale Park North | $ 41,667.00 |
| Toronto | Rehabilitation of Trails and Pathways - Fundy Bay Park | $ 46,667.00 |
| Toronto | Rehabilitation of Trails and Pathways - Lavery Trail Park | $ 13,333.00 |
| Toronto | Rehabilitation of Trails and Pathways - Rouge Valley Park/Glen Rouge Campground | $ 35,000.00 |
| Toronto | Rennie Park - Trails and Rathways Rehabilitation | $ 38,333.00 |
| Toronto | Renovation of Yonge Street Mission Infrastructure | $ 465,000.00 |
| Toronto | Repairs to Toronto Community Housing buildings | $ 2,023,042.00 |
| Toronto | Replacement of Emergency Medical Services Station 41 | $ 756,333.00 |
| Toronto | 14 Vaughan Road Renovation - Na-Me-Res (Native Men's Residence) | $ 450,000.00 |
| Toronto | Agincourt Library Renovation | $ 270,000.00 |
| Toronto | Anewan Greenbelt - Trails and Pathways Rehabilitation | $ 18,333.00 |
| Toronto | Art Gallery of Ontario - Weston Family Learning Centre | $ 7,500,000.00 |
| Toronto | Asphalt Paving | $ 666,667.00 |
| Toronto | Bathurst-Finch Community Hub: A United Way Toronto Initiative | $ 1,000,000.00 |
| Toronto | Berry Road Park- Trails and Pathways Rehabilitation | $ 30,000.00 |
| Toronto | Birchmount Bus Garage Repair Bay Modifications | $ 2,400,333.00 |
| Toronto | Bloor Street Railway Bridge Span | $ 1,250,000.00 |
| Toronto | Bloor-Islington Bridge Rehabilitation | $ 344,828.00 |
| Toronto | Braeburn Active Living Centre | $ 250,000.00 |
| Toronto | Brock Avenue Bridge | $ 1,100,000.00 |
| Toronto | Bus Garage and Shops Facility Renewal Program | $ 1,621,333.00 |
| Toronto | Canada Initiative at the Royal Ontario Museum | $ 2,750,000.00 |
| Toronto | Canadian Film Centre | $ 3,250,000.00 |
| Toronto | Carhouse Modifications - New Light Rail Vehicle Program | $ 1,275,000.00 |
| Toronto | Chalkfarm Park - Trails and Pathways Rehabilitation | $ 76,667.00 |
| Toronto | Children's Hub - Toronto | $ 1,799,147.00 |
| Toronto | Clanton Park - Trails and Pathways Rehabilitation | $ 38,333.00 |
| Toronto | Coatsworth Cut Water Quality Improvements | $ 2,333,333.00 |
| Toronto | Confederation Park - Trails and Pathways Rehabilitation | $ 30,000.00 |
| Toronto | Covenant House Toronto - Capital Restoration | $ 627,500.00 |
| Toronto | Deep Lake Water Cooling System - Front Street | $ 588,333.00 |
| Toronto | Demolishment and Reconstruction of the Emergency Medical Services Station 1 | $ 766,667.00 |
| Toronto | Don Valley Parkway Resurfacing | $ 333,333.00 |
| Toronto | Driftwood Park - Trails and Pathways Rehabilitation | $ 30,000.00 |
| Toronto | Dupont Street Bridge | $ 1,250,000.00 |
| Toronto | Earl Bales Park Stormwater Management Pond | $ 3,333,333.00 |
| Toronto | East Don Trail | $ 715,000.00 |
| Toronto | Emergency Medical Services Station 11 Refurbishment | $ 283,333.00 |
| Toronto | Emergency Medical Services Station 28 Refurbishment | $ 366,667.00 |
| Toronto | Emergency Medical Services Station 38 Refurbishment | $ 366,667.00 |
| Toronto | Emergency Medical Services Station 44 Expansion | $ 153,333.00 |
| Toronto | Emergency Medical Services Station Refurbishment - Northeast District Office | $ 190,000.00 |
| Toronto | Emergency Repair of Coxwell Sanitary Sewer | $ 13,333,333.00 |
| Toronto | Etobicoke Valley Park - Trails and Pathways Rehabilitation | $ 38,333.00 |
| Toronto | Exhibition Place - Automotive Building Restoration | $ 1,105,000.00 |
| Toronto | Exhibition Place - Better Living Centre Upgrades | $ 1,768,000.00 |
| Toronto | Exhibition Place - Coliseum Complex - Industry Building - Window and Roof Replacement | $ 955,000.00 |
| Toronto | Exhibition Place - Coliseum Complex - Partial Roof Replacement | $ 1,943,333.00 |
| Toronto | Exhibition Place - Direct Energy Centre - Interior Infrastructure and Electrical Upgrades | $ 401,667.00 |
| Toronto | Exhibition Place - Horse Palace Roof Replacement | $ 700,000.00 |
| Toronto | Exhibition Place - Press Building Restoration | $ 85,000.00 |
| Toronto | Exhibition Place - Princes' Gates Restoration | $ 2,166,000.00 |
| Toronto | Fairview Library Renovation | $ 300,000.00 |
| Toronto | Fred Victor Community Services Centre Renovation | $ 1,100,599.00 |
| Toronto | Gardiner Expressway Resurfacing | $ 563,032.00 |
| Toronto | Gardiner-Bathurst/Strachan Bridge Rehabilitation | $ 827,586.00 |
| Toronto | Guildwood Park / Guild Inn Trails and Pathways Rehabilitation | $ 116,667.00 |
| Toronto | Habitant Park - Trails and Pathways Rehabilitation | $ 26,667.00 |
| Toronto | Harvest Moon Park - Trails and Pathways Rehabilitation | $ 31,667.00 |
| Toronto | Highway 401 - Dixie Road Bridge Rehabilitation | $ 300,000.00 |
| Toronto | Highway 401 - Renforth Road Bridge Rehabilitation | $ 325,000.00 |
| Toronto | Historic Building Roof Replacement | $ 120,000.00 |
| Toronto | Toronto-York-Spadina Subway Extention | $ 622,000,000.00 |
| Toronto | Union Station Revitalization | $ 133,000,000.00 |
| Town of Caledon | Resurfacing - King Street from Creditview Road to Mississauga Road | $ 126,423.00 |
| Town of Caledon | Resurfacing - on the Forks of the Credit Road from Hurontario Street to West | $ 1,300,000.00 |
| Township of Cavan Monaghan, County of Peterborough | Construction of a New Maintenance Facility at Peterborough Airport | $ 166,666.00 |
| Township of Cavan Monaghan, Peterborough County | Aviation Industrial Park - Peterborough Airport | $ 7,000,000.00 |
| Township of Rideau Lakes | Rehabilitation of William and Matthew streets | $ 70,564.00 |
| Trent Hills | Sewer Separation and Infrastructure Renewal | $ 650,098.00 |
| Trent Hills | Watermain Replacement - Hastings | $ 603,751.00 |
| Trent Hills | Sewer Separation and Infrastructure Improvements at Oliver/Isabella/Major | $ 476,667.00 |
| Tudor and Cashel | Rehabilitation of Weslemkoon Lake Road | $ 250,000.00 |
| Tweed | New Tweed Public Library | $ 300,000.00 |
| Tweed | Rehabilitation of Marlbank Road | $ 469,983.00 |
| Tweed | River Street reconstruction | $ 1,051,521.00 |
| Tweed | Replacement of the Paul Clement Bridge | $ 366,667.00 |
| Tyendinaga | Resurfacing of Callaghan Road | $ 52,618.63 |
| Tyendinaga Mohawk Territory | Rehabilitation of Bayshore Road | $ 228,114.00 |
| Upsala | Rehabilitation of Upsala community centre | $ 47,250.00 |
| Upsala | Highway 17 - Big Firesteel River and Beaver Creek bridges rehabilitation | * |
| Uxbridge | Road Rehabilitation - Regional Highway 47 | $ 1,666,667.00 |
| Uxbridge | Road Rehabilitation - Regional Road 21 | $ 166,667.00 |
| Uxbridge | Replacement of the Glasgow Bridge | $ 275,000.00 |
| Val Gagné | Rehabilitation of Monahan Road | $ 128,620.00 |
| Val Rita-Harty | Municipal Chalet | $ 30,145.00 |
| Val Rita-Harty | Hydrological Evaluation and Cleaning of Clear Well | $ 23,467.00 |
| Vankleek Hill | Pleasant Corner Road Reconstruction | $ 58,333.00 |
| Vankleek Hill | Improvements to the Vankleek Hill lagoon sewage treatment plant | $ 269,167.00 |
| Vaughan | Retrofit of the Ice Rink at the Al Palladini Community Centre | $ 91,667.00 |
| Vaughan | Ridgefield Crescent | $ 81,066.00 |
| Vaughan | Rimmington Drive | $ 53,200.00 |
| Vaughan | Road Rehabilitation - Porter Avenue | $ 7,500.00 |
| Vaughan | Robinwood Trail | $ 32,134.00 |
| Vaughan | Rose Green Drive | $ 107,734.00 |
| Vaughan | Rosegreen Drive | $ 55,734.00 |
| Vaughan | Roselawn Drive | $ 99,700.00 |
| Vaughan | San Vito Drive | $ 8,266.00 |
| Vaughan | Sequoia Road | $ 5,600.00 |
| Vaughan | Sgotto Boulevard | $ 9,266.00 |
| Vaughan | Sherbourne Drive | $ 22,934.00 |
| Vaughan | Sicilia Street | $ 4,600.00 |
| Vaughan | Siderno Crescent | $ 26,134.00 |
| Vaughan | Silverado Trail | $ 7,066.00 |
| Vaughan | Springfield Way | $ 30,100.00 |
| Vaughan | St. Mark Drive | $ 17,866.00 |
| Vaughan | Stephanie Boulevard | $ 119,400.00 |
| Vaughan | Sterling Court | $ 4,300.00 |
| Vaughan | Sterling Crescent | $ 33,034.00 |
| Vaughan | Stonemill Gate | $ 13,400.00 |
| Vaughan | Street Lighting Conversion to Energy Efficient | $ 500,000.00 |
| Vaughan | Swanage Drive | $ 26,500.00 |
| Vaughan | Sylvester Court | $ 6,900.00 |
| Vaughan | Sylwood Crescent | $ 25,900.00 |
| Vaughan | Tandian Court | $ 14,100.00 |
| Vaughan | Tavio Way | $ 8,534.00 |
| Vaughan | The Woodbridge Memorial Tower and Park Site Rehabilitation - Landscaping | $ 56,667.00 |
| Vaughan | Thomas Henry Road | $ 16,400.00 |
| Vaughan | Thomson Creek Boulevard | $ 63,466.00 |
| Vaughan | Thornbank Road Upgrades | $ 1,324,800.00 |
| Vaughan | Townsgate Drive | $ 42,100.00 |
| Vaughan | Vera Street | $ 29,500.00 |
| Vaughan | Vespucci Drive | $ 5,834.00 |
| Vaughan | Via Canala Way | $ 2,166.00 |
| Vaughan | Via Carmine Way | $ 24,300.00 |
| Vaughan | Via Cristina Way | $ 8,466.00 |
| Vaughan | Via Lanciano Crescent | $ 2,434.00 |
| Vaughan | Villa Antica Drive | $ 7,900.00 |
| Vaughan | Villandry Crescent | $ 18,000.00 |
| Vaughan | Weston Road Resurfacing | $ 450,000.00 |
| Vaughan | Woodcroft Lane | $ 44,434.00 |
| Vaughan | Woodgreen Drive | $ 27,466.00 |
| Vaughan | York Hill Boulevard | $ 10,266.00 |
| Vaughan | York Hill Boulevard | $ 20,234.00 |
| Vaughan | Huntington Road | $ 11,667.00 |
| Vaughan | Huntingwood Court | $ 31,634.00 |
| Vaughan | Improvements to Noah Crescent | $ 11,766.00 |
| Vaughan | Jacob Keffer Parkway | $ 16,000.00 |
| Vaughan | Julia Valentina Avenue | $ 33,666.00 |
| Vaughan | Kayla Cresent | $ 24,100.00 |
| Vaughan | Keele Street Resurfacing | $ 416,667.00 |
| Vaughan | Killian Road | $ 182,166.00 |
| Vaughan | Kirkbride Crescent | $ 14,134.00 |
| Vaughan | Klamath Court | $ 8,166.00 |
| Vaughan | Kleinburg Library building Retrofit | $ 58,334.00 |
| Vaughan | Kortright Place | $ 21,166.00 |
| Vaughan | Lamar Street | $ 47,634.00 |
| Vaughan | Laura Sabrina Drive | $ 8,134.00 |
| Vaughan | Leith Court | $ 9,866.00 |
| Vaughan | Leyton Road | $ 9,166.00 |
| Vaughan | Lio Avenue | $ 12,566.00 |
| Vaughan | Lockheed Avenue | $ 20,166.00 |
| Vaughan | Longview Crescent | $ 7,766.00 |
| Vaughan | Lookout Point Court | $ 8,734.00 |
| Vaughan | Lucena Crescent | $ 12,400.00 |
| Vaughan | Lucky Court | $ 13,834.00 |
| Vaughan | Maple Community Centre | $ 100,000.00 |
| Vaughan | Maple Nature Reserve - Quonset Hut Site Regeneration | $ 192,834.00 |
| Vaughan | Maple Nature Reserve - Trail System Connections | $ 30,000.00 |
| Vaughan | Marco Sgotto Avenue | $ 9,066.00 |
| Vaughan | Marisa Court | $ 9,100.00 |
| Vaughan | Marlott Road | $ 90,566.00 |
| Vaughan | Martin Grove Road | $ 129,034.00 |
| Vaughan | Martin Grove Road Improvement | $ 888,100.00 |
| Vaughan | Marwood Place | $ 50,934.00 |
| Vaughan | Maxwell Court | $ 17,500.00 |
| Vaughan | McNaughton Road | $ 65,800.00 |
| Vaughan | McQuarrie Lane | $ 18,000.00 |
| Vaughan | Melville Road | $ 49,666.00 |
| Vaughan | Mill Arbour Lane | $ 35,600.00 |
| Vaughan | Millbank Court | $ 18,600.00 |
| Vaughan | Millcreek Crescent | $ 28,166.00 |
| Vaughan | Monica Court | $ 5,234.00 |
| Vaughan | Monterey Road | $ 6,334.00 |
| Vaughan | Mortimer Crescent | $ 6,300.00 |
| Vaughan | Mount Charles Crescent | $ 17,500.00 |
| Vaughan | Muirside Road | $ 8,500.00 |
| Vaughan | Mustang Road | $ 4,400.00 |
| Vaughan | Muzich Place | $ 8,766.00 |
| Vaughan | Nicola Court | $ 6,166.00 |
| Vaughan | Nort Johnson Park - Installation of Walkway Lighting | $ 83,334.00 |
| Vaughan | Norwood Avenue | $ 13,066.00 |
| Vaughan | Oakbank Road | $ 388,600.00 |
| Vaughan | Oakdale Road | $ 36,366.00 |
| Vaughan | Oliver Lane | $ 54,734.00 |
| Vaughan | Parsons Court | $ 5,000.00 |
| Vaughan | Pathway Paving and Lighting Rehabilitation - Westwood Park | $ 45,066.00 |
| Vaughan | Payson Avenue | $ 9,166.00 |
| Vaughan | Pierina Court | $ 4,834.00 |
| Vaughan | Pine Hollow Crescent | $ 15,600.00 |
| Vaughan | Pine Meadow Drive | $ 15,266.00 |
| Vaughan | Piper Court | $ 3,400.00 |
| Vaughan | Rainbow Creek Park Renewal and Redevelopment | $ 434,000.00 |
| Vaughan | Rehabilitation of Courtland Avenue | $ 49,834.00 |
| Vaughan | Rehabilitation of David Todd Avenue | $ 14,900.00 |
| Vaughan | Rehabilitation of Kipling Avenue | $ 87,700.00 |
| Vaughan | Rehabilitation of Millway Avenue | $ 35,634.00 |
| Vaughan | Adriana Louise Drive | $ 15,234.00 |
| Vaughan | Al Palladini Community Centre - New Elevator Installation | $ 100,000.00 |
| Vaughan | Alanno Way | $ 5,766.00 |
| Vaughan | Amaretto Court | $ 19,234.00 |
| Vaughan | Amy Court | $ 35,334.00 |
| Vaughan | Ansley Grove Road | $ 494,433.00 |
| Vaughan | Antonella Crescent | $ 46,166.00 |
| Vaughan | Art Drive | $ 8,833.00 |
| Vaughan | Asquith Place | $ 59,200.00 |
| Vaughan | Bathurst Clark Library Retrofit | $ 133,334.00 |
| Vaughan | Bathurst Street Resurfacing | $ 600,000.00 |
| Vaughan | Beatrice Way | $ 72,934.00 |
| Vaughan | Beechnut Road | $ 7,200.00 |
| Vaughan | Binscarth Crescent | $ 34,034.00 |
| Vaughan | Blaine Court | $ 34,934.00 |
| Vaughan | Blossom Court | $ 4,234.00 |
| Vaughan | Cartwright Boulevard | $ 9,767.00 |
| Vaughan | Casa Vista Drive | $ 5,600.00 |
| Vaughan | Castle Park Boulevard | $ 12,600.00 |
| Vaughan | Chancellor Community Centre - Phase 1 | $ 133,333.00 |
| Vaughan | Chancellor Drive and Weston Road | $ 35,000.00 |
| Vaughan | Chilmar Crescent | $ 32,366.00 |
| Vaughan | Construct Park Washroom Facilities at Doctor McLean's Park | $ 466,667.00 |
| Vaughan | Corrine Court | $ 5,900.00 |
| Vaughan | Courtland Avenue Improvements | $ 19,634.00 |
| Vaughan | Criscione Drive | $ 9,100.00 |
| Vaughan | Domenica Way | $ 2,734.00 |
| Vaughan | Don and Humber Trail System | $ 100,000.00 |
| Vaughan | Dufferin Street Resurfacing | $ 700,000.00 |
| Vaughan | Dundurn Crescent | $ 32,266.00 |
| Vaughan | Ed Quigg Way | $ 6,866.00 |
| Vaughan | Eddington Place | $ 10,134.00 |
| Vaughan | Elmbank Road Reconstruction | $ 378,133.00 |
| Vaughan | Erica Road | $ 389,267.00 |
| Vaughan | Fonteselva Avenue Improvements | $ 12,134.00 |
| Vaughan | Garnet A. Williams Community Centre Ice Rink Retrofit | $ 83,334.00 |
| Vaughan | Giovanni Way | $ 8,434.00 |
| Vaughan | Goldpark Court | $ 17,934.00 |
| Vaughan | Highway 7 and Edgeley Boulevard | $ 50,000.00 |
| Vaughan | Phase 3 of the Joseph and Wolf Lebovic Jewish Community Campus | $ 15,000,000.00 |
| Vermilion Bay | Creation of Pine Tree Park Centennial Pavillion | $ 32,500.00 |
| Vermilion, Jordan and Pickerel | Cedarbough Residential Ontario Ranger Camp renewal | $ 250,000.00 |
| Victoria Harbour | Ceremonial Round House/Community Centre - Enaahtig Healing Lodge and Learning Centre | $ 252,000.00 |
| Virginiatown | Replacement of Virginiatown Pumping Station | $ 773,710.86 |
| Wainfleet | Misener Road Bridge | $ 100,000.00 |
| Wainfleet | Boullion Road Bridge | $ 100,000.00 |
| Wainfleet | Rehabilitation of Feeder Road | $ 250,000.00 |
| Wallaceburg | Sanitary Sewer Rehabilitation - Community of Wallaceburg | $ 1,166,666.00 |
| Wallaceburg | Sanitary Sewer Rehabilitation - Community of Wallaceburg | $ 533,334.00 |
| Warren | Upgrades to the Markstay-Warren Community Centre | $ 150,667.00 |
| Warsaw | Rehabilitation of University Road | $ 400,979.00 |
| Warwick | Replacement of the Wall Street waterline | $ 69,190.00 |
| Wasaga Beach | Rehabilitation of McIntyre Creek Trail | $ 180,000.00 |
| Wasaga Beach | 45th Street Reconstruction | $ 520,908.00 |
| Wasaga Beach | Improvements to 57th Street and Shore Lane Drainage | $ 900,073.00 |
| Waterloo | Lakeshore Neighbourhood Road Resurfacing | $ 193,667.00 |
| Waterloo | Landfill Gas Pipeline Twinning | $ 550,000.00 |
| Waterloo | Main Scales and Scalehouse Replacement | $ 500,000.00 |
| Waterloo | Pinewood Place Reconstruction | $ 190,533.00 |
| Waterloo | Regional Road 22 (Northfield Drive) from Waterloo/Woolwich Boundary to Scotch Line Road | $ 670,000.00 |
| Waterloo | Bearinger Road Corridor Improvements | $ 586,667.00 |
| Waterloo | Centre of Excellence for Children and Families | $ 2,000,000.00 |
| Waterloo | Columbia Street Corridor Improvements | $ 403,333.00 |
| Waterloo | Highways 7 and 8 Retrofit | $ 1,200,000.00 |
| Waterloo | Construction of the Research in Motion (RIM) Park premium outdoor sports field facility in Waterloo | $ 1,631,190.00 |
| Waterloo | Improvements to the Davenport Road multi-use corridor | $ 966,413.00 |
| Waterloo | Highway 8 Improvements | $ 29,908,500.00 |
| Waterloo | Kitchener-Waterloo Rapid Transit | $ 265,000,000.00 |
| Wawa | Upgrades to the Michipicoten Memorial Community Centre | $ 58,333.00 |
| Wawa | Wawa Airport Airside Pavement Rehabilitation | $ 267,140.00 |
| Wawa | Reconstruction of Klondike Street and Centennial Avenue | $ 682,696.00 |
| Wawa | Rehabilitation of the Municipality of Wawa air terminal | $ 24,566.47 |
| Welland | Thorold Road Intersection and Roadway Improvements | $ 2,000,000.00 |
| Welland | Welland Multi-Service Community Centre | $ 900,000.00 |
| Welland | Construction of the Rose City Community Wellness and Abilities Centre | $ 3,000,000.00 |
| Wellesley | Siegner Bridge Handrail Upgrades | $ 95,000.00 |
| Wellesley | Weimer Line Resurfacing, from Greenwood Hill Road to Hutchison Road | $ 123,000.00 |
| Wellesley | Hessen Strasse Resurfacing: Moser Young Road to Hutchinson Road | $ 421,500.00 |
| Wellington | Replacement of the Wellington and District Community Centre | $ 3,949,000.00 |
| Wellington North | Cork Street Sewage Pumping Station | $ 600,000.00 |
| Wendover | Wendover Water Pollution Control Plant Upgrade | $ 2,190,558.00 |
| West Elgin | Highway 401 - Road Repairs | $ 2,000,000.00 |
| West Elgin (West Lorne) | Renovations to the West Elgin Arena | $ 200,000.00 |
| West Garafaxa | Rea Bridge replacement | $ 517,376.52 |
| West Grey | Police/Fire Station Building Rehabilitation | $ 33,333.00 |
| West Grey | Renovations to the Normanby Arena | $ 66,667.00 |
| West Grey | Construction of Durham Maintenance Depot | $ 500,000.00 |
| West Grey | Replacement of bridge No. 003-193 | $ 681,105.00 |
| West Guilford | Replacement of Pine Lake bridge | $ 228,048.81 |
| West Lincoln | Port Davidson Road Realignment | $ 66,666.00 |
| West Lincoln | Replacement of South Grimsby Road #18 bridge | $ 291,666.00 |
| West Lorne | Construction of the West Lorne Heritage Community Centre | $ 256,954.00 |
| West Perth | St. Andrew Street Reconstruction | $ 404,000.00 |
| West Perth | Development of Mitchell Domestic Landfill Site | $ 1,166,400.00 |
| West Perth (Mitchell) | Herbert Street Pumping Station | $ 62,666.00 |
| Westport | Sewage Pumping Station Upgrades | $ 75,000.00 |
| Westport | Upgrades to the Westport waterworks | $ 50,502.38 |
| Westport | Closure of the Westport waste disposal site | $ 47,775.76 |
| Whitby | Replacement of Polybutylene Service Connections - Doulton Gate | $ 13,333.00 |
| Whitby | Replacement of Polybutylene Service Connections - Fieldview Crescent | $ 26,666.00 |
| Whitby | Replacement of Polybutylene Service Connections - Greenfield Court and Cornwallis Court | $ 100,813.00 |
| Whitby | Replacement of Polybutylene Service Connections - Janedale Court | $ 40,333.00 |
| Whitby | Replacement of Polybutylene Service Connections - Kirby Court | $ 82,173.00 |
| Whitby | Replacement of Polybutylene Service Connections - Labrador Drive | $ 14,880.00 |
| Whitby | Replacement of Polybutylene Service Connections - Lowder Place and Pinehurst Avenue | $ 75,907.00 |
| Whitby | Replacement of Polybutylene Service Connections - Mayflower Street | $ 18,334.00 |
| Whitby | Replacement of Polybutylene Service Connections - Pinehurst Avenue | $ 37,200.00 |
| Whitby | Replacement of Polybutylene Service Connections - Sawdon Drive | $ 18,000.00 |
| Whitby | Replacement of Polybutylene Service Connections - Vanessa Place | $ 44,667.00 |
| Whitby | Replacement of Polybutylene Service Connections - Winston Court | $ 31,334.00 |
| Whitby | New Building to House the Humane Society of Durham Region | $ 697,000.00 |
| Whitby | Replacement of Polybutylene Service Connections - Bassett Boulevard | $ 33,333.00 |
| Whitby | Replacement of Polybutylene Service Connections - Bellwood Drive and Cornwallis Court | $ 28,480.00 |
| Whitby | Replacement of Polybutylene Service Connections - Broughton Court | $ 26,667.00 |
| Whitby | Anne Ottenbrite Pool - Accessibility Improvements | $ 1,166,666.00 |
| Whitchurch-Stouffville | McCowan Road Reconstruction | $ 650,000.00 |
| Whitchurch-Stouffville | Expansion of the Whitchurch-Stouffville Museum Community Centre | $ 1,085,518.00 |
| Whitestone | Hagerman Community Centre Renovations | $ 16,666.00 |
| Whitestone | Reconstruction of Bunny Trail Road | $ 463,061.00 |
| Whitewater Region | Morris Street and Anderson Drive watermain extension | $ 124,070.00 |
| Whitewater Region | Haley Township water distribution system upgrades | $ 181,104.04 |
| Whitney | Algonquin Park's Portage Store Trail | $ 250,000.00 |
| Whitney | Algonquin Road Repairs | $ 350,000.00 |
| Whitney | Reconstruction of Lake Street in the Township of South Algonquin | $ 166,667.00 |
| Whitney | Reconstruction of Post Street | $ 186,226.00 |
| Wiarton | Bluewater Park Rehabilitation | $ 473,548.00 |
| Winchester | Construction of the Winchester Feedermain, pumping station and water meters | $ 2,245,733.00 |
| Windsor | Retention treatment basin | $ 20,000,000.00 |
| Windsor | Walker Road Reconstruction | $ 3,955,555.00 |
| Windsor | Walker/Wyandotte intersection improvements | $ 832,889.00 |
| Windsor | Improvements to Tecumseh Road East | $ 2,800,000.00 |
| Windsor | Jackson Park Renewal | $ 266,667.00 |
| Windsor | Land Servicing - Sandwich South Employment | $ 10,133,333.00 |
| Windsor | Marine Petroleum and Aggregate Handling Terminal | $ 10,123,750.00 |
| Windsor | Parallel Taxiway Construction | $ 2,333,333.00 |
| Windsor | Airport Operations Building Rehabilitation | $ 750,000.00 |
| Windsor | Animal Shelter Expansion, Phases 2 and 3 | $ 266,667.00 |
| Windsor | Bikeways development | $ 133,333.00 |
| Windsor | Central Riverfront Festival Plaza | $ 666,667.00 |
| Windsor | City Centre Streetscape | $ 2,404,666.00 |
| Windsor | Ganatchio Trail Reconstruction | $ 200,000.00 |
| Wingham | Improvements to Josephine Street servicing and streetscape | $ 1,846,185.00 |
| Wingham | Reconstruction of Lower Town Wingham Street | $ 247,900.00 |
| Wolfe Island | Ambulance stations - Township of Frontenac Islands | $ 34,000.00 |
| Wollaston | Rehabilitation of Ridge Road | $ 92,000.00 |
| Woodstock | Turnkey Renovation | $ 233,333.00 |
| Woodstock | Woodstock Agricultural Society Building Rehabilitation/modernization | $ 280,000.00 |
| Woodstock | Old Registry Renovation | $ 366,666.00 |
| Woodstock | Public Works Building Expansion | $ 150,000.00 |
| Woodstock | Construction of the Cowan Park Fieldhouse and Multi-purpose Hall | $ 1,700,000.00 |
| Woodstock | Modification of the Woodstock Art Gallery and Community Arts Centre | $ 1,683,333.00 |
| Woolwich | Line 86 Rehabilitation | $ 525,000.00 |
| Woolwich | Regional Road 22 (Northfield Drive) from Line 86 to Waterloo/Wellington Boundary | $ 780,000.00 |
| Woolwich | Regional Road 23 (Katherine Street) from Cox Creek to Line 86 | $ 355,000.00 |
| Woolwich | Floradale Road Resurfacing and Floradale Bridge Rehabilitation | $ 400,000.00 |
| Wyoming | Lambton County Communications Enhancement | $ 109,648.00 |
| York | Rehabilitation of bus loops | $ 666,666.00 |
| York Region | Bathurst Street Microsurfacing | $ 450,000.00 |
| York, Simcoe, Toronto and Durham Regions | Bridge Repairs - York, Simcoe, Toronto and Durham Regions | $ 1,100,000.00 |
| Zorra | Cobble Hills Road Rehabilitation | $ 230,000.00 |
| Zorra | County Road 6 Rehabilitation | $ 397,100.00 |
| Zorra | Improvements to Road 74 - London to Woodstock Link | $ 576,608.30 |
| Zurich | Renovations to the West Huron Community Centre | $ 345,923.00 |