Phase 1: Infrastructure Projects in Ontario

Clean Water and Wastewater Fund (CWWF) / Public Transit Infrastructure Fund (PTIF)

Project Location Project Title Federal Funding Fund Approved In Progress * Completed
Barrie Specialized Transit Bus Growth 2017 $400,000 PTIF Yes No No
Barrie Conventional Transit Bus Replacement 2018 $1,050,000 PTIF Yes Yes Yes
Barrie Conventional Transit Bus Replacement 2017 $1,050,000 PTIF Yes Yes Yes
Barrie Specialized Transit Bus Replacement 2017 $187,500 PTIF Yes No No
Barrie Conventional Transit Bus Replacement 2016 $1,312,500 PTIF Yes Yes Yes
Belleville On Demand/Flexible Transit System Optimization Study $25,000 PTIF Yes No No
Belleville Transit Facility Expansion to meet ridership demand $1,150,000 PTIF Yes Yes No
Belleville Installation of multiple bus shelters $68,987 PTIF Yes Yes No
Blind River Replace existing garage door $2,020 PTIF Yes Yes No
Blind River Replace existing vehicle with one new accessible bus $50,226 PTIF Yes Yes No
Bradford West Gwillimbury Addition vehicle for growth of service $76,387 PTIF Yes Yes Yes
Brampton Sandalwood Facility Maintenance Expansion $12,450,000 PTIF Yes Yes No
Brampton Expansion and Replacement of Transit Amenities $1,000,000 PTIF Yes Yes No
Brampton Acquisition of Automated Vehicle Monitoring System (AVM) $1,261,000 PTIF Yes Yes No
Brampton Acquisition of 3 Articulated Buses to meet ridership demand $2,100,000 PTIF Yes Yes No
Brampton Implementation of Züm Airport Road rapid transit corridor $9,550,000 PTIF Yes Yes No
Brampton Acquisition of 20 Replacement Buses $6,100,000 PTIF Yes Yes No
Brantford Downtown Transit Terminal Renovations $300,000 PTIF Yes Yes No
Brantford Transit Stop and Shelter Inventory and Condition Assessment $62,500 PTIF Yes Yes No
Brantford Transit stop accessibility improvements $25,000 PTIF Yes Yes No
Brantford Specialized Transit Fleet (Brantford Lift) Expansion $44,609 PTIF Yes Yes No
Brantford Wynarden Court Stairway Replacement $125,000 PTIF Yes No No
Brantford Market Parkade Rehabilitation and Repairs $2,150,000 PTIF Yes Yes No
Brockville Replacement, new bus shelters $10,000 PTIF Yes No No
Brockville Replace Existing Bus $57,900 PTIF Yes Yes Yes
Brockville Active transportation - multi-use trail $174,908 PTIF Yes Yes Yes
Burlington Construction of a concrete sidewalk on John Lucas Drive $240,000 PTIF Yes Yes Yes
Burlington Building Automation System Upgrade $35,000 PTIF Yes Yes No
Burlington New Two Way Radio Command Console $57,500 PTIF Yes Yes No
Burlington Purchase Handivan Expansion Fleet (2 new buses) $200,700 PTIF Yes Yes Yes
Burlington Construction of a concrete sidewalk on the South Service Road $425,000 PTIF Yes Yes Yes
Burlington Downtown Terminal Shelter Upgrade $112,500 PTIF Yes No No
Burlington Construction of Multi-Use Paths - Hydro Corridor $267,500 PTIF Yes Yes No
Burlington Purchase Conventional Expansion Fleet (3 new buses) $769,800 PTIF Yes Yes No
Burlington Elgin Promenade Multi Use Pathway - Phase 3 (John St. to Brant St.) $438,460 PTIF Yes Yes No
Burlington New Transit Workforce Management System Module $112,500 PTIF Yes No No
Burlington Consulting for Transit Master Plan / Mobility Plan / Cycling Plan $175,000 PTIF Yes Yes No
Burlington Project to remove asbestos insulation at Transit Headquarters (HQ) $167,500 PTIF Yes Yes No
Burlington Elgin Promenade - Multi Use Pathway - Phase 2 (Elizabeth St. to John St) $225,000 PTIF Yes Yes No
Burlington Conversion of Bus Bay Lighting to Light-emitting diode (LED) $62,500 PTIF Yes Yes No
Burlington Bus Rapid Transit (BRT) Study - Plains / Fairview Corridor $75,000 PTIF Yes Yes No
Burlington Integrated Bus Arrival Display Signs at Aldershot, Burlington and Appleby GO stations $50,000 PTIF Yes Yes No
Chatham-Kent NextBus integration, by NextBus, for Inter-Urban transit service lines to provide real-time transit information and improved service reliability $50,000 PTIF Yes Yes No
Chatham-Kent Smart-Card Web Service implementation, by Transitfare & Systems, for Chatham-Kent Conventional Transit Services to introduce new technologies and enhance customer service $10,000 PTIF Yes Yes No
Chatham-Kent Smart-Card implementation, by Transitfare & Systems, for Accessible Transit Services to provide improved service reliability $18,000 PTIF Yes Yes No
Chatham-Kent Installation of three (3) new dome-style transit pedestrian shelters, by Mountain Shelter Solutions $27,000 PTIF Yes Yes Yes
Chatham-Kent Heritage Drive and Keil Drive installation of a designated right turn lane along transit route to improve schedule adherence $2,500 PTIF Yes Yes Yes
Chatham-Kent Installation of twenty-seven (27) new solar packages, by Mountain Shelter Solutions at existing transit passenger shelter locations $80,000 PTIF Yes Yes No
Chatham-Kent Installation of transit shelter trash receptacles at twenty (20) locations to provide enhanced customer service, health and safety $10,000 PTIF Yes Yes No
Chatham-Kent Transit service/route extensions including forty-six (46) stop removals and various new stop installations to address ridership demands and route schedule adherence. $5,200 PTIF Yes Yes Yes
Chatham-Kent Opticom Emergency Response installation at eight (8) locations for Public Transit pre-emption $72,650 PTIF Yes Yes No
Chatham-Kent Installation of required concrete works at five (5) transit shelter locations to address accessibility constraints $70,000 PTIF Yes Yes Yes
Chatham-Kent Installation of required concrete works at fifty (50) transit stop locations to improve customer service and security $50,000 PTIF Yes Yes Yes
Chatham-Kent McFarlane Ave. and St. Clair Street installation of a designated right turn lane along transit route to improve schedule adherence $44,000 PTIF Yes Yes Yes
Chatham-Kent Restoration, rehabilitation and upgrades to twelve (12) existing transit passenger shelters, by Mountain Shelter Solutions $70,000 PTIF Yes Yes No
Chatham-Kent Installation of new concrete sidewalk to provide access to new transit shelter location and address accessibility constraints $3,000 PTIF Yes Yes Yes
Chatham-Kent Installation of new concrete sidewalk to provide access and customer safety/security to multiple transit stop locations $90,000 PTIF Yes Yes Yes
Clarence-Rockland Enhancement of existing active transportation infrastructure (Paving pedestrian path) $11,350 PTIF Yes Yes No
Clarence-Rockland Modernization of existing public transit infrastructure (Paving Park-N-Ride lot) $189,351 PTIF Yes No No
Cobourg Purchase of New Paratransit Bus $85,000 PTIF Yes Yes No
Cobourg Purchase of 10 Transit Shelters $32,500 PTIF Yes Yes Yes
Cobourg Purchase of Demand Response Software $45,000 PTIF Yes Yes No
Cochrane Purchase of 1 bus for the implementation of first public transit service $57,793 PTIF Yes Yes No
Collingwood Replace (2) 2006 Eldorado (Unit #700& #702) with new 30' Conventional Low Floor Accessible Buses to enhance service reliability and ridership demands $413,601 PTIF Yes Yes No
Cornwall Replace Three Conventional Buses $771,000 PTIF Yes Yes No
Cornwall Install surveillance cameras on 25 buses for the safety of operators and passengers $88,000 PTIF Yes Yes No
Cornwall Replace Four Specialized Buses $240,000 PTIF Yes Yes Yes
Cornwall Replace One Diesel Fuel Tank and One Waste Oil Tank $228,000 PTIF Yes Yes No
Cornwall Implementation of Specialized Transit Scheduling Software $38,000 PTIF Yes Yes Yes
Cramahe Implement New Scheduling Software/Hardware $6,250 PTIF Yes Yes No
Cramahe Replacement of 1 Specialized Transit Vehicle $32,500 PTIF Yes Yes No
Deseronto Replace an existing vehicle, expand fleet and increase accessibility $60,000 PTIF Yes Yes No
Durham On Board Bus Security Cameras $1,000,000 PTIF Yes Yes No
Durham Detail Design and Critical Utility Relocations for Highway 2 PULSE (Route 900) Curbside BRT Expansion between Glenanna Road and Brock Road in the City of Pickering $500,000 PTIF Yes Yes No
Durham Construction of PULSE Curbside Bus-Only Lanes on Highway 2 between Westney Road and Harwood Avenue $4,475,000 PTIF Yes Yes No
Durham Preparation for Raleigh Garage Facility Expansion $3,725,000 PTIF Yes Yes No
Durham Construction of a cycling lane to support Highway 2 PULSE (Route 900) Bus Rapid Transit (BRT) Expansion between Galea Drive and Lake Ridge Road in Ajax $267,500 PTIF Yes Yes No
Durham Improvements to the North Simcoe Commuter Lot through the installation of a paved surface and lighting. $84,500 PTIF Yes Yes No
Durham Durham Region Transit Specialized Services Fleet Replacements - 8 specialized buses $451,827 PTIF Yes Yes No
Durham Durham Region Transit Mini- Bus Fleet Expansion - 2 mini-buses $112,957 PTIF Yes Yes No
Durham Durham Region Transit Fleet Replacements - 24 conventional buses $5,925,530 PTIF Yes Yes No
Durham Durham Region Transit Fleet Procurement - 4 conventional buses $987,799 PTIF Yes Yes No
Dysart, Dudley, Harcourt, Guilford, Harburn, Bruton, Havelock, Eyre and Clyde Installation of Canopy at Medical centre along Dysart's Special Transit Service Route $27,000 PTIF Yes Yes Yes
Dysart, Dudley, Harcourt, Guilford, Harburn, Bruton, Havelock, Eyre and Clyde Sidewalk accessibility improvements at southeast & southwest corner of Victoria Street & Pine Avenue $25,000 PTIF Yes Yes Yes
Elliot Lake Purchase of Heated Garage for Fleet Storage $133,750 PTIF Yes Yes Yes
Elliot Lake Replace existing Specialized Transit vehicle $106,715 PTIF Yes Yes No
Espanola Replace One Specialized Transit Vehicle $47,551 PTIF Yes Yes No
Fort Erie Install a New Bus Stop Network $129,056 PTIF Yes Yes No
Fort Erie Install On-board Fare Collection and AudioVisual Stop Announcement and Display Technologies on Fleet $20,000 PTIF Yes Yes No
Fort Frances Replacement of one Handivan Bus $46,259 PTIF Yes Yes Yes
Greater Sudbury Paris/Notre Dame Active Transportation Improvements $367,500 PTIF Yes Yes No
Greater Sudbury Route Optimization Study and Service Enhacements $500,000 PTIF Yes Yes No
Greater Sudbury Intelligent Transportation System Study $27,500 PTIF Yes Yes No
Greater Sudbury Accelerated Bus Fleet Rebuild Program $675,000 PTIF Yes Yes No
Greater Sudbury Kingsway Active Transportation Improvements $1,350,000 PTIF Yes Yes No
Greater Sudbury LaSalle Corridor Study $100,000 PTIF Yes Yes No
Greater Sudbury Restoration/Rehabilitation Program of 110 Transit Shelters $60,000 PTIF Yes Yes No
Greater Sudbury Westmount Avenue Active Transportation Improvements $127,500 PTIF Yes Yes No
Greater Sudbury Travel Demand Management Study $27,500 PTIF Yes Yes No
Greater Sudbury Purchase of 5 Expansion Buses $1,454,000 PTIF Yes Yes No
Greater Sudbury Transit Garage upgrades and rehabilitation. $1,850,000 PTIF Yes Yes No
Greater Sudbury Purchase of new transit staff scheduling software $100,000 PTIF Yes Yes No
Greater Sudbury Increase Specialized Transit Fleet $40,000 PTIF Yes Yes No
Greater Sudbury Purchase of new transit vehicle maintenance software $20,000 PTIF Yes Yes No
Greater Sudbury Upgrade to Transit Automatic Vehicle Location Units $100,000 PTIF Yes Yes No
Greater Sudbury Upgrade and rehabilitation to Transit Terminal. $512,500 PTIF Yes Yes No
Greenstone Purchase of one accessible bus to replace a decommissioned bus to meet mobility & accessibility demands. $44,565 PTIF Yes Yes No
Guelph Transit Bus Replacement: 24 conventional buses, 9 specialized vehicles. $7,370,770 PTIF Yes Yes No
Guelph Transit Master Plan Design $147,500 PTIF Yes Yes No
Guelph Transit Bus Stop Upgrades for 132 stops $363,221 PTIF Yes Yes No
Guelph Replacement of 100 Transit Fare Boxes $1,300,000 PTIF Yes Yes No
Guelph Transit/ Traffic Signal System Upgrade $500,000 PTIF Yes Yes No
Halton Hills Purchase of two (2) ActiVan Transit Vehicles $130,283 PTIF Yes Yes No
Hamilton Transit shelter and bus stop rehabilitation including shelter refurbishment, replacement and bus stop pylon upgrades. (Approx. 370 shelters and 2,300 stop locations). Devel of technical guidelines $3,521,700 PTIF Yes Yes No
Hamilton Sustainable transportation/transit connections - sidewalks $1,512,500 PTIF Yes Yes No
Hamilton Vehicle hoist replacements (11) at Mountain Transit Centre $1,512,500 PTIF Yes Yes No
Hamilton Fleet Expansion as per Ten Year Local Transit Strategy, 2017 (5) and 2018 (11) $5,190,000 PTIF Yes Yes No
Hamilton Transit priority measures on A-Line and/or T-Line express routes including queue jump lanes and transit signal priority $1,925,000 PTIF Yes Yes No
Hamilton New transit vehicle wash racks (2) at Mountain Transit Centre $440,000 PTIF Yes Yes No
Hamilton Passenger Information Technology & Software Upgrades $802,500 PTIF Yes Yes No
Hamilton Design, Planning and Site Preparation of New Maintenance & Storage Facility in lower Hamilton $14,325,000 PTIF Yes Yes No
Hamilton 226 Automated Passenger Counters $2,150,000 PTIF Yes Yes No
Hamilton Heating, ventilation and air conditioning (HVAC) upgrades at Mountain Transit Centre $1,100,000 PTIF Yes Yes No
Hamilton Radio System Replacement. Switch from analogue to digital $1,500,000 PTIF Yes Yes No
Hamilton Garage Door replacement (32) at Mountain Transit Centre $660,000 PTIF Yes Yes No
Hamilton End of Line/Hard surface on-street infrastructure and Security measures and interior facility improvements. $1,650,000 PTIF Yes Yes No
Hanover SMART Transit -Provide Scheduling Software and associated hardware to allow for efficient transportation scheduling $5,705 PTIF Yes Yes No
Hanover SMART Transit - Replace existing vehicles (Purchase of 2 passenger Vans that can accommodate up to 9 clients each) $92,500 PTIF Yes Yes No
Huntsville Install Automated Stop Description Device on Buses $4,500 PTIF Yes Yes Yes
Kapuskasing Rehabilitation of one transit bus $15,500 PTIF Yes Yes No
Kapuskasing Purchase one new accessible bus for service expansion $58,147 PTIF Yes Yes No
Kawartha Lakes Design and construction of accessibility conversions for 27 existing bus stops. $50,145 PTIF Yes Yes No
Kawartha Lakes Procurement, installation and implementation 1. Intelligent Scheduling Software for Specialized Transit $75,000 PTIF Yes Yes No
Kawartha Lakes Design and construction of a new transit hub in downtown Lindsay $50,000 PTIF Yes Yes No
Kawartha Lakes Replacement of 18 transit shelters to meet Accessibility for Ontarians with Disabilities Act (AODA) requirements. $54,000 PTIF Yes Yes No
Kenora City of Kenora Construction of New Bus Shelters - 5 Locations $62,500 PTIF Yes Yes Yes
Kenora City of Kenora Replacement of Existing Bus Shelters - 10 Locations $90,000 PTIF Yes Yes Yes
Kingston 2018 Replacement Bus Procurement: Replacement of 8 conventional transit buses (8 x 12m/40ft buses) $1,985,420 PTIF Yes Yes No
Kingston 2019 Replacement Bus Procurement: Replacement of 4 urban transit buses. $940,126 PTIF Yes No No
Kingston 2018 Replacement Bus Procurement: Replacement of 3 conventional transit buses (3 x 12m/40ft buses) $738,862 PTIF Yes Yes No
Kingston On-Board Camera System on Conventional Transit Buses $250,000 PTIF Yes Yes No
Kingston 2016 Expansion Bus Procurement: Expansion of 2 conventional transit buses. $450,000 PTIF Yes Yes Yes
Kingston 2018 Expansion Bus Procurement: The expansion of Kingston Transit fleet by 7 conventional transit buses. $1,956,290 PTIF Yes Yes No
Kingston 2017-2018 Bus Stop Infrastructure Upgrades and Shelter Installation at multiple bus stops $382,726 PTIF Yes Yes No
Kingston 2017 Hoist Installation $89,000 PTIF Yes Yes No
Lanark Computerized dispatch system to manage fleet scheduling. $17,500 PTIF Yes Yes Yes
Lanark Replacement of van $11,737 PTIF Yes Yes Yes
Lanark Accessible van to increase capacity and improve accessibility $45,000 PTIF Yes Yes Yes
Leamington Preparation of Master Transit Plan $34,014 PTIF Yes Yes No
Leamington Oak Street West Sidewalk Extension $65,000 PTIF Yes Yes Yes
London Increased bus replacement program in 2018 to include 7 buses planned for 2019 replacement $2,000,000 PTIF Yes No No
London Installation of 25 (minimum) New Pedestrian Crossings $345,000 PTIF Yes Yes No
London Replacement of current telephone system in use at London Transit $150,000 PTIF Yes Yes No
London Replacement of bus wash infrastructure at Highbury Transit Facility $368,000 PTIF Yes Yes No
London Completion of concrete repair at Wonderland Transit Facility $75,000 PTIF Yes Yes No
London Bicycle Detection Improvements at 4 intersections $50,000 PTIF Yes Yes Yes
London Replacement of existing 8-line wayside transit information signs $195,500 PTIF Yes Yes No
London Replacement batteries for 8 Hybrid buses currently in fleet $372,500 PTIF Yes Yes No
London Replacement of the Autotechnik Joints for 9 articulated buses in the fleet $276,000 PTIF Yes Yes No
London Replace/repair existing perimeter fencing at Highbury Transit Facility $40,000 PTIF Yes Yes No
London Upgrade Automatic Vehicle Location/Communication System utilized at London Transit $121,000 PTIF Yes Yes Yes
London Supply and installation of 35 wayside transit information signs at identified locations across the City $162,500 PTIF Yes Yes No
London Asphalt repairs at both transit facilities $200,000 PTIF Yes Yes No
London Rehabilitate & Upgrade Blackfriars Bridge Active Transportation Components $750,000 PTIF Yes Yes No
London Rehabilitation of Thames Valley Parkway (TVP), South Branch $500,000 PTIF Yes Yes No
London Replacement of the salt storage tent at Highbury Transit Facility $37,500 PTIF Yes Yes No
London Replace security gate infrastructure at Highbury Transit Facility $75,000 PTIF Yes Yes No
London Upgrades to file server and network switching infrastructure in use at the Highbury Transit Facility. $101,500 PTIF Yes Yes No
London Old East Village Shift Rapid Transit Route Parking Lot Improvements $650,000 PTIF Yes Yes No
London Rehabilitation of Thames Valley Parkway (TVP), Main Branch $375,000 PTIF Yes Yes No
London Install Bike Parking Facility (near downtown Bus Rapid Transit Station) $60,000 PTIF Yes Yes No
London Purchase and installation of 72 Automatic Passenger Counters for remainder of bus fleet $287,500 PTIF Yes Yes No
London Replacement of sewage pump infrastructure at the Wonderland Transit Facility $34,500 PTIF Yes Yes No
London Renovation of reception area at Highbury transit facility to provide greater security $11,500 PTIF Yes Yes No
London Complete construction to enclose existing structure at Wonderland transit facility to provide for additional storage $30,000 PTIF Yes Yes No
London Kiwanis Park Pathway Connection $1,050,000 PTIF Yes Yes No
London Upgrade lighting to Light-emiting diodes (LED) at both transit facilities $162,500 PTIF Yes Yes No
London Purchase and installation of closed-circuit monitors for 213 buses $1,992,500 PTIF Yes Yes No
London Retrofit current bus fleet (110 buses) with perimeter seating to increase accessiblity $562,500 PTIF Yes Yes No
London Replacement of (2) hoists at Highbury transit facility $200,000 PTIF Yes Yes No
London Construct Bradley Avenue Extension Transit and Active Transportation Features $250,000 PTIF Yes Yes No
London New Accessible Transit Pads and Sidewalks $1,000,000 PTIF Yes Yes No
London Completion of a Facility needs Assessment and detailed plan for Highbury Transit facility $150,000 PTIF Yes Yes No
London Dundas Place Transit Improvements $1,000,000 PTIF Yes Yes No
London Rehabilitation of Dundas Place $8,000,000 PTIF Yes Yes No
London Replacement Dual Power Invertor Modules for 8 Hybrid buses $200,000 PTIF Yes Yes No
London Installation of 60 Pedestrian Countdown Signal Heads $100,000 PTIF Yes Yes Yes
London Replacement of transmissions for 8 Diesel buses $414,000 PTIF Yes Yes No
London Sidewalk and Bicycle Lane Improvements on the Field Marshall Wolseley Bridge $95,000 PTIF Yes Yes Yes
London Replacement of 10 engines and related ancillary equipment in buses that have surpassed the planned 6 year replacement cycle $450,000 PTIF Yes Yes No
London Feasibility Study for a Downtown Transportation Alliance $75,000 PTIF Yes Yes No
London Neighbourhood Bike Parking Infrastructure Preliminary Concepts Study $25,000 PTIF Yes Yes No
London Replacement of all (25) man doors at Highbury Transit Facility $15,000 PTIF Yes Yes No
London 12 Audible Pedestrian Signal Upgrades $195,000 PTIF Yes Yes Yes
London Upgrade of Fuel Cardlock system at Highbury Transit Facility $57,500 PTIF Yes Yes No
London Upgrade of on-board bus audio/video recording system $175,000 PTIF Yes Yes No
London Shift Rapid Transit Environmental Assessment (EA) / Transit Project Assessment Process (TPAP) $1,500,000 PTIF Yes Yes No
London Rehabilitation of 3 Pedestrian Bridges $300,000 PTIF Yes Yes No
London Increased bus replacement program in 2017 to include 7 buses planned for 2018 replacement $2,000,000 PTIF Yes Yes No
London Separated Bicycle Lane Renewal $645,000 PTIF Yes Yes No
London Shift Rapid Transit Pilot Project & Implementation $7,375,410 PTIF Yes Yes No
London Construct New Downtown Cycle Tracks $875,000 PTIF Yes Yes No
London Byron Baseline and Wonderland Road Sidewalk and Bicycle Facilities $875,000 PTIF Yes Yes No
London Replacement of all 380 bus shelters currently in place in the City of London $1,319,500 PTIF Yes Yes No
Loyalist Installing Five New Bus Shelters $17,216 PTIF Yes Yes No
Loyalist Replacement of One Bus $66,585 PTIF Yes Yes No
Machin Purchase One New Replacement Bus $51,563 PTIF Yes Yes No
Meaford Establishment of 10 Bus Stops $20,352 PTIF Yes Yes No
Meaford Purchase of 1 Accessible Transit Vehicle $35,616 PTIF Yes Yes No
Midland Replacement of One Transit Bus $131,312 PTIF Yes Yes Yes
Milton Procurement of three (3) expansion transit buses to meet increased ridership demand in growth catchment areas. $672,624 PTIF Yes Yes No
Milton Procurement of advanced Automated Vehicle Location / Intelligent Transportation Systems (AVL / ITS), including the procurement of Automated Passenger Counter (APC) systems on 20 transit buses. $53,965 PTIF Yes Yes No
Mississauga Transit Maintenance Management System Replacement $753,327 PTIF Yes No No
Mississauga Installation of 100 additional MiWay Transit Shelters $1,255,550 PTIF Yes Yes No
Mississauga Trail Reconstruction - Max Ward Park $95,572 PTIF Yes Yes No
Mississauga Transit Capital Bus Engine Maintenance on up to 280 buses $1,888,010 PTIF Yes Yes No
Mississauga Lifecycle renewal/replacement of mechanical and electrical upgrades to improve efficiency and to extend system useful life (City Centre Transit Terminal). $1,245,750 PTIF Yes Yes No
Mississauga Purchase of additional Transit Operations Modules - Garage Management & Bus Allocation $286,264 PTIF Yes Yes No
Mississauga Information Technology Project for The Vehicle Communication (VCOM) Radio Infrastructure for Transit iBus Communications $581,569 PTIF Yes Yes No
Mississauga Lifecycle renewal/replacement of building systems to improve efficiency and to extend system useful life (City Centre Transit Terminal). $88,893 PTIF Yes Yes No
Mississauga Trail Reconstruction - Stonewood Park $55,796 PTIF Yes Yes No
Mississauga Pedestrian & Cyclist Access to Mississauga's Transitway & GO Transit Stations $3,757,050 PTIF Yes Yes No
Mississauga Replacement of 500 existing Transit MiWay Stop Signs $50,222 PTIF Yes Yes No
Mississauga Purchase of Transit Performance Metrics Module (HASTUS Analytics)-Runtimes, Ridership and Data Warehouse $200,887 PTIF Yes Yes No
Mississauga New sidewalks to transit stations $318,619 PTIF Yes Yes Yes
Mississauga Waterfront Trail Improvements and trail reconstruction - Signage, trail markers, trail user-count technology and minor trail reconstructions $246,415 PTIF Yes Yes No
Mississauga Information Technology Project for Wireless Infrastructure for Transit and Transit Rider Broadband Connectivity $150,665 PTIF Yes Yes No
Mississauga Transit Capital Bus Maintenance - Major Component Rehabilitation/Replacement on up to 280 buses. $3,610,950 PTIF Yes Yes No
Mississauga Lifecycle renewal/replacement of exterior door to extend the useful life (Edward J. Dowling Transit Facility) $19,084 PTIF Yes Yes No
Mississauga Trail Reconstruction -Crawford Green Park $41,985 PTIF Yes No No
Mississauga Installation of tactile plates at pedestrian crossings to meet Accessibility for Ontarians with Disabilities Act requirements. $2,124,130 PTIF Yes Yes Yes
Mississauga Trail Reconstruction - Huron Heights $116,565 PTIF Yes No No
Mississauga Information Technology Project for Switches and Routers for Transit and Traffic Voice and Data Communications to Support the New Network Fiber Design Required for the Advanced Transportation Managemen $225,998 PTIF Yes Yes No
Mississauga Building expansion to accommodate future growth and life cycle renewal (Malton Satellite Terminal) $419,854 PTIF Yes Yes No
Mississauga Acquisition of new Intelligent Transportation System (ITS) equipment (i.e. Closed-Circuit Television, detection devices) $39,824 PTIF Yes Yes No
Mississauga Study for Anchor Terminals at Strategic locations across the City $251,109 PTIF Yes No No
Mississauga Transit Bus Seat Modification on 84 buses $753,327 PTIF Yes Yes No
Mississauga Mississauga Cycling Master Plan Update $53,103 PTIF Yes Yes No
Mississauga Etobicoke Creek Trail reconstruction - trail resurfacing, signage, trail markers and trail user-count technology $1,135,010 PTIF Yes Yes No
Mississauga Replacement of Asphalt with concrete Transit Bus Landing Pads at 75 high traffic bus stops $502,218 PTIF Yes Yes No
Mississauga Bus Communication Gateway Replacement on all MiWay Fleet $1,506,650 PTIF Yes Yes No
Mississauga Transit Facility Repairs (Minor) $70,310 PTIF Yes Yes No
Mississauga Trail Reconstruction - Quenippenon Meadows Park $62,426 PTIF Yes Yes No
Mississauga Refurbishment of 250 existing bus stops pads to increase accessibility $140,621 PTIF Yes Yes No
Mississauga Information Technology Project for Network Fiber Design and Construction for Transit and Traffic Site Connectivity to Build 100 New Nodes in Support of Advanced Transportation Management System (ATMS) $571,524 PTIF Yes Yes Yes
Mississauga Transportation Master Plan Study $132,755 PTIF Yes Yes No
Mississauga Lakeshore Road Transportation Master Plan $132,755 PTIF Yes Yes No
Mississauga Trail Reconstruction - South Common Park $128,502 PTIF Yes No No
Mississauga Acquisition of new traffic signal equipment enhancements (i.e. Accessible Pedestrian Signals and Pedestrian Countdown Signals) $79,652 PTIF Yes Yes No
Mississauga Conduct Detailed Safety Assessments for all at-grade railway crossings $53,103 PTIF Yes Yes No
Mississauga Trail Reconstruction - Pheasant Run Park $96,677 PTIF Yes No No
Mississauga Replacement of traffic controllers/cabinets $100,894 PTIF Yes Yes No
Mississauga Enhancement of Pavement Entranceways and Exterior bays at 9 Terminals $100,444 PTIF Yes Yes Yes
Mississauga Installation of additional 250 Accessible MiWay Bus Pads $136,603 PTIF Yes Yes No
Mississauga Trail Reconstruction - Garnetwood Park $152,473 PTIF Yes Yes No
Mississauga Lifecycle renewal/replacement of building systems to improve efficiency and to extend system useful life (Edward J. Dowling Transit Facility). $1,686,200 PTIF Yes Yes No
Mississauga Refurbishment of 2 existing Transit Mini Terminals for optimization of Transit Infrastructure. $100,444 PTIF Yes Yes No
Mississauga Construction of Multi-Use Trails along the Hanlan Water Project $329,240 PTIF Yes Yes No
Mississauga Construction of New Transit Operator Facility (Mount Charles Park) $502,218 PTIF Yes Yes No
Mississauga Acquisition of up to 10 new transit buses to increase Service Hours $2,923,220 PTIF Yes Yes No
Mississauga Acquisition of up to 3 new transit buses to increase service and ridership $131,145 PTIF Yes Yes Yes
Mississauga Acquisition of up to 51 - 40 foot buses to replace aging buses $14,776,000 PTIF Yes Yes No
Mississauga Acquisition of up to 29 - 60 foot buses to replace aging buses. $13,855,100 PTIF Yes Yes No
Mississauga Transit Route Supervisor Vehicle Acquisitions - 1 Replacement $17,578 PTIF Yes Yes No
Mississauga Transit Service Truck Acquisitions - 1 Replacement $42,688 PTIF Yes Yes Yes
Mississauga Transit Maintenance Vehicles - 1 Replacement $12,556 PTIF Yes Yes No
Mississauga Acquition of 5 new Transit Change-Off Electric Vehicles $145,643 PTIF Yes Yes Yes
Mississauga Transit Route Security Vehicles & Equipment - 1 Replacement $20,089 PTIF Yes Yes No
Mississauga Replacement of 6 Transit Change-Off Electric Vehicles $40,177 PTIF Yes Yes No
Niagara The purchase of computer aided dispatch / automated vehicle location (CAD/AVL) equipment for the 2 existing Inter-municipal Transit buses operated by the City of Welland on behalf of Niagara Region. $35,989 PTIF Yes Yes No
Niagara The purchase of computer aided dispatch / automated vehicle location (CAD/AVL) equipment for the 3 existing Inter-municipalTransit buses operated by City of Niagara Falls on behalf of Niagara Region $53,983 PTIF Yes Yes Yes
Niagara Purchase of one new 40’ bus to be utilized by Welland Transit to deliver Niagara Region's Inter-municipal Transit service. $254,171 PTIF Yes Yes No
Niagara Falls Bus Way & Shelter Rehabilitation and Platform upgrades at Lundy's Lane and Morrison/Dorchester Transit Hubs $228,960 PTIF Yes Yes No
Niagara Falls Upgrade of fluid tracking system for all Niagara Falls Transit buses $14,246 PTIF Yes Yes No
Niagara Falls Upgrade Radio System and Control Station Requirements at WEGO building $6,614 PTIF Yes Yes No
Niagara Falls Electronic Farebox Upgrade for 7 (seven) Chair-A-Van to meet Accessibility for Ontarians with Disabilities Act (AODA) requirements $71,232 PTIF Yes Yes No
Niagara Falls Replace refrigerant recover, recycle and recharge machine in maintenance facility $3,562 PTIF Yes Yes Yes
Niagara Falls Installation of Emco-Wheaton posi-lock fuelling system on 46 (forty-six) buses. $14,246 PTIF Yes Yes No
Niagara Falls Purchase of new software and hardware to better manage daily bus schedules and payroll $35,616 PTIF Yes Yes No
Niagara Falls Upgrade to 18 Fareboxes for Niagara Falls Transit $102,121 PTIF Yes Yes No
Niagara Falls Replacement of 6 (six) Cummins ISL diesel engines that have surpassed life expectancy (500,000 km) $122,112 PTIF Yes Yes No
Niagara Falls Radio Upgrade and Replacement for seven (7) vans for Chair-A-Van $6,869 PTIF Yes Yes No
Niagara Falls Purchase of new scheduling software for Para-Transit service $27,984 PTIF Yes Yes Yes
Niagara Falls Installation of Intelligent Transportation Management Systems to enhance tracking and customer service interface and communications to passengers for the Niagara Falls Transit Fleet $382,618 PTIF Yes Yes No
Niagara Falls Purchase of Fleet Management Software to support the asset management capacity of the Niagara Falls Transit system. $30,528 PTIF Yes Yes Yes
Niagara Falls Vinyl decal replacement for 6 (six) Orion VII buses $18,317 PTIF Yes Yes No
Niagara Falls Purchase of ZF Transmission Diagnostic Software for buses $3,053 PTIF Yes Yes Yes
Niagara Falls Orion VII Powertrain and body refurbishments to extend life expectancy of two (2) buses $228,960 PTIF Yes Yes No
Niagara Falls Addition of 6 new growth vehicles to meet ridership demand. $2,035,200 PTIF Yes Yes No
Niagara Falls Addition of 2 replacement vehicles to replace older assets. $70,871 PTIF Yes Yes Yes
Niagara-on-the-Lake Install Integrated On-Board Annunciator, GPS, and Electronic Fare Card System to increase efficiency and meet accessibility requirements $25,000 PTIF Yes Yes No
Niagara-on-the-Lake Improvements to 26 Bus Stops and Installation of up to 8 new stops on expanded transit route to meet accessibility requriements $47,610 PTIF Yes Yes No
Norfolk Improvements to approximately 26 bus stops $58,000 PTIF Yes No No
North Bay Installing digital signage at approximately 10 bus stops and transfer locations $75,000 PTIF Yes Yes No
North Bay Various improvements to the Transit Vehicle Wash Facility $50,000 PTIF Yes Yes No
North Bay Installation of electronic fare box system $375,000 PTIF Yes Yes No
North Bay Replace an existing parabus and purchase one additional parabus to the fleet $60,000 PTIF Yes Yes No
North Bay Installation of security cameras on all transit fleet vehicles $88,000 PTIF Yes No No
North Bay Installing traffic light pre-emption system on all transit fleet vehicles $87,500 PTIF Yes Yes No
North Bay Introduction of passenger counters on all transit fleet vehicles $75,000 PTIF Yes Yes No
North Bay Installation of sidewalks for improved bus stop access. $125,000 PTIF Yes Yes Yes
North Bay Enhancing the accessibility of all bus stops $50,000 PTIF Yes Yes No
North Bay Installation of 10 new bus shelters $50,000 PTIF Yes Yes No
North Bay Enhancing Hoist System at Fleet Maintenance Garage $60,000 PTIF Yes Yes Yes
North Bay Various improvements to the Transit Vehicle Storage Facility $125,000 PTIF Yes Yes No
Oakville Purchase and Installation of a new Specialized Transit Scheduling Software $170,000 PTIF Yes Yes No
Oakville Completing the installation of the new Transit Information and Communication System $140,000 PTIF Yes Yes No
Oakville Addition of 8 new 30 foot growth buses to meet conventional ridership demand $2,126,430 PTIF Yes Yes No
Oakville Installation of 80 new Garbage Receptacles at Transit pedestrian shelters to meet needs of customers $40,000 PTIF Yes Yes No
Oakville Installation of digital signage at Bus shelters at the Hospital $45,000 PTIF Yes Yes No
Oakville Addition of two accessible growth vehicles to meet specialized transit ridership demand $260,000 PTIF Yes Yes No
Oakville Addition of 5 Security Cameras at high traffic or vulnerable locations $12,500 PTIF Yes Yes No
Oakville Installation of Bike Lockers and Bike Racks at the Uptown Core Terminal and Bus Shelters $17,500 PTIF Yes Yes No
Oakville Construction of a Multi-Use Trail on North Service Road $400,000 PTIF Yes No No
Oakville Strategic Review of Specialized Transit Service to meet accessibility needs $75,000 PTIF Yes Yes No
Oakville Replacement of 17 Transit pedestrian shelters at end of useful life $96,000 PTIF Yes Yes No
Oakville Installation of Accessibility improvements at bus service stops $100,000 PTIF Yes Yes No
Oakville Purchase and installation of a an Automatic Vehicle Monitoring System $225,000 PTIF Yes No No
Oakville Refurbishment of 15 2009 Buses to achieve optimal life expectancy $1,200,000 PTIF Yes Yes No
Oakville Installation of 25 new Transit pedestrian shelters to support Transit service $75,000 PTIF Yes Yes No
Orangeville Replace existing buses which have reached the end of their service life with 3 new low floor fully accessible buses meeting Accessibility for Ontarians with Disabilities Act (AODA) standards $225,482 PTIF Yes Yes No
Orillia Purchase of 5 Accessibilty for Ontarians with Disabilities Act (AODA) required automatic stop announcement systems for Customer Service Initiatives $19,958 PTIF Yes Yes No
Orillia Purchase of 5 Low Floor 40 ft Diesel Buses for Customer Service Initiatives $1,237,570 PTIF Yes Yes No
Ottawa Accessibility for Ontarians with Disabilities Act (AODA) Enhancements of Intersections $1,500,000 PTIF Yes Yes No
Ottawa Trillium Pathway extension phase 3 (Carling to Dows Lake) $275,000 PTIF Yes Yes No
Ottawa Richmond Rd - south side sidewalk reconstruction around Croydon for cycle track $550,000 PTIF Yes Yes Yes
Ottawa Rideau River Crossing - Confederation Heights to Carleton University - pedestrian/cycling $775,000 PTIF Yes Yes No
Ottawa Kanata Light Rail Transit ( Stage 2- LRT) Extension - Environmental Assessment $1,500,000 PTIF Yes Yes No
Ottawa Passenger information displays $1,000,000 PTIF Yes Yes No
Ottawa Transit Priority Projects $4,350,000 PTIF Yes Yes No
Ottawa OC Transpo - Merivale Garage - Driver facility and elevator $750,000 PTIF Yes Yes No
Ottawa Carleton Siding - Spring switch replacement with new powered switches $1,250,000 PTIF Yes Yes Yes
Ottawa Sidewalk Renewal (misc locations) $1,750,000 PTIF Yes Yes Yes
Ottawa Booth Street Bike Track from Sir John A MacDonald to Albert $1,000,000 PTIF Yes Yes No
Ottawa Rideau River Pathway - lighting and link through park $625,000 PTIF Yes Yes Yes
Ottawa Kanata North cycle link (Carling at March Rd) $400,000 PTIF Yes Yes No
Ottawa Walkley rail intersection track improvements $5,500,000 PTIF Yes Yes No
Ottawa Multi-Use Pathway Renewal (misc locations) $2,150,000 PTIF Yes Yes Yes
Ottawa Cost sharing for improvements of cycling and pedestrian links at Ministry of Transportation Ontario (MTO) overpasses $1,000,000 PTIF Yes Yes No
Ottawa Queen Elizabeth Drive - Crossings at Commissioner's Park and at Queen Elizabeth Place - pedestrian/cycling $375,000 PTIF Yes Yes No
Ottawa Heron Road (Data Centre/Heron Station to Bank), EB and WB bike tracks $325,000 PTIF Yes Yes No
Ottawa Emergency phone upgrades at Transitway stations $1,000,000 PTIF Yes Yes No
Ottawa LRT Stage 2 - Bridge to grade separate VIA/O-Train Elwood diamond $1,250,000 PTIF Yes Yes No
Ottawa Acquisition of 2 train sets $20,000,000 PTIF Yes Yes No
Ottawa Hunt Club Cycling Links (Riverside to Paul Benoit) $275,000 PTIF Yes Yes No
Ottawa Rural bus stop improvements $200,000 PTIF Yes Yes No
Ottawa Heron Rd (Colbert Pathway to east of Jefferson)-EB bike tracks only $275,000 PTIF Yes Yes Yes
Ottawa Rideau River Crossing - Bank at Riverside (near Billings Bridge), pedestrian/cycling $1,025,000 PTIF Yes Yes No
Ottawa Transit operator crew room at Bayview station $750,000 PTIF Yes Yes No
Ottawa Modern signalling and control system for O-Train Trillium Line $1,000,000 PTIF Yes Yes No
Ottawa New sidewalk links to improve connections with public transit $775,000 PTIF Yes Yes Yes
Ottawa Bus shelters $375,000 PTIF Yes Yes No
Ottawa McArthur Street Bike Lane $175,000 PTIF Yes Yes No
Ottawa Bicycle shelters at Transitway stations to encourage multimodal travel $75,000 PTIF Yes Yes No
Ottawa Baseline Transit Corridor - Bayshore to Billings- Design $6,000,000 PTIF Yes Yes No
Ottawa Pave rural park and ride lots $1,250,000 PTIF Yes Yes Yes
Ottawa Rural cycling routes (misc locations) $2,025,000 PTIF Yes Yes Yes
Ottawa LRT Stage 2 - Early works and preliminary engineering $45,000,000 PTIF Yes Yes No
Ottawa Trans Orleans Pathway alignment modification $500,000 PTIF Yes Yes Yes
Ottawa Customer waiting areas at major Confederation Line stations $1,000,000 PTIF Yes Yes No
Ottawa Smartbus infrastructure on board buses $2,250,000 PTIF Yes Yes No
Ottawa Fare gate entrances at Transitway stations $875,000 PTIF Yes Yes No
Ottawa Advanced Renewal Projects Supporting LRT Stage 2 $1,550,000 PTIF Yes Yes No
Ottawa Rideau Canal Crossing (Fifth to Clegg) $10,500,000 PTIF Yes Yes No
Ottawa Enclosed bicycle parking areas at Transitway stations to encourage multimodal travel $250,000 PTIF Yes No No
Ottawa Elevator at Tremblay station $500,000 PTIF Yes Yes No
Ottawa Acquisition of 17 new buses $6,800,000 PTIF Yes Yes Yes
Ottawa Mann Avenue Transit Structure Replacement $2,500,000 PTIF Yes Yes No
Ottawa Manotick - MUP between Main St and River rd and addition of MUP to two bridges $600,000 PTIF Yes Yes No
Ottawa Kanata North cycle link (Herzberg at March Rd) $525,000 PTIF Yes Yes No
Ottawa Aboriginal consultation (including other transit and active transportation projects) $100,000 PTIF Yes Yes No
Ottawa Tunneys Pasture Bus Loop $1,500,000 PTIF Yes Yes No
Ottawa TDM (Bus detours) during LRT construction $15,000,000 PTIF Yes Yes No
Ottawa Cardinal Creek Park 18A multiuse pathway $650,000 PTIF Yes Yes No
Ottawa Concrete bus pads $175,000 PTIF Yes Yes No
Ottawa Transitway (Busway) Pavement Resurfacing $1,500,000 PTIF Yes Yes Yes
Ottawa Chapman Mills transit corridor - Beatrice to Longfields $1,500,000 PTIF Yes Yes Yes
Ottawa Multi-Use Pathway (Michael St. to St. Laurent) $100,000 PTIF Yes Yes No
Ottawa Pinecrest Garage, localized bus bay concrete repairs, sidewalks and asphalt replacement $750,000 PTIF Yes Yes No
Owen Sound General Transit Terminal Repairs (signs, brickworks, flooring and benches) $25,000 PTIF Yes Yes No
Owen Sound Roof Replacement at Transit Terminal $30,000 PTIF Yes Yes No
Owen Sound Installation of 20 new Bus Shelters with accessible signage and sidewalk connectors $155,000 PTIF Yes Yes No
Owen Sound Replacement of Exterior Walkway & Curbing at Transit Terminal $30,000 PTIF Yes Yes Yes
Owen Sound Heating, Ventilation and Air Conditioning (HVAC) - Replacement in Transit Terminal $15,000 PTIF Yes Yes Yes
Owen Sound Accessibility Upgrades in Transit Terminal $7,500 PTIF Yes Yes No
Penetanguishene Public Access Extension for Designated Bus Stops $50,000 PTIF Yes Yes Yes
Perth East Purchase one Specialized Passenger Bus to replace existing bus $55,000 PTIF Yes Yes No
Perth East Cross-Walk Upgrades at transit pickup stops to improve safety and accessibility $13,485 PTIF Yes Yes No
Peterborough Transit Stop Shelter Upgrades of up to 150 new accessible transit stops and amenities $813,893 PTIF Yes Yes No
Peterborough Transit Storage Garage Replacement Study $450,000 PTIF Yes Yes No
Peterborough Accessible Transit Stop Upgrades of up to 10-12 new accessible transit stops $50,000 PTIF Yes Yes No
Peterborough Construction of a new Transit Maintenance Garage & Public Works Yard $1,000,000 PTIF Yes Yes No
Peterborough Transit Intelligent Transportation System Enhancements to provide real time passenger information $100,000 PTIF Yes No No
Peterborough Replace 9 conventional transit buses with new accessible and efficient buses, as part of the Transit Bus Replacement Program $2,650,000 PTIF Yes Yes No
Peterborough Replace 5 and purchase 1 new accessible specialized transit buses, as part of the Specialized Transit Bus Replacement Program $337,500 PTIF Yes Yes No
Peterborough Replace one accessible Caremobile Van $50,398 PTIF Yes Yes No
Port Colborne Promenade Improvements on West St south of Clarence St $24,000 PTIF Yes Yes Yes
Port Colborne Trail Signage Replacements/Improvements/new signage at various locations $15,000 PTIF Yes Yes Yes
Port Colborne Trail Entrance Point Improvements at various locations $15,000 PTIF Yes Yes Yes
Port Colborne Restoration of Sidewalk to bus stop at Vale Centre $10,000 PTIF Yes Yes Yes
Port Colborne Restoration of trail from Omer Ave to Weir Road $7,500 PTIF Yes Yes Yes
Port Colborne Restoration of the internal trail system at Thomas A. Lanna Sports Complex (Vale Centre) $15,000 PTIF Yes Yes Yes
Port Colborne Restoration of trail from Robin Hood Mill north to Dain City $10,000 PTIF Yes Yes Yes
Port Hope New Vehicle Purchase and one replacement vehicle purchase $148,000 PTIF Yes Yes No
Prince Edward County Business Case for Public Transit for Prince Edward County $22,896 PTIF Yes Yes No
Quinte West Design and Planning of a new office and vehicle storage space for Quinte Access Transportation $56,166 PTIF Yes Yes Yes
Quinte West Purchase of 2 new specialized buses to improve service reliability and accessibility needs, and meet ridership demand $113,775 PTIF Yes Yes No
Renfrew Replace existing accessible van $29,000 PTIF Yes No No
Renfrew Upgrade the dispatch centre's base communication system to enhance the coordination of the fleet of specialized transit vehicles. $1,655 PTIF Yes Yes No
Renfrew Replace existing accessible bus $75,000 PTIF Yes Yes No
Renfrew Acquisition of tire changer and balancer to enhance fleet maintenance. $5,000 PTIF Yes Yes No
Russell Resurfacing of the park and ride $28,824 PTIF Yes Yes No
Russell Install Wi-Fi and GPS services to our four buses to improve service reliability. $2,500 PTIF Yes Yes No
Russell Transit Feasibility Study $25,000 PTIF Yes Yes No
Russell Relocating and resurfacing park and ride, Relocating bus shelter $28,926 PTIF Yes Yes No
Sarnia Installation of an accessible transit scheduling software $51,948 PTIF Yes Yes No
Sarnia Purchase of two low floor Nova Buses $498,000 PTIF Yes Yes No
Sarnia Installation of a new fuel storage tank to refuel buses $50,000 PTIF Yes Yes No
Sarnia Stop pads and bus stop shelters $200,000 PTIF Yes Yes Yes
Sarnia Purchase of two accessible buses (Care A Vans) $115,000 PTIF Yes Yes No
Sarnia Bus facility Upgrades $67,160 PTIF Yes Yes No
Sarnia Installation of cameras in all buses, 6 cameras per bus to be installed in 29 buses for a total of 174 cameras. $88,500 PTIF Yes Yes No
Sarnia Purchase of eight low floor ARBOC Speciality Cutaway buses $666,000 PTIF Yes Yes No
Sault Ste. Marie Review Conventional Transit System to Identify Opportunities for Redesign $55,000 PTIF Yes Yes No
Sault Ste. Marie Replace Existing Radio System on Buses and Transit Vehicles $19,000 PTIF Yes Yes No
Sault Ste. Marie Purchase and Installation of Surveillance Cameras on Parabus Fleet $25,000 PTIF Yes Yes No
Sault Ste. Marie Replace Existing four (4) Parabuses $190,000 PTIF Yes Yes No
Sault Ste. Marie Restoration of Four (4) Sault Transit Pedestrian Shelters $10,000 PTIF Yes Yes No
St. Catharines Purchase three Paratransit buses to replace existing vehicles for Paratransit service $270,000 PTIF Yes Yes No
St. Catharines Install automatic vehicle monitoring on all conventional vehicles $200,000 PTIF Yes Yes Yes
St. Catharines Replace top coat of asphalt at bus terminal bay $35,000 PTIF Yes Yes Yes
St. Catharines Purchase and install new emergency generator for maintenance facility and garage $175,000 PTIF Yes Yes No
St. Catharines Replacement of automatic gates at maintenance facility $50,000 PTIF Yes Yes No
St. Catharines Purchase automated driver management and timekeeping system $125,000 PTIF Yes Yes No
St. Catharines Conventional service fleet expansion (4 new forty foot buses) to accommodate future growth and improve spare ratio of fleet $1,240,000 PTIF Yes Yes No
St. Catharines Install automatic passenger counting on all 70 of our conventional vehicles $360,000 PTIF Yes Yes Yes
St. Catharines Purchase one Paravan to replace existing Paravan vehicle $50,000 PTIF Yes Yes No
St. Catharines Remove four underground tanks for transmission fluid, waste oil, paint and engine oil, and replace with three aboveground tanks $75,000 PTIF Yes Yes No
St. Catharines Purchase a service truck to replace maintenance service truck $90,000 PTIF Yes Yes Yes
St. Catharines Retrofit four buses to address wheelchair restraints on conventional buses $42,500 PTIF Yes Yes No
St. Catharines Install computer aided dispatch (CAD) modems on all existing Paratransit vehicles $31,000 PTIF Yes Yes No
St. Catharines Purchase and install CleverWorks system to enhance accuracy of real-time bus information $155,000 PTIF Yes Yes Yes
St. Catharines Upgrade access control system for bus terminal and maintenance facility $110,000 PTIF Yes Yes Yes
St. Catharines Restoration of multiple bus shelters $300,000 PTIF Yes Yes No
St. Catharines Expand maintenance facility to install an additional hoist to do bus maintenance work $1,300,000 PTIF Yes Yes No
St. Catharines Purchase one Paratransit bus to accommodate increased demand $120,000 PTIF Yes Yes No
St. Catharines Replace a bus wash system with a new system $100,000 PTIF Yes Yes No
St. Catharines Purchase three 60' buses and nine 40' buses to replace existing vehicles for conventional service $3,850,000 PTIF Yes Yes No
St. Catharines Upgrade video camera system at maintenance facility and Downtown Terminal for buses $50,000 PTIF Yes Yes Yes
St. Marys Accessibility Improvements to Sidewalks $67,500 PTIF Yes Yes No
St. Thomas Improving visibility of transit signage $25,000 PTIF Yes Yes No
St. Thomas Accessible transit fleet replacement $300,000 PTIF Yes Yes No
St. Thomas Installation of safety lighting at various transit shelters $20,000 PTIF Yes Yes No
St. Thomas Installation of transit Shelters $50,000 PTIF Yes Yes No
Stratford Creation of new functional transit terminal $529,816 PTIF Yes No No
Stratford Replacement of two existing buses $529,816 PTIF Yes Yes No
Tecumseh Purchase a low floor accessible community transit bus to replace an existing transit bus with a low floor accessible bus $94,584 PTIF Yes Yes Yes
Temiskaming Shores Purchase two buses to replace two existing buses to meet ridership demands $257,955 PTIF Yes Yes No
Thorold Installation of a new bus layby, 2 bus shelters and new sidewalk with a stopping complex on Towpath $214,008 PTIF Yes Yes No
Thorold Remediation of Transit Parking Lot at Transit Terminal to improve accessibility. $75,000 PTIF Yes No No
Thorold Sidewalk Extension for Transit at six (6) locations $75,000 PTIF Yes Yes Yes
Thorold Installation of new bus laybys and bus shelters at seven bus stops $157,500 PTIF Yes Yes No
Thorold Installation of six New Bus Shelters at various bus stops $31,400 PTIF Yes No No
Thorold Installation of 10 new concrete pads with accessible markings at multiple bus locations for Improved Accessibility at Bus Stops $46,000 PTIF Yes Yes Yes
Thorold Repair of six existing Bus/pedestrian shelters $28,000 PTIF Yes No No
Thunder Bay Installation of New Bike Racks for Business $10,000 PTIF Yes Yes Yes
Thunder Bay Accessible Bus Stop Improvements & Shelter Upgrades at multiple bus stops $170,000 PTIF Yes Yes No
Thunder Bay Rehabilitation and upgrading to City Hall Transit Hub infrastructure $200,000 PTIF Yes Yes No
Thunder Bay Construction of Pedestrian Crossover $50,000 PTIF Yes Yes Yes
Thunder Bay Replacement of Fixed-Route Staff Scheduling Software $125,000 PTIF Yes No No
Thunder Bay Frederica Street Active Living Corridor - Sidewalk Connection $27,000 PTIF Yes Yes Yes
Thunder Bay Construction of New Bike Lane $55,000 PTIF Yes Yes Yes
Thunder Bay Design of McVicar Creek Trail $10,000 PTIF Yes Yes No
Thunder Bay Replacement/Updating of Bus Stop Signage& Route Wayfinding Signage $60,000 PTIF Yes Yes No
Thunder Bay Enhanced Pedestrian Walkway on Arthur St. $55,000 PTIF Yes Yes Yes
Thunder Bay Purchase of new Fleet Training Driving Simulator $175,000 PTIF Yes Yes No
Thunder Bay Transit Fleet Renewal - Accelerated replacement of Conventional & Specialized Transit Buses $3,780,000 PTIF Yes Yes No
Thunder Bay Smart Card Electronic Fare Technology Feasibility Study (Phase I) $65,000 PTIF Yes No No
Thunder Bay Windsor Street Active Living Corridor - Sidewalk Connection $103,250 PTIF Yes Yes Yes
Thunder Bay Replacement of Transit Bus Hoist $110,000 PTIF Yes Yes No
Thunder Bay Study for New Centralized Transit Terminal & Route Network Implementation (Phase I) $150,000 PTIF Yes Yes No
Thunder Bay Pedestrian Wayfinding Signage $100,000 PTIF Yes Yes Yes
Thunder Bay Wardrope Active Transportation Trail $225,000 PTIF Yes Yes Yes
Thunder Bay Transit Facility Capital - Parking Lot /Lighting/ Building upgrades $314,000 PTIF Yes Yes No
Thunder Bay Construction of Pedestrian Crossover $25,000 PTIF Yes Yes Yes
Thunder Bay Bulk Fuel Tank Depot $225,000 PTIF Yes No No
Timmins Purchase one new service truck $37,500 PTIF Yes Yes Yes
Timmins Install nineteen (19) Passenger Counters to conventional buses. $40,000 PTIF Yes Yes No
Timmins Purchase two specialized Vehicle $115,000 PTIF Yes Yes No
Timmins Purchase two 40' NOVA LFS accessible buses $540,000 PTIF Yes Yes No
Timmins Replace Windows and Doors at Transit Terminal $50,000 PTIF Yes Yes No
Timmins Transit Terminal Repairs $75,000 PTIF Yes Yes No
Timmins Upgrade Fare Collection System $62,500 PTIF Yes Yes No
Timmins Resurface Front Parking Lot at Transit Garage $70,000 PTIF Yes Yes No
Timmins Upgrade and install new shelters $15,000 PTIF Yes Yes No
Timmins Construct a new Body Shop to garage $150,000 PTIF Yes Yes No
Timmins Refurbish two conventional Buses $80,000 PTIF Yes Yes No
Timmins Install 100 new retro-reflective Bus Stop Signs $5,000 PTIF Yes Yes No
Timmins Upgrade Automated Stops System/Automated Vehicle Location (AVL) System to improve real time bus information $172,500 PTIF Yes Yes No
Toronto Missing sidewalk links - 2018 Road Safety Plan $250,000 PTIF Yes No No
Toronto Finch West LRT Early Works $25,000,000 PTIF Yes Yes No
Toronto Subway Workcars $14,670,000 PTIF Yes Yes No
Toronto SmartTrack & Eglinton West Light Rail Transit Planning and Design $35,500,000 PTIF Yes Yes No
Toronto Bus Hoists $1,910,000 PTIF Yes Yes No
Toronto East Don Trail $11,250,000 PTIF Yes Yes No
Toronto T1 Subway Cars - 20 Year Overhaul $11,852,500 PTIF Yes Yes No
Toronto New mid-block crossings to transit stops $1,500,000 PTIF Yes Yes No
Toronto Life Extension Overhaul of 30 Articulated Light Rail Vehicles (ALRVs) $8,655,000 PTIF Yes Yes No
Toronto Enterprise Asset Management $22,985,200 PTIF Yes Yes No
Toronto 400 Wheel-Trans Buses $10,734,500 PTIF Yes Yes No
Toronto Sidewalk extensions for accessibility $75,000 PTIF Yes Yes No
Toronto Signalized Crossings for Cyclists $90,000 PTIF Yes Yes No
Toronto Reconstruction of Streetcar Overhead $7,719,000 PTIF Yes Yes No
Toronto Transit Signal Priority System Renewal $50,000 PTIF Yes Yes No
Toronto Bridges/Structures Maintenance $6,744,000 PTIF Yes Yes No
Toronto Increase Crossing Times - Modification of signals and timings $115,000 PTIF Yes Yes No
Toronto Platform Modifications to Accommodate Articulated Buses $10,000,000 PTIF Yes Yes No
Toronto Accessible Pedestrian Signals Expansion $1,200,000 PTIF Yes Yes No
Toronto Subway Pump Replacement Program $4,972,500 PTIF Yes Yes No
Toronto Bus Washracks $5,055,500 PTIF Yes Yes Yes
Toronto Scarborough Subway Extension Planning and Design $125,000 PTIF Yes Yes No
Toronto Structure Rehabilitation Program $12,719,000 PTIF Yes Yes No
Toronto Reduced Crossing Distance - Curb extensions/neckdowns $90,000 PTIF Yes Yes No
Toronto Roofing Rehabilitation Program $13,309,500 PTIF Yes Yes No
Toronto Geometric Safety Improvements - Removal of Channelized Right Turns $900,000 PTIF Yes Yes No
Toronto Skylight Replacement Program $13,678,000 PTIF Yes Yes No
Toronto LED Blank-Out Signs for turn restrictions $380,000 PTIF Yes No No
Toronto Eglinton Connects Streetscape Improvements and Cycle Tracks $8,900,000 PTIF Yes Yes No
Toronto Subway Facility Renewal Program $3,801,500 PTIF Yes Yes No
Toronto Maintenance of Joint TTC / Toronto Transportation Bridges $4,847,500 PTIF Yes Yes No
Toronto Bus Stop Improvements for Accessibility $10,000,000 PTIF Yes Yes No
Toronto T1 Subway Cars - 15 Year Overhaul $12,304,000 PTIF Yes Yes No
Toronto Flemingdon Park-Thorncliffe Park Neighbourhood Connections $1,500,000 PTIF Yes Yes No
Toronto Train Door Monitoring System - T1 & TR (Overhaul and Communications) $18,259,000 PTIF Yes Yes No
Toronto Eglinton East LRT Planning and Design $3,500,000 PTIF Yes Yes No
Toronto Toronto Rocket / T1 Rail Yard Accommodation $24,353,500 PTIF Yes Yes No
Toronto Bike Share Toronto Expansion at 50 TTC stations $1,250,000 PTIF Yes Yes No
Toronto Surface Transit Operational Improvement Studies $105,000 PTIF Yes No No
Toronto VISION (CAD/AVL) $15,000,000 PTIF Yes Yes No
Toronto Subway Turnout Rehabilitation Program $14,886,500 PTIF Yes Yes No
Toronto Pavement Marking Improvements $200,000 PTIF Yes Yes No
Toronto Easier Access Phase III $3,275,000 PTIF Yes Yes No
Toronto Midland Avenue Multi-Use Trail $4,500,000 PTIF Yes Yes No
Toronto Missing sidewalk links - 2018 $855,000 PTIF Yes No No
Toronto Stations Transformation (incl Zone Hubs) $10,185,500 PTIF Yes Yes No
Toronto Surface Special Trackwork Replacement Program $6,784,500 PTIF Yes Yes No
Toronto Waterfront Transit Design $1,800,000 PTIF Yes Yes No
Toronto Bicycle parking at 40 TTC stations $425,000 PTIF Yes Yes No
Toronto Eglinton Avenue East Bicycle Lanes $541,000 PTIF Yes Yes No
Toronto Automated Pedestrian Detection Upgrades $150,000 PTIF Yes Yes No
Toronto Reductions of curb radii at key intersections $125,000 PTIF Yes Yes No
Toronto West Toronto Railpath Extension $11,750,000 PTIF Yes Yes No
Toronto Customer Facing Information Screens (CFIS) $2,500,000 PTIF Yes Yes No
Toronto York University Cycling Connections $111,500 PTIF Yes Yes No
Toronto Replacement of Orion VII Hybrid Bus Components $10,762,500 PTIF Yes Yes No
Toronto Real-time alternative transportation information screens $30,000 PTIF Yes Yes No
Toronto Relief Line Planning and Design $27,760,000 PTIF Yes Yes No
Toronto Dufferin Street North Trail/Cycle Track $700,000 PTIF Yes Yes No
Toronto APC expansion to remainder of TTC 40' bus fleet and ALRVs $4,659,000 PTIF Yes Yes No
Toronto Missing sidewalk links - 2017 $660,000 PTIF Yes Yes No
Toronto Surface Track Replacement Program $21,462,000 PTIF Yes Yes No
Toronto On Grade Paving $4,497,000 PTIF Yes Yes No
Toronto Burnhamthorpe/Renforth Boulevard multi-use trail to Kipling Station $1,045,000 PTIF Yes Yes No
Toronto Davenport Diamond Program $5,000,000 PTIF Yes Yes No
Toronto Backflow Preventers $952,000 PTIF Yes Yes No
Toronto Subway Track Rehabilitation Program $31,744,000 PTIF Yes Yes No
Toronto Storage Tanks - Oil Interceptors $618,500 PTIF Yes Yes Yes
Toronto Wheel Trans Transformation Program $9,777,500 PTIF Yes Yes No
Toronto Subway Rail Grinding $7,070,000 PTIF Yes Yes No
Toronto Exhibition Place/Ontario Place Land Bridge Study $300,000 PTIF Yes Yes Yes
Toronto Surface Way Building Replacement $16,584,500 PTIF Yes Yes No
Toronto Union Station - Northwest PATH $464,266 PTIF Yes Yes No
Toronto Union Station - Security Analysis $250,000 PTIF Yes Yes No
Toronto King Street Modelling Study $300,000 PTIF Yes Yes No
Toronto Opportunities to Improve Transit Service - Transit Priority Measures $10,000,000 PTIF Yes Yes No
Toronto Union Station - Cove Lighting $50,000 PTIF Yes Yes No
Toronto Union Station - Signage and Wayfinding $200,000 PTIF Yes Yes No
Toronto Surface Transit Operational Improvement Studies - Phase 3 $250,000 PTIF Yes Yes No
Toronto Reimagining Yonge Street Design $2,000,000 PTIF Yes Yes No
Toronto Union Station - Security Access Tunnel $150,000 PTIF Yes Yes No
Trent Hills Install a new Scheduling Software/Hardware program for the Specialized Transportation Program $6,250 PTIF Yes Yes No
Trent Hills Purchase a specialized transit vehicle to replace a vehicle $47,500 PTIF Yes Yes No
Wasaga Beach Replacement of One Transit Bus $52,500 PTIF Yes Yes Yes
Wasaga Beach Fleet Replacement(Two Units) $105,000 PTIF Yes No No
Wasaga Beach Master Plan/Route Optimization Study $26,472 PTIF Yes Yes No
Waterloo Active Transportation Improvements $2,500,000 PTIF Yes Yes No
Waterloo Transit Safety and Security Measures (285 buses, 10 stations/terminals) $1,400,000 PTIF Yes Yes No
Waterloo Fleet Expansions (18 buses) $4,500,000 PTIF Yes Yes No
Waterloo Design and Construction of Fairview Mall Transit Terminal $1,000,000 PTIF Yes Yes No
Waterloo iXpress Station Development $2,056,000 PTIF Yes Yes No
Waterloo Design and Construction of University of Waterloo Transit Plaza $2,000,000 PTIF Yes Yes No
Waterloo Transit Priority Design Studies $600,000 PTIF Yes Yes No
Waterloo Onboard Traffic Signal Priority Equipment (285 buses) $500,000 PTIF Yes Yes No
Waterloo On Board Camera Replacement (1778 cameras for 248 buses) $1,000,000 PTIF Yes Yes No
Waterloo Purchase Voice Radio Infrastructure and Equipment to be installed in 300 vehicles including conventional buses, specialized buses and service vehicles. $4,600,000 PTIF Yes Yes No
Waterloo Design Costs and Site Works for Northfield Drive Transit Facility $2,800,000 PTIF Yes Yes No
Waterloo Vehicle Replacements (48) $12,000,000 PTIF Yes Yes No
Welland Refurbish existing bus wash system $40,000 PTIF Yes Yes No
Welland Purchase two 12-metre accessible transit buses to replace existing vehicles $520,000 PTIF Yes Yes No
Welland Purchase a new van to replace existing transit supervisor's van $20,000 PTIF Yes Yes No
Welland Purchase two 8-metre accessible transit buses to replace existing vehicles $150,000 PTIF Yes Yes No
Welland Install a new hoist to replace existing bus hoist $50,000 PTIF Yes Yes No
Welland Purchase two 9-metre accessible transit buses to replace existing vehicles $465,000 PTIF Yes Yes No
Welland Replace of manual fare boxes with electronic fare boxes on specialized transit vehicles (phase II) $50,000 PTIF Yes Yes No
Welland Maintenance/vault office renovations $77,322 PTIF Yes Yes No
Welland Purchase two specialized transit buses to replace existing vehicles $115,000 PTIF Yes Yes No
Welland Purchase a tow motor to lift heavy transit-related equipment $7,500 PTIF Yes Yes No
Welland Purchase new transmission jack for buses to replace old transmission jack $3,750 PTIF Yes Yes No
West Perth Improve Accessible Trail Approaches to the Specialized Transit Depot $13,799 PTIF Yes Yes Yes
West Perth Replace 1 Accessible Van $28,304 PTIF Yes Yes No
Windsor Quantification of ridership through the use of automatic passenger counters $100,000 PTIF Yes Yes No
Windsor Renovations and enhancements at the west end transit terminal $100,000 PTIF Yes Yes No
Windsor Installation of eight LED outdoor message signs at bus stops and two flat panel indoor displays $100,000 PTIF Yes Yes No
Windsor Cycling-Transit Connection on Little River Blvd - Radcliffe to East City Limits $35,000 PTIF Yes Yes No
Windsor Cycling-Transit Connection on Malden Road - Armanda to South City Limits $250,000 PTIF Yes Yes No
Windsor Replacement of three high speed doors in the maintenance garage $45,000 PTIF Yes Yes No
Windsor Acquisition of a commercial grade floor sweeper for maintenance garage floor $42,500 PTIF Yes Yes Yes
Windsor Renovations and enhancements to the transportation services area, including central dispatch, at the main transit terminal $100,000 PTIF Yes Yes No
Windsor Cycling-Transit Connection on Kamloops Street - Calderwood to the West Limit $34,515 PTIF Yes Yes No
Windsor Expansion of customer service parking to support increased demand $10,000 PTIF Yes Yes No
Windsor Installation of a makeup/exhaust unit for improved ventilation at main transit terminal $375,000 PTIF Yes Yes No
Windsor Conduct a fare structure review focusing on current fare structures with a view to incorporating the latest industry standards $195,000 PTIF Yes Yes No
Windsor Acquisition of a commercial grade parts washer for maintenance garage $37,500 PTIF Yes Yes No
Windsor Acquisition of Twenty-four 40 foot clean diesel buses $6,247,390 PTIF Yes Yes No
Windsor Restoration of multiple Transit Windsor pedestrian shelters $500,000 PTIF Yes Yes No
Windsor Implementation of a bulk fluid asset control system $50,000 PTIF Yes Yes Yes
Windsor Update existing safety and security features at main transit facility and Windsor International Transit Terminal $90,000 PTIF Yes Yes No
Windsor Rehabilitation of concrete surfaces throughout the maintenance garage $50,000 PTIF Yes Yes No
Windsor Cycling-Transit Connection on South Cameron Blvd. - Totten to Northwood $167,500 PTIF Yes Yes No
Windsor Improved functionality of farebox through use of technology enhancements $410,672 PTIF Yes Yes No
Windsor Conduct a service delivery review focusing on current and potential growth opportunities $275,000 PTIF Yes Yes No
Windsor Renovations and enhancements to customer service area at the main transit terminal $20,000 PTIF Yes Yes No
Windsor Rehabilitation of concrete surfaces and drains in fuelling and cleaning area of maintenance garage $35,000 PTIF Yes Yes Yes
Windsor Two additional Intelligent Transportation System laptops for on road supervisory support vehicles $4,500 PTIF Yes Yes Yes
Windsor Acquisition of fleet inspection equipment to support the bus rehabilitation program $387,500 PTIF Yes Yes No
Windsor Implementation of a hybrid bus refurbishing program $600,000 PTIF Yes Yes No
Woodstock Purchase 2 Expansion Buses $510,612 PTIF Yes Yes No
Woodstock Implement Electronic Fare System $128,990 PTIF Yes Yes Yes
York Yonge North Subway Extension - Planning and Preliminary Engineering $36,344,200 PTIF Yes Yes No
Aamjiwnaang First Nation Wastewater Feasibility Study for Community Lot Servicing $20,000 CWWF Yes Yes Yes
Aamjiwnaang First Nation Stormwater Drainage Study $20,000 CWWF Yes Yes Yes
Aamjiwnaang First Nation Water Supply Feasibility Study and Design for Community Lot Servicing $32,500 CWWF Yes Yes Yes
Aamjiwnaang First Nation Ditch, Swale and Berm Rehabilitation for Lot servicing $10,380 CWWF Yes Yes Yes
Adjala-Tosorontio Connection of the Loretto area and Weca area water systems in the Township of Adjala Township $74,589 CWWF Yes Yes No
Admaston/Bromley Structural Replacement of a Stormwater Culvert on Dillabough Road $7,000 CWWF Yes Yes Yes
Ajax Installation of an Oil/ Grit Separator to improve stormwater quality at sewer outfall from Caldicott Court $50,000 CWWF Yes Yes No
Ajax Conduct Condition Assessment on Six Stormwater Management Ponds $37,500 CWWF Yes Yes Yes
Ajax Hermitage Stormwater Management Pond Rehabilitation $41,250 CWWF Yes Yes Yes
Ajax Installation of an Oil/ Grit Separator to improve stormwater at sewer outfall from Callander Court $50,000 CWWF Yes Yes No
Ajax Design and Construction of Stormwater Quality Control Improvement at Existing Storm Sewer Outfall $325,000 CWWF Yes Yes No
Ajax Steele Valley Stormwater Management Pond Rehabilitation and Repair $123,000 CWWF Yes Yes Yes
Ajax Fishlock and Heritage Market Stormwater Management Pond Rehabilitation $62,500 CWWF Yes Yes Yes
Ajax Storm Sewer Outfall Rehabilitation at Spiers Crescent $100,000 CWWF Yes Yes No
Alderville First Nation Decommissioning of 13 wells $13,282 CWWF Yes Yes No
Alfred and Plantagenet Stormwater Culvert Replacement Project - Village of Wendover $381,098 CWWF Yes Yes No
Algoma District Installation of a new drinking water system at Ranger Lake $375,000 CWWF Yes Yes No
Algoma District Upgrade and replacement of the wastewater system at Ranger Lake $237,500 CWWF Yes Yes No
Algonquin Highlands Replacement of aging/deteriorating drainage culverts on the Dawson Road $50,000 CWWF Yes Yes Yes
Algonquins of Pikwàkanagàn First Nation Culvert Replacement Project $70,436 CWWF Yes Yes Yes
Alnwick/Haldimand Grafton Communal Water System - Water Meter Replacement Program. Replacement of existing 227 residential and 20 commercial water meters with new water meters on and around 10836 County Road #2. $41,688 CWWF Yes Yes No
Amherstburg The Amherstburg Water Treatment Plant Reservoir Upgrade and Redundancy Project $2,491,830 CWWF Yes Yes No
Animakee Wa Zhing #37 First Nation Class 4 Septic System Replacements (tank and field) for 5 homes. $57,884 CWWF Yes Yes Yes
Animbiigoo Zaagi’igan Anishinaabek Water Supply and Treatability Study $37,500 CWWF Yes Yes No
Anishinaabeg of Naongashiing Equipment Upgrades at Water Treatment Plant $28,502 CWWF Yes Yes Yes
Anishinaabeg of Naongashiing Equipment Upgrades at Wastewater Treatment Plant $11,750 CWWF Yes Yes Yes
Anishinaabeg of Naongashiing Equipment Upgrades at Sewage Pumping Station $1,500 CWWF Yes Yes Yes
Anishinaabeg of Naongashiing Equipment Upgrades at Councillors' Houses and Meeting Grounds water treatment plant $16,000 CWWF Yes Yes Yes
Armstrong Rehabilitation of Well # 3 located on 6th Street including New Casing and pump $10,000 CWWF Yes Yes Yes
Armstrong Upgrading of perimeter Safety and Security Fencing to Wastewater Lagoon $47,500 CWWF Yes Yes Yes
Armstrong Replacement of roofing on Church Road Pumping Station Building $15,241 CWWF Yes Yes Yes
Arnprior Daniel Street Watermain replacement Michael Street to Havey Street $522,530 CWWF Yes Yes Yes
Aroland First Nation Aroland First Nation Sewage Lagoons Remediation $32,750 CWWF Yes Yes Yes
Arran-Elderslie Upgrade to Watermain, Sanitary and Storm Sewer and Road restoration $174,307 CWWF Yes Yes Yes
Ashfield-Colborne-Wawanosh Investigate and implement a rehabilitation or treatment strategy for arsenic in the Dungannon Wells $50,000 CWWF Yes Yes No
Asphodel-Norwood Rehabilitation of Well #1 in village of Norwood to address aging and critical infrastructure $42,334 CWWF Yes Yes No
Asphodel-Norwood Drilling of Well #4 the village of Norwood to increase capacity and reliability for our residents $51,325 CWWF Yes Yes No
Assiginack Water and Wastewater Rehabilitation, including Pump System, Chemical Feed Systems, Instrumentation Equipment, Distribution System, Sewage System and General Building Maintenance and Equipment $58,775 CWWF Yes Yes Yes
Atikokan Rehabilitation of Sewage Pump Station 5 located at 59 Maple Cres in the Town of Atikokan by making upgrades to Sewage Pump Station # 5 $208,237 CWWF Yes Yes No
Attawapiskat First Nation Repairs and upgrades at Sewage Pumping Station $6,250 CWWF Yes Yes No
Attawapiskat First Nation Repairs and Upgrades at Water Treatment Plant $12,250 CWWF Yes Yes No
Attawapiskat First Nation Repairs and upgrades at Sewage Lift Station $3,650 CWWF Yes Yes No
Attawapiskat First Nation Repairs and Upgrades at Water Treatment Plant $87,000 CWWF Yes Yes No
Attawapiskat First Nation Repairs and upgrades to Sewage Lagoon $15,050 CWWF Yes Yes No
Aundeck Omni Kaning Rehabilitation of Water Treatment Plant, including the computer monitoring system and ozone systems. $66,076 CWWF Yes Yes No
Aurora Flood Study for Tannery Creek $37,500 CWWF Yes Yes No
Aurora Structural Watermain Relining on Tamarac Trail from Henderson Dr. to Ardill Cr. $500,000 CWWF Yes Yes No
Aurora Design of Damaged Storm Pipe Off Henderson Dr. $75,000 CWWF Yes Yes No
Aurora Decommissioning Wells Street Public School Sanitary Sewer $150,000 CWWF Yes Yes No
Aurora Reconstruction of Existing Watermain and Storm Sewer Infrastructure on Algonquin Crescent and Haida Drive $459,550 CWWF Yes Yes No
Aurora Assessment and cleaning Oversized Storm Pipes Throughout Aurora $250,000 CWWF Yes Yes No
Aylmer Aylmer Smart Water Meter Upgrade Project $407,551 CWWF Yes Yes No
Baldwin Slope Excavation, Application of Geosynthetic Clay Liner, Regrading of the Failing Berm as well as required Engineering at the Baldwin Township Exfiltrating Lagoon $50,000 CWWF Yes Yes Yes
Bancroft Feasibility Study and Inspections: Determine specific areas of rehabilitation focus within the wastewater collection system to improve optimization through reduced inflow and infiltration. $50,000 CWWF Yes Yes Yes
Bancroft Rehabilitation (remediation activities) to specific wastewater collection system areas identified as priorities by technical Feasibility Study and Inspections Report. $81,708 CWWF Yes Yes Yes
Barrie Water, Wastewater and Stormwater Master Plans and Needs Studies $900,000 CWWF Yes Yes No
Barrie Hotchkiss Creek Expansion- Essa, Anne to Gowan $2,200,000 CWWF Yes Yes No
Barrie Sanitary Servicing to Reduce Phosphorus to Lake Simcoe- Royal Oak, Bay, Cottage Lane $5,950,000 CWWF Yes Yes No
Barrie Memorial Square Redevelopment - flood prevention $175,000 CWWF Yes Yes No
Barrie Stormwater Management Pond Retrofit - Hotchkiss Creek at Bryne Drive (Pond ID HT6) $226,500 CWWF Yes Yes No
Batchewana First Nation Old Garden River Road Water Supply $31,000 CWWF Yes Yes Yes
Bayham Stormwater Plase 1 Detailed Design Master Plan $59,195 CWWF Yes Yes Yes
Bayham Port Burwell - Robinson St-Beach Storm Sewer Replacement - Optimization $156,076 CWWF Yes Yes No
Bearskin Lake First Nation Water Treatment Plant LED Lighting Retrofit $14,453 CWWF Yes Yes No
Bearskin Lake First Nation Water Treatment Plant Boiler System Replacement $56,335 CWWF Yes Yes No
Beausoleil First Nation Replacement of Septic Systems $15,000 CWWF Yes Yes No
Beausoleil First Nation Crowning and Hard-topping of O'Gemaa Miikan storm water system $62,659 CWWF Yes Yes Yes
Belleville South Park and Strachan Street Sewer Separation and Water main upgrade $1,356,080 CWWF Yes No No
Belleville Cedar and Henry Street - Watermain replacement to address water quality issues, and Stormsewer construction $1,950,000 CWWF Yes Yes No
Big Grassy First Nation Class 4 Septic System Replacements (tank and field) for 8 homes. $61,011 CWWF Yes Yes Yes
Biigtigong Nishnaabeg (Ojibways of the Pic River First Nation) Source Water Capacity Investigation $59,244 CWWF Yes Yes No
Biigtigong Nishnaabeg (Ojibways of the Pic River First Nation) Equipment Repairs and Upgrades at water treatment plant $14,000 CWWF Yes Yes No
Black River-Matheson Upgrade Programmable Logic Controller (PLC) $50,000 CWWF Yes Yes No
Blandford-Blenheim; Erin; London; Wellesley Reduce Lake Erie phosphorus loading rehabilitating 8 wetlands as part of the regional stormwater conveyance and management system $650,000 CWWF Yes Yes No
Blind River Wishart Street sanitary sewer rehabilitation $411,722 CWWF Yes Yes No
Bluewater Bayfield Wastewater System Inflow and Infilitration Study $123,094 CWWF Yes Yes No
Bluewater Environmental Assessment for Replacement of the Hensall Water Tower $30,000 CWWF Yes Yes No
Bonnechere Valley Upgrades to the Standpipe Water Storage Tower $103,982 CWWF Yes Yes No
Bracebridge Eight Street Storm Drainage Improvements $50,000 CWWF Yes Yes Yes
Bradford West Gwillimbury The Morris Road Drain and Stormwater Management Facility $1,009,410 CWWF Yes Yes No
Bradford West Gwillimbury The Simcoe Road Stormwater Management Facility Remediation and Restoration Project $186,500 CWWF Yes Yes No
Brampton Stormwater Asset Management Plan study to establish long term financial needs for all of the City's stormwater assets $525,000 CWWF Yes Yes No
Brampton Stormsewer rehabilitation project to replace or repair stormsewer infrastructure (where needed) under roads identified in the City's 2017 road resurfacing/repair program. $50,000 CWWF Yes Yes No
Brampton Improve stormwater quality to rehabilitate Loafer’s Lake $150,000 CWWF Yes Yes No
Brampton Stormwater Pond Rehabilitation involving design, tender, contract administration and construction for sediment removal and/or structural repairs to restore capacity and function $1,596,190 CWWF Yes Yes No
Brampton Rehabilitation of streambanks within the Etibicoke Creek Watershed to mitigate erosion issues locally while conducting studies to identify "at source" opportunities to reduce the potential for erosion $1,000,000 CWWF Yes Yes No
Brampton Low impact development study, pilot projects (construction) and water quality monitoring for the Fletcher's Creek Sustainable Retrofit Neighbourhood (incl. storm sewer design for an untreated roadway) $175,000 CWWF Yes Yes No
Brampton Central Area Planning District stormsewer study including inventory, database updates, GIS mapping and hydraulic modelling to identify stormsewer capacity and future asset needs. $250,000 CWWF Yes Yes No
Brampton Study and mitigation of the thermal effects of stormwater by investigating methods to reduce stormwater discharge temperatures through pilot projects (construction). $275,000 CWWF Yes Yes No
Brampton Rehabilitation design and construction of Drinkwater Stormwater Pond failed outfall and study of rehabilitation options to add water quality and erosion control functions (up to 30 outfalls and ponds) $550,000 CWWF Yes Yes No
Brampton Environmental Assessment Strategic Plan and Sustainability Framework for the Downtown Etobicoke Creek Revitalization Project $300,000 CWWF Yes Yes No
Brampton Pond Rehabilitation at the "Upper 9 stormwater management facility" from a dry to a wet pond with new storage capacity and outlet structure, to provide stormwater quality treatment and erosion control $450,000 CWWF Yes Yes No
Brampton Etobicoke Creek Valley Landfill Study for two landfills (technical data) to analyze and document the condition of the landfill to support the City's Downtown Revitalization Project $50,000 CWWF Yes Yes No
Brant County Nith River Wastewater Siphon Twinning $525,630 CWWF Yes Yes No
Brantford Stormwater Collection Network Assessment and Study $66,372 CWWF Yes Yes No
Brantford Wastewater Treatment Plant Electrical Transformer Replacement $1,858,410 CWWF Yes Yes No
Brantford Upgrading of existing 300mm Sanitary Sewer on Greenwich Drive to 450mm $1,797,790 CWWF Yes Yes No
Brantford Shellard Lane storm water management Pond Capital Rehabilitation $194,248 CWWF Yes Yes No
Brantford Turtle Pond Stormwater Management Pond Sediment Removal and Clean Out $267,256 CWWF Yes Yes No
Brantford Braneida Park Phase IX Stormwater Management Pond (Facility ID 07F001DP) Sediment Removal and Clean Out $154,867 CWWF Yes Yes No
Brighton Orchard Crescent Reconstruction including new watermain, hydrants and services, sanitary laterals, storm mains and laterals, road base and surface. There are 17 houses on Orchard Crescent. $138,424 CWWF Yes Yes No
Brighton Headpond Bypass Structure Rehabilitation for Stormwater Overflow $40,500 CWWF Yes Yes Yes
Brock Early works in support of the development of a Storm Water Master Plan $50,000 CWWF Yes Yes No
Brockton Replacement of Existing Primary Digester Roof (Original Construction Circa 1980) to Enhance the Municipality's Wastewater Treatment $176,637 CWWF Yes Yes No
Brockville Full reconstruction of Bartholomew Street including watermain, sanitary sewer, storm sewer and roadway. $242,500 CWWF Yes Yes Yes
Brockville A condition assessment of the City's Main Sewage Pumping Station's forcemain $134,947 CWWF Yes Yes Yes
Brockville Reconstruction of the City's main sewage pumping station $200,000 CWWF Yes Yes Yes
Brooke-Alvinston Repair/Refurbish South Wastewater Pump Station $10,952 CWWF Yes No No
Brooke-Alvinston Refurbish/Reline Water System Water Storage Standpipe on Henry Street to prevent detereoration of the cement walls due to water sepage and to extend the life of the standpipe $40,886 CWWF Yes Yes No
Brooke-Alvinston Replace aging Backup Generator at the Wastewater Plant $14,602 CWWF Yes Yes No
Brooke-Alvinston Upgrade/Replace the Sewage Treatment Plant Aeration Equipment $27,379 CWWF Yes Yes No
Brooke-Alvinston Repair/Refurbish North Wastewater Pump Station $10,952 CWWF Yes No No
Bruce Mines Conduct a Study and Videography (camera) of the Town's Wastewater Collection System $5,200 CWWF Yes Yes Yes
Bruce Mines Installation of a new Aeration System for the treatment of high levels of THMs (Trihalomethanes) at the pumping station $25,000 CWWF Yes Yes Yes
Brudenell, Lyndoch and Raglan Upgrade to ditches along Guiney Road to prevent flooding and damage to roadway $38,500 CWWF Yes Yes Yes
Brudenell, Lyndoch and Raglan Replacement of existing culverts to prevent flooding $11,500 CWWF Yes Yes Yes
Brunswick House First Nation Install a new generator to run water treatment plant $42,500 CWWF Yes Yes No
Brunswick House First Nation Repair green sand filter at the water treatment plant and replenish the filter media $16,264 CWWF Yes Yes No
Burk's Falls Rehabilitation of Wastewater collection system pipes and pumping stations $54,385 CWWF Yes Yes Yes
Burlington Roseland Creek Stormwater Erosion Protection – Guelph Line to Upper Middle Road $663,000 CWWF Yes Yes No
Burlington Appleby Creek Environmental Assessment and Detailed Design for Stormwater Management- Fairview Street to Pinedale Avenue $100,000 CWWF Yes Yes No
Burlington Replacement of Plains Road West Culverts (Patricia Avenue to Outlet) $50,000 CWWF Yes Yes Yes
Burlington Stormwater Quality Control Improvement – Installation Oil/Grit Separators – Multiple Locations $170,000 CWWF Yes Yes No
Burlington Plains Road Storm Sewer Replacement (at Plains Road East/C.N.R. Grade Separation) $162,500 CWWF Yes Yes No
Burlington Stormwater Management Pond Refurbishment - Infrastructure Repairs and Pond Dredging - Multiple Locations $50,000 CWWF Yes Yes No
Burlington Inspection, Design and Rehabilitation of Rail Crossing Culverts – Multiple Locations Along CN Halton and CN Oakville Subdivision Lines $249,035 CWWF Yes Yes No
Burlington Replacement of Woodward Avenue Storm Sewers (Woodward Avenue and Castleguard Crescent) $87,500 CWWF Yes Yes Yes
Caledon Update Quality Management Standards for Stormwater Discharge to receiving stream $30,000 CWWF Yes Yes No
Caledon Update the Town's Inventory of storm sewers and assign condition rating for Asset Management Planning and Costing $20,000 CWWF Yes No No
Callander Sewage system optimization study, planning and design. $71,314 CWWF Yes No No
Cambridge Selkirk Street - Renewal of water, sanitary and storm water infrastructure $290,000 CWWF Yes Yes No
Cambridge Berkley Road - Renewal of water, sanitary and storm water infrastructure $1,059,900 CWWF Yes Yes No
Cambridge Preston Wastewater Treatment Plant Upgrades $1,500,000 CWWF Yes Yes No
Cambridge Hespeler Wastewater Treatment Plant Upgrades $2,000,000 CWWF Yes Yes No
Cambridge Stormwater Management Facility Rehabilitation (Restoration of Burnett Ave Stormwater Management Facility including removal of sediment and vegetation and restoration of inlet/outlet structures.) $536,000 CWWF Yes Yes No
Carleton Place Structural relining of 300mm watermain at the Flora Street river crossing. $100,000 CWWF Yes Yes No
Carleton Place Structural relining of the 200mm diameter sanitary sewers on Antrim Street and and in the Industrial Park North $275,000 CWWF Yes Yes Yes
Carleton Place Rehabilitation of the control systems for the Wastewater Plant and remote sanitary pumping stations. $200,000 CWWF Yes Yes No
Carleton Place Replacement of roofs at Wastewater Plant and Water Treatment Plant $64,184 CWWF Yes Yes Yes
Carleton Place Structural replacement/extension of the 600mm stormsewer at Arthur Street and regrading of surface drainage parallel to Lansdowne Ave $50,000 CWWF Yes Yes No
Casey Replacement and relocation of manhole to house the flow meter and replace the flow meter due to flooding. $50,000 CWWF Yes Yes Yes
Casselman Upgrade to plant pump (low and hight lift pumps) at the Casselman Drinking Water System on Laval St. $45,000 CWWF Yes Yes Yes
Casselman Rehabilitation of 3 pumping lift stations (Laval St., Industrial St. and Albert St.) including pump, control panel and communication replacement. $188,924 CWWF Yes Yes Yes
Casselman Conduct an Environmental Assessment to Inform Laurier St. Lagoon Upgrading Plans. $50,000 CWWF Yes Yes No
Cat Lake First Nation Rehabilitation of the Water Treatment Plant $32,204 CWWF Yes Yes No
Cavan-Monaghan Rehabilitation of the existing Watermain with new polyvinyl chloride materials on King Street West (#40-#94) that serves the Millbrook Community $50,000 CWWF Yes Yes Yes
Central Elgin Construction of New Sanitary Sewage Pumping Station to Replace Station #51 $431,647 CWWF Yes Yes No
Central Huron Mary street sewer main rehabilitation & storm water infiltration prevention. $56,198 CWWF Yes Yes No
Central Manitoulin Replacement of the Programmable Logic Controller at the Mindemoya Water Treatment Plant $107,500 CWWF Yes Yes Yes
Centre Hastings Removal of built-up sludge at the Madoc Wastewater Lagoon to restore design volume of 1008 m3/ day. $50,000 CWWF Yes Yes Yes
Centre Wellington Trunk Storm Sewer Replacement (Moir Street to the Irvine River) to Reduce Risk of Flooding the Downtown Elora and Nearby Neighbourhood $131,096 CWWF Yes No No
Centre Wellington Inflow and Infiltration (I/I) into Sanitary Sewer Mitigation and Cast-Iron Watermain Replacement on James Street (Forfar Street to Churchill Cres) $91,039 CWWF Yes No No
Centre Wellington Inflow and Infiltration (I/I) into Sanitary Sewer Mitigation and Cast-Iron Watermain Replacement on Churchill Crescent $436,986 CWWF Yes No No
Chamberlain Upgrade to Radio Communications for Water and Sewage Facilities $94,105 CWWF Yes Yes No
Chapleau Removal of Obsolete Piping and Dewatered Sludge from Cell #1 at Chapleau Sewage Lagoon $96,392 CWWF Yes Yes Yes
Chapleau Cree First Nation Detailed Water Treatment System Assessment and Infrastructure Planning $52,574 CWWF Yes Yes No
Chapleau Ojibwe First Nation Chapleau Objibwe First Nation water treatment plant equipment upgrade $51,365 CWWF Yes Yes No
Chapple Upgrade to main outlet pipe from Chapple Lagoon $50,000 CWWF Yes Yes Yes
Charlton and Dack Purchase and Installation of Variable Frequency Drive control units at 50 Agnes Street, Charlton. $20,000 CWWF Yes Yes No
Charlton and Dack Purchase and Install 2 of the 3 raw water low lift pumps at 50 Agnes Street, Charlton. $4,000 CWWF Yes Yes No
Charlton and Dack Installation of a new 4 inch treated water flow meter at 50 Agnes Street, Charlton. $3,500 CWWF Yes Yes No
Charlton and Dack Replacement and Installation of existing high lift pumps from 7.5 horsepower to 5 horsepower with variable frequency drives at 50 Agnes Street, Charlton. $20,500 CWWF Yes Yes No
Charlton and Dack Replacement of Blow off Valves throughout Distribution System at 50 Agnes Street, Charlton. $2,000 CWWF Yes Yes No
Chatham-Kent Construction of new Ridgetown to Highgate Transmission Main, Highgate Storage Tank incl. Booster Station $2,300,000 CWWF Yes Yes No
Chatham-Kent Chatham Water Pollution Control Plant, Electrical Upgrades $500,000 CWWF Yes Yes No
Chatham-Kent Chatham Water Treatment Plant, Twinning of Water Main from Chatham High Lift Pumping Station to Grand Avenue $264,960 CWWF Yes Yes No
Chatham-Kent Chatham Water Pollution Control Plant, Headworks Ventilation and Electrical Upgrades $250,000 CWWF Yes Yes No
Chatham-Kent Chatham Wastewater Pump Station - #1 (Rehabilitation) $137,304 CWWF Yes Yes No
Chatham-Kent South Chatham-Kent Water Treatment Plant, Pressure Reducing Valve Replacement $125,157 CWWF Yes Yes Yes
Chatham-Kent Electrical upgrades at the South Chatham-Kent Water Treatment Plant $144,000 CWWF Yes Yes No
Chatham-Kent New Chemical System and Headworks at the Blenheim Water Pollution Control Plant $225,000 CWWF Yes Yes No
Chatham-Kent Chatham Water Treatment Plant – Capacity assessment $25,000 CWWF Yes Yes No
Chatham-Kent Chatham Wastewater Pump Station #5 Relocation $175,000 CWWF Yes Yes No
Chatham-Kent Replacement of Archimedes Screw pumps at the Wallaceburg Water Pollution Control Plant $125,158 CWWF Yes Yes No
Chatham-Kent Engineering design of a new Ridgetown Water Treatment Plant $327,797 CWWF Yes Yes No
Chatsworth Replace existing water standpipe with a larger volume standpipe to meet water pressures, fire flows, and foster economic growth $50,000 CWWF Yes Yes No
Chippewas of Georgina Island Water servicing for the south and east sides of Georgina Island $58,941 CWWF Yes Yes No
Chippewas of Kettle and Stony Point First Nation Chippewas of Kettle and Stony Point Water Treatment Plant and Distribution Capital Plan $106,500 CWWF Yes Yes Yes
Chippewas of Nawash Unceded First Nation Replace 2 Turbidity meters, transfer switch and media, and Pump station (1 and 2) chlorine and electrical upgrades $71,550 CWWF Yes Yes Yes
Chippewas of Nawash Unceded First Nation Water Feasibility Study to address water demand and future development $9,632 CWWF Yes Yes Yes
Chippewas of Rama First Nation Restoration of stormdrain outfall $6,000 CWWF Yes Yes Yes
Chippewas of Rama First Nation Restoration of stormdrain outfall $4,000 CWWF Yes Yes No
Chippewas of Rama First Nation Restoration of stormdrain outfall $67,500 CWWF Yes Yes No
Chippewas of the Thames First Nation Replacement of Sanitary Main 2 - Man Hole 3A $10,000 CWWF Yes Yes Yes
Chippewas of the Thames First Nation Water Treatment 2- Chlorine Injection repair $2,500 CWWF Yes Yes Yes
Chippewas of the Thames First Nation Design and Install Sludge Return System $8,015 CWWF Yes Yes Yes
Chippewas of the Thames First Nation Wastewater Study about Gravity collection system $2,500 CWWF Yes Yes Yes
Chippewas of the Thames First Nation Design and Install Sequential Batch Reactor to ensure Safe Operations of Station $25,000 CWWF Yes Yes Yes
Chippewas of the Thames First Nation Sewage Lift System 1 - Replacement $17,500 CWWF Yes Yes Yes
Chippewas of the Thames First Nation Sewage Lift Station - Safety Landing Rehabilitation $1,500 CWWF Yes Yes Yes
Chippewas of the Thames First Nation Water Treatment 1 - Chlorine System Rehabilitation $5,000 CWWF Yes Yes Yes
Chippewas of the Thames First Nation Conduct an Inspection of the Water Tower to inform required Rehabilitation/Maintenance $2,500 CWWF Yes Yes Yes
Chippewas of the Thames First Nation Sewage Lift System 2 - Replacement $17,500 CWWF Yes Yes Yes
Chippewas of the Thames First Nation Video Inspection of Sanitary Main 1 $750 CWWF Yes Yes Yes
Chisholm Replacement of a 1700mm diameter stormwater culvert on Wasing Road. $25,000 CWWF Yes Yes Yes
Chisholm Replacement of a 2100mm diameter stormwater culvert on Maple Road. $25,000 CWWF Yes Yes Yes
Clarence-Rockland Watermain Looping Completion for Village of Clarence-Creek $170,470 CWWF Yes Yes No
Clarence-Rockland Watermain Looping Completion for Village of Bourget $316,586 CWWF Yes Yes No
Clarington Robert Adams Pond Rehabilitation and Sediment Cleanout including Removal of approximately 1,200m3 of sediment. $90,000 CWWF Yes Yes Yes
Clarington West Side Pond Rehabilitation and Sediment Cleanout including Removal of approximately 2,500m3 of sediment. $300,000 CWWF Yes Yes Yes
Clarington Clarnew Pond Rehabilitation and Sediment Cleanout including Removal of approximately 1,100m3 of sediment. $220,000 CWWF Yes Yes Yes
Clearview Phase 1: New Construction on Locke Avenue Water Supply Pipeline for Reliable Access to Safe Drinking Water, and Modernize to Meet Projected Growth $88,525 CWWF Yes Yes Yes
Clearview Replacement of Aging/Asbestos Water Supply Pipeline on Scott Street to improve Reliable Access to Safe Drinking Water, and Modernize to Meet Projected Growth $312,640 CWWF Yes Yes Yes
Cobalt Pumphouse Road Water Treatment Plant upgrades to Chart Recorder and Supervisory Control and Data Acquisition (SCADA) system $8,000 CWWF Yes Yes Yes
Cobalt Cobalt Wetland Lagoon System Condition Assessment and Feasibility Study $15,000 CWWF Yes Yes Yes
Cobalt Install a chlorine analyzer loop for proven contact time in distribution $50,000 CWWF Yes Yes Yes
Cobalt Pumphouse Road Water Treatment Plant Chlorination system replacement $10,000 CWWF Yes Yes Yes
Cobalt Pumphouse Road Water Treatment Plant highlift pumps and variable frequency drive replacement $28,500 CWWF Yes Yes Yes
Cobalt Pumphouse Road Water Treatment Plant Backwash and Progress Valves replacement $20,000 CWWF Yes Yes Yes
Cobourg Replace the watermain on the entire length of Henry Street from Water Street to Spencer Street. $721,599 CWWF Yes Yes No
Cobourg Upgrade the aeration system to diffused air from mechanical surface aeration $240,568 CWWF Yes Yes No
Cochrane Water Pollution Control Plant- Disinfection (Ecoli) and Preliminary Treatment (Headworks) Upgrades $346,907 CWWF Yes Yes No
Coleman Water Freezing Mitigation Project: Installation of three Bleeder Stations $47,500 CWWF Yes Yes No
Collingwood Replacement of Maple Street Storm Sewer - Replacing 110m of storm sewer between Maple St. & McKay Crt. $100,000 CWWF Yes Yes Yes
Collingwood Upgrade and Expansion of Black Ash Creek Sewage Pump Station $422,457 CWWF Yes Yes No
Collingwood Upgrade of Minnesota Sewage Pump Station $422,457 CWWF Yes Yes No
Conmee New construction of Culverts/rehabilitation to establish a crown on the road for proper drainage. $50,000 CWWF Yes Yes Yes
Constance Lake First Nation Seasonal wastewater lagoon optimization $49,672 CWWF Yes Yes Yes
Constance Lake First Nation Feasibility study and detailed design for optimizing seasonal lagoons discharge. $37,500 CWWF Yes Yes Yes
Cornwall Rehabilitation of Cast Iron Watermains on Water Street, Riverdale, and East End Neighbourhoods to improve structural and hydraulic performance. $1,686,790 CWWF Yes Yes No
Couchiching First Nation Water and Wastewater Servicing Feasibility Study – Assessment of Feasibility of Community Standalone System $80,786 CWWF Yes Yes No
Cramahe Environmental Assessment, Engineering and Design of a Gravity Sewer Extension north from Percy and Park Street to Purdy Road (between Elgin St and "The Big Apple") (3.4km) $66,061 CWWF Yes Yes Yes
Curve Lake First Nation Rehabilitation and Securing of 42 Well Heads throughout the Community $79,800 CWWF Yes Yes No
Curve Lake First Nation Recalibration of the Curve Lake Pump House $4,509 CWWF Yes Yes Yes
Dawn-Euphemia Replacement of 350 Water System Meters $50,000 CWWF Yes Yes No
Dawson Campbell Municipal Drain Upgrade along River Road and Jenkins Drive $50,000 CWWF Yes Yes No
Deep River Huron Street sanitary sewer main relining $12,200 CWWF Yes Yes Yes
Deep River Wastewater Treatment Plant - 3 Sequencing Batch Reactor, Sequencing batch reactor Valves $20,000 CWWF Yes Yes Yes
Deep River Minor upgrades to the raw water intake & pumping and piping systems low lift pumping station $34,705 CWWF Yes Yes Yes
Deep River Parkdale Avenue sanitary sewer main replacement $81,432 CWWF Yes Yes Yes
Deep River Wastewater Treatment Plant - Supervisory control and data acquisition (SCADA) Upgrades $65,000 CWWF Yes Yes Yes
Deer Lake First Nation Rebuild primary clarifier drive system $52,500 CWWF Yes Yes No
Deer Lake First Nation Programmable Logic Controller Rebuild (SELOG) $11,978 CWWF Yes Yes Yes
Deer Lake First Nation Chemical Feed System Replacement $31,590 CWWF Yes Yes Yes
Delaware Nation - Moravian of the Thames Replace Existing Schedule 80 Polyvinyl chloride Piping, "Fisher' Regulator, Butterfly Valves and ABB Turbidity Analyzers $14,377 CWWF Yes Yes Yes
Delaware Nation - Moravian of the Thames Replace Existing Programmable Logic Controller and Supervisory Control and Data Acquisition computer (SCADA) system due to Obsolete and Impending Failure $49,250 CWWF Yes Yes Yes
Delaware Nation - Moravian of the Thames Replace Groundwater Source 'WELL 9' in order to Relieve the Stress on "WELL 11" and "WELL 10/12" $12,138 CWWF Yes Yes Yes
Deseronto Sewage Pumping Stations Electrical Upgrades and Manual Transfer Switch Installations $66,171 CWWF Yes Yes Yes
Dokis First Nation Update the current Capital Planning Study to provide additional well water supply for the water plant to meet the current demand and health requirements. $55,109 CWWF Yes Yes No
Dorion Reconstruction of open roadside ditches and culvert replacementson the Fish Hatchery Road. $49,825 CWWF Yes Yes No
Dryden Replacement of 600mm Corrugated Steel Pipe (CSP) Storm Sewer Pipe on Van Horne Avenue $50,000 CWWF Yes Yes Yes
Dryden Update 2004 Land Implementation Study for the Water, Sanitary, and Storm Water Systems $45,000 CWWF Yes Yes Yes
Dryden Water Treatment Plant Condition Analysis/Report to determine New Build/Rehabilitation Options $35,000 CWWF Yes Yes Yes
Dryden Water Treatment Plant Multiple Turbidity Meter Upgrade $20,000 CWWF Yes Yes Yes
Dryden Multiple Structural Relining of Watermains under Canadian Pacific Railway Tracks/Yard at 5 locations $200,000 CWWF Yes Yes Yes
Dryden Structural Relining (Cure in Place) of Sanitary Sewers at 4 locations $212,500 CWWF Yes Yes Yes
Dryden Sanitary Sewer Manhole Relining at approximately at 18 Locations $30,000 CWWF Yes Yes Yes
Dubreuilville Water distribution repairs - Replace seals and valves for 2 hydrants that are leaking badly in the distribution system $10,000 CWWF Yes Yes No
Dubreuilville Water treatment plant repairs - Inspect and repair or replace valves and piping in pump house due to leaks $21,014 CWWF Yes Yes No
Dubreuilville Water distribution maintenance - Swabbing of our distribution system for the entire community which is 5 km. $12,654 CWWF Yes Yes No
Dubreuilville Water treatment plant upgrade - Perform engineering study to design and install a contact time return line from contact chamber to analyzer. $7,500 CWWF Yes Yes No
Durham Sanitary sewer extension on Regional Rd. 52 (Thornton Rd.) from Champlain Ave. to Consumers Dr. to service industrial lands $205,000 CWWF Yes Yes No
Durham Sanitary sewer extension on Regional Rd. 25 (Consumers Dr.) extension from east of Thickson Rd. to Thornton Rd. to service industrial lands $620,000 CWWF Yes Yes No
Durham Watermain extension on Regional Rd. 25 (Consumers Dr.) extension from east of Thickson Rd. to Thornton Rd. to service industrial lands $550,000 CWWF Yes Yes No
Durham Watermain replacement on King St from Arthur St to Dunlop St., James St from Kings St. to Centre St., & Ontario St. W. from Henry St. to King St. $750,000 CWWF Yes Yes No
Durham Rehabilitation of existing watermains (Cement lining), Town of Whitby and the City of Oshawa $1,500,000 CWWF Yes Yes No
Durham Sanitary sewer replacement on King St from Arthur St to Dunlop St., James St from Kings St. to Centre St., & Ontario St. W. from Henry St. to King St. $700,000 CWWF Yes Yes No
Durham Harmony Creek Water Pollution Control Plant Upgrades, including aeration system, secondary clarifier, waste gas burner, Supervisory Control and Data Acquisition system and operations building. $7,750,000 CWWF Yes Yes No
Durham Oshawa Water Supply Plant - Plant No. 1 - Filter Rehabilitation $1,600,000 CWWF Yes Yes No
Durham Replacement of a feedermain on Bloor St from Grandview St. to Townline Rd. $1,000,000 CWWF Yes Yes No
Durham Watermain replacement crossing Hwy 401 east of Brock St. $800,000 CWWF Yes Yes No
Durham Whitby Water Supply Plant -installation of new dechlorination equipment to dechlorinate backwash prior to discharge into Lake Ontario $200,000 CWWF Yes Yes No
Durham Courtice Water Pollution Control Plant - Resource Recovery Study - Phase 2 (energy and resource recovery) $150,000 CWWF Yes Yes No
Durham Twinning of the sanitary forcemain from Water St. Sanitary Sewage Pumping Station to the intersection of Carlan Drive and Regional Road 8 (Reach Street) $2,050,000 CWWF Yes Yes No
Durham Cathodic Protection of Watermains (City of Pickering, Town of Ajax, Town of Whitby and City of Oshawa) $1,400,000 CWWF Yes Yes No
Durham Polybutylene Water Service Replacement Program (City of Pickering and Town of Ajax) $2,763,820 CWWF Yes Yes No
Dutton/Dunwich Installation of Wallacetown Elevated Tank ReChlorination System $129,498 CWWF Yes Yes No
Dysart, Dudley, Harcourt, Guilford, Harburn, Bruton, Havelock, Eyre and Clyde Class Environmental Assessment and Detailed Engineering Design of New Septage Treatment Facility $69,625 CWWF Yes Yes No
Eabametoong First Nation Sewage Lift Station Expansion $86,718 CWWF Yes Yes No
Eagle Lake First Nation Membrane Filter Replacement at Plant $65,635 CWWF Yes Yes No
Ear Falls Clarifier Rehabilitation at the Ear Falls Wastewater Treatment Plant $232,027 CWWF Yes Yes No
East Ferris Replacement and upgrading of a 20 metre stormwater culvert and rehabilitation of 4.3km of stormwater collection and conveyance system. $50,000 CWWF Yes Yes Yes
East Gwillimbury Assessment and Plan Development for the Town's Storm Water Management to Achieve Full Storm Water System Optimization $160,000 CWWF Yes Yes No
East Gwillimbury Rehabilitation of the existing West Street Sewage Pumping Station to Improve the Efficiency of Wastewater Management $438,408 CWWF Yes Yes No
East Hawkesbury Upgrade/rehabilitation of storm sewers on Mill Street, village of St-Eugene that serves 12 residential houses and one (1) business. $50,000 CWWF Yes Yes Yes
East Zorra-Tavistock Storm Sewer Replacement Component of the Jacob Street East Reconstruction Project $50,000 CWWF Yes Yes No
Edwardsburgh/Cardinal Replace piping, valves and measuring device at Adelaide Street Pumping Station Dry Well $35,000 CWWF Yes Yes No
Edwardsburgh/Cardinal Replace control unit on filter sequencing system at the Water Treatment Plant $27,500 CWWF Yes Yes Yes
Edwardsburgh/Cardinal Rehabilitate exterior overcoat of the existing Elevated Tank shell and cone surfaces. $70,000 CWWF Yes Yes Yes
Edwardsburgh/Cardinal Replace Ultraviolet (UV) unit at the wastewater treatment plant $35,844 CWWF Yes Yes No
Elliot Lake Repair of waste water pumping systems that services approximately 6000 homes due to failure at 2 Scott Road, Elliot Lake, Ontario. $198,743 CWWF Yes Yes No
Emo Upgrade to Existing Water Treatment Plant Raw Water Low Lift Pumps $22,500 CWWF Yes Yes No
Emo Upgrade to the Main Sewage Pumping Station - Roy Street Sewage Lift/Pumping Station, including Pumps, Piping and Controls $87,122 CWWF Yes Yes No
Englehart Upgrade of the main electrical system at the First Street Waterplant $112,500 CWWF Yes Yes No
Erin Install wireless communication plus Supervisory Control and Data Acquisition (SCADA) at multiple Water facilities. $95,827 CWWF Yes Yes Yes
Espanola Infrastructure Renewal Project Phase 2 for the rehabilitation of approximately 6.7 km of water, wastewater and stormwater infrastructure $364,106 CWWF Yes Yes No
Essa Replacement of 1750 metres of ductile watermain in the Robinson subdivision, Angus $413,471 CWWF Yes No No
Essex Upgrades to the Colchester South Lagoons and Pump Station including Aerator, MCC Panels and Sewage Pumps $237,500 CWWF Yes Yes No
Essex Upgrades to the Harrow-Colchester South Water treatment plant including Low and High Lift Pumps, Motor Control Center Panel and Microstrainer $507,500 CWWF Yes Yes No
Essex Upgrades to the Harrow Lagoon and Pump Station including Aerator, Motor Control Center Panels, Grinder and Sewage Pumps $217,500 CWWF Yes Yes No
Essex Replacement of the Grit Blower at the Pollution Control Plant $20,000 CWWF Yes Yes No
Evanturel Water Servicing Options Study $50,000 CWWF Yes Yes No
Fauquier-Strickland Replace existing 7.5 HP high lift pump with new Variable Frequency Drive (VFD) $18,236 CWWF Yes Yes Yes
Fauquier-Strickland Replace existing 8.5 HP raw water low lift pump $8,105 CWWF Yes Yes Yes
Fauquier-Strickland Structural New Construction - Water Plant Backwash surge tank $22,513 CWWF Yes Yes Yes
Fauquier-Strickland Water Plant Chemical Resistant Exhaust Fan equipment upgrade $1,146 CWWF Yes Yes Yes
Flying Post First Nation Culvert installation to address localized flooding $50,000 CWWF Yes Yes No
Fort Albany First Nation Repairs and Upgrades at Water Treatment Plant $62,578 CWWF Yes Yes No
Fort Albany First Nation Repairs and upgrades to distribution system valves, replace all stems and valves in distribution system. $25,000 CWWF Yes Yes No
Fort Albany First Nation Repairs and upgrades at Sewage Lift Station $20,250 CWWF Yes Yes No
Fort Erie Murray Street Water - Replacement of cast-iron watermain $163,600 CWWF Yes Yes Yes
Fort Erie Dufferin Street Sanitary Sewer - Replacement of vitrified clay pipe $275,000 CWWF Yes Yes No
Fort Erie Battery Street Sanitary Sewer - Replacement of vitrified clay pipe $201,250 CWWF Yes Yes Yes
Fort Erie Murray Street Sanitary Sewer - Replacement of vitrified clay pipe $421,400 CWWF Yes Yes Yes
Fort Erie Battery Street Water - Replacement of cast-iron watermain $86,250 CWWF Yes Yes Yes
Fort Frances Replacement of water main, sanitary sewer mains and associated service lines along 2nd Street East from Mowat Avenue to Portage Avenue $638,506 CWWF Yes Yes No
Fort Severn First Nation Water Reservoir Liner Repair $60,000 CWWF Yes Yes No
Fort Severn First Nation Improve Freeze protection on water main $13,387 CWWF Yes Yes No
Fort William First Nation Design and Contract Administration Water Quality Improvements - Extension of Little Lake Road Watermain $25,000 CWWF Yes Yes Yes
Fort William First Nation Design and Contract Administration Extension of Water Distribution and Fire Protection Improvements $19,500 CWWF Yes Yes Yes
Fort William First Nation Design and Contract Administration for Community Flooding Control - Installation of new Stormwater Pipe $47,500 CWWF Yes Yes Yes
French River Assessment of Noelville Wastewater/Stormwater Infrastructure Upgrades $50,000 CWWF Yes Yes No
Front of Yonge Upgrade very large culvert Devil's Door Rd. $9,500 CWWF Yes Yes Yes
Front of Yonge Upgrade culverts, Ditching Guild Rd. 20 homes $4,000 CWWF Yes Yes Yes
Front of Yonge Upgrade culverts, Ditching Catholic Ch Rd, 5 homes $12,500 CWWF Yes Yes Yes
Front of Yonge Upgrade Ditches, drainage, Junetown Rd.35 homes $4,500 CWWF Yes Yes Yes
Front of Yonge Upgrade Ditches, drainage, Lake Street 70+ homes $4,000 CWWF Yes Yes Yes
Front of Yonge Upgrade culverts, Ditching Marsh Rd, 20 homes $15,500 CWWF Yes Yes Yes
Gananoque Force Main and East End Pumping Station upgrade $336,767 CWWF Yes Yes No
Garden River First Nation Upgrades and Repairs at the Echo River Water treatment plant $28,500 CWWF Yes Yes No
Garden River First Nation Hydrogeological groundwater study and new well $11,820 CWWF Yes Yes No
Garden River First Nation Design for Servicing for new subdivision $20,000 CWWF Yes Yes No
Garden River First Nation Upgrades and Repairs at the Garden River Water treatment plant $43,500 CWWF Yes Yes No
Gauthier Conduct Engineering Rehabilitation Studies and Recommended Works on existing Stormwater and Wastewater Infrastructure at Various Locations in Dobie $42,500 CWWF Yes Yes No
Georgian Bluffs Upgrade existing pressure reducing valve chamber $7,500 CWWF Yes Yes Yes
Georgian Bluffs Upgrade aging components of Shallow Lake Water Plant $89,439 CWWF Yes Yes Yes
Georgian Bluffs Waterproof existing valve chamber on raw water main $10,000 CWWF Yes Yes Yes
Georgina Watermain Replacement (Burke Street, Garrett Drive and West Street) $1,509,360 CWWF Yes Yes No
Gillies Rehabilitation of Multiple Stormwater Assets within the Township including Ditch Excavation and the Upsizing of Culverts $50,000 CWWF Yes Yes Yes
Ginoogaming First Nation Feasibility study and assessment of water distribution and sewage collection system to address the water losses and high inflow/infiltration issues at the Ginoogaming First Nation. $37,500 CWWF Yes Yes Yes
Ginoogaming First Nation Capital purchasing of new and/or replacement of equipment for optimizing the water losses and high inflow/infiltration issues from the Ginoogaming First Nation. $21,132 CWWF Yes Yes Yes
Goderich Replacement of interior lining and repair of the exterior of the Goderich Water Tower $210,950 CWWF Yes Yes Yes
Gogama Monitoring Equipment Upgrades at Water Distribution/Generator Building $5,750 CWWF Yes Yes No
Gogama System-Wide Main Water Valves Rehabilitation and Replacement $15,000 CWWF Yes Yes No
Gogama Replacement of 35 year old Pump at Well Building $4,250 CWWF Yes Yes Yes
Gogama Wastewater Lagoon Cells clean up $5,000 CWWF Yes Yes Yes
Gogama Consultation for repair/cleaning of concrete water holding tanks at Water Distribution/Generator Building $18,000 CWWF Yes Yes No
Gore Bay Replacement of 150m of Eleanor Street Watermain - From Phipps Street to Laird Street $106,066 CWWF Yes Yes Yes
Grand Valley Replacement of Foundation Drain Collectors -Phase 1 $159,013 CWWF Yes Yes Yes
Grassy Narrows First Nation Detailed Wastewater System Assessment and Identification of Alternatives to Meet Guidelines and Future Community Environmental and Health and Safety Needs $84,900 CWWF Yes Yes No
Gravenhurst Design and Planning for upgrades of Greavette Storm Sewer/Drainage System at 325 Greavette Street that serves 11 hectares of the urban core $35,600 CWWF Yes Yes Yes
Gravenhurst Rehabilitation of Greavette Storm Sewer/Drainage System at 325 Greavette Street that serves 11 hectares of the urban core $14,400 CWWF Yes Yes No
Greater Napanee Upgrade to the Town of Greater Napanee Wastewater Pollution Control Plant $447,983 CWWF Yes Yes No
Greater Sudbury York Street - Regent Street to Paris Street - Water Main Lining $250,000 CWWF Yes Yes Yes
Greater Sudbury Westmount Avenue - Culvert Replacement @ Hse #430 Greenvale Court $255,000 CWWF Yes Yes Yes
Greater Sudbury Strathmere Court - Robinson Drive East to Robinson Drive West - Sewer Main Lining $50,000 CWWF Yes Yes Yes
Greater Sudbury Nickel Basin Road - McKenzie Creek Culvert Replacement #2505 $250,000 CWWF Yes Yes Yes
Greater Sudbury Stormwater Asset Management Plan $200,000 CWWF Yes Yes No
Greater Sudbury Tilton Lake Road - Culvert Replacement $165,000 CWWF Yes Yes Yes
Greater Sudbury 1st Avenue - upgrade to main water line in Coniston $1,935,000 CWWF Yes Yes Yes
Greater Sudbury David Street - Storm Water Outlet Treatment Station - Design & Construction $800,000 CWWF Yes Yes No
Greater Sudbury Yorkshire Drive - Culvert Replacement near Sewer Plant $125,000 CWWF Yes Yes Yes
Greater Sudbury MR55 - Culvert Replacement #1553 $315,000 CWWF Yes Yes Yes
Greater Sudbury York Street - Regent Street to Paris Street - Sewer Main Lining $55,000 CWWF Yes Yes Yes
Greater Sudbury Mikkola Road - Culvert Replacement at Kantola Road $80,000 CWWF Yes Yes Yes
Greater Sudbury Manninen Road - Culvert Replacement $90,000 CWWF Yes Yes Yes
Greater Sudbury Edward Avenue - Culvert Replacement $90,000 CWWF Yes Yes Yes
Greater Sudbury Seguin Street - Culvert Replacement $120,000 CWWF Yes Yes Yes
Greater Sudbury Spruce Street - upgrade of water main water line $2,128,500 CWWF Yes Yes Yes
Greater Sudbury Strathmere Court - Robinson Drive East to Robinson Drive West - Water Main Lining $125,000 CWWF Yes Yes Yes
Greenstone Geraldton Ward Waterline Rehabilitation Phase III $230,902 CWWF Yes Yes Yes
Greenstone Longlac Ward Albany Place Watermain Replacement $24,268 CWWF Yes Yes Yes
Grey Badjeros Stormwater Management Study $15,000 CWWF Yes Yes No
Grey Grey Road 30 Stormwater Management Study $7,500 CWWF Yes Yes No
Grey Keady Stormwater Management Study $27,500 CWWF Yes Yes No
Grey Highlands Improve reliability of Markdale water supply system by upgrading Mark Street water main $77,709 CWWF Yes Yes Yes
Grimsby Water Main Rehabilitation 2019 - Upgrading of Cast Iron Water to PVC including Isolation Valves, Hydrants, and Service Connections $873,297 CWWF Yes Yes No
Grimsby Water Main Rehabilitation 2021 - Upgrading of Cast Iron Water to PVC including Isolation Valves, Hydrants, and Service Connections $938,523 CWWF Yes Yes No
Guelph Stormwater Management and Pond Maintenance $750,000 CWWF Yes Yes No
Guelph Snow Disposal Facility Upgrade $2,500,000 CWWF Yes No No
Guelph Metcalfe Street Reconstruction - Phase 1 $1,797,890 CWWF Yes Yes No
Guelph/Eramosa Valley Road - Richardson Street Watermain Connection $150,622 CWWF Yes Yes No
Haldimand Replacement of the Primary Disinfection Storage and Dosing System at the Nanticoke Water Treatment Plant $50,033 CWWF Yes Yes Yes
Haldimand Rehabilitation of the Backwash Filter Room at the Dunnville Water Treatment Plant $275,000 CWWF Yes Yes Yes
Haldimand Rehabilitation (concrete repair and sealing) of the West Reservoir at the Nanticoke Water Treatment Plant $55,000 CWWF Yes Yes Yes
Haldimand Rehabilitation (surface repairs and recoating) of the Cayuga Standpipe $475,000 CWWF Yes Yes Yes
Haldimand Replacement of Cast Iron Watermain in Hagersville $350,000 CWWF Yes Yes Yes
Haldimand Installation of Baffling Systems (curtains) in the East and West Reservoirs at the Nanticoke Water Treatment Plant $175,000 CWWF Yes Yes Yes
Hallébourg Replacement of waste water/sewer pipe on Jacques Street up to lagoon site $50,000 CWWF Yes Yes No
Halton Second Feedermain to the Washburn Reservoir and Booster Station $26,519,700 CWWF Yes Yes No
Halton Hills Installation of New 825mm Stormwater Sewer and Water Quality Treatment Unit on Armstrong Avenue $415,000 CWWF Yes Yes No
Halton Hills Rehabilitation of Existing 1500mm Concrete Storm Sewer and Outfall on Armstrong Avenue $122,000 CWWF Yes Yes No
Hamilton Extension of culvert and addition of guard rails at concrete box culvert located on Lander Road $40,000 CWWF Yes No Yes
Hamilton Construction of new well at Municipal Office location to provide clean drinking water to the public $10,000 CWWF Yes Yes Yes
Hamilton Woodward Wastewater Treatment Plant Methane Storage Facility refurbishment and exterior repainting. $2,000,000 CWWF Yes Yes No
Hamilton Metallic Watermain Condition Assessment Program $400,000 CWWF Yes Yes No
Hamilton Ben Nevis & Dewitt Water Pumping Station Upgrade $600,000 CWWF Yes Yes No
Hamilton Prestressed Concrete Cylinder Pipe Condition Assessment Inspection Program $250,000 CWWF Yes Yes No
Hamilton Condition Assessment Program for Mainline Sewers throughout the City $750,000 CWWF Yes Yes No
Hamilton Construction of new Lynden Water Treatment System $1,300,000 CWWF Yes Yes No
Hamilton Mountain Trunk Storm Sewer - Structural rehabilitation and repairs of 400 meters of 4.5 meter by 5.4 meter arch shaped concrete storm sewer to prevent imminent collapse $5,250,000 CWWF Yes Yes No
Hamilton Osler Road Pumping Station Rehabilitation - Rehabilitation of the existing pumping station including all pumping equipment, all ancillary equipment and building and property improvements. $750,000 CWWF Yes Yes No
Hamilton Wastewater System Lining - lining 20 Km of brick, concrete, clay, and Polyvinyl Chloride (PVC) sewers up to 1500mm diameter, to reduce occurrence of structural failure and back-ups $3,277,880 CWWF Yes Yes No
Hamilton Elgin St. Rhodes Court and Calvin St. sewage pumping station rehabilitation. $215,000 CWWF Yes Yes No
Hamilton Sewer Lateral Rehabilitation Program for private drains throughout the City $500,000 CWWF Yes Yes No
Hamilton Western Interceptor Sewer CCTV and Sonar Inspection $700,000 CWWF Yes Yes No
Hamilton Construction of New Corrosion Control Building at water treatment plant $1,540,000 CWWF Yes Yes No
Hamilton Watermain Structural Lining - internal lining of 4.5 Km of metal watermains up to 400mm in diameter, to reduce the occurrence of watermain breaks and to improve the quality of the water delivered $3,500,000 CWWF Yes Yes No
Hamilton Freelton Water Tower Structural Upgrades $712,500 CWWF Yes Yes No
Hamilton Critical Watermain Inspection Program $200,000 CWWF Yes Yes No
Hanover Design and Construction of a new Biosolids storage facility to comply with Ministry of Environment and Climate Change guidelines. $267,790 CWWF Yes No No
Havelock-Belmont-Methuen Upgrading of Water, Wastewater and Stormwater Infrastructure on Donald Street between Concession Road North and Union Street $92,173 CWWF Yes Yes No
Hawkesbury Replacement of 550 meters of water main with new 200mm conduit and replacement of all lateral services (water, sanitary and storm) servicing approximately 60 residences on Regent Street. $550,000 CWWF Yes Yes Yes
Hawkesbury Upgrading of 350 meters of the Tessier Street ditch located between 1250 Tessier St to 900 Tupper St and replacement of 59 meters of undersized culverts with 89 meters of elliptical concrete culverts. $125,000 CWWF Yes Yes Yes
Hawkesbury Installation of a 250mm diameter water main on Bon Pasteur Street between McGill Street and Geneviève Street $287,500 CWWF Yes Yes Yes
Hawkesbury Study of Hawkesbury Water Filtration plant. $85,500 CWWF Yes Yes No
Hearst Replace three (3) low-lift pumps at the Hearst Water Treatment Plant with new energy efficient pumps equipped with Variable Frequency Drives $42,895 CWWF Yes Yes Yes
Hearst Installation of Ultraviolet (UV-254) technology to monitor the efficiency of the process removing organic matter at Hearst's Water Treatment Plant $27,500 CWWF Yes Yes No
Hearst Addition of Backflow Preventers at Fifth St. Sewage Pumping Station $10,000 CWWF Yes Yes No
Hearst Re-roofing of fifth Street Pumping Station Building $7,500 CWWF Yes Yes No
Hearst Remove accumulated sludge from Hearst Wastewater Treatment Lagoons (cell #1) $86,850 CWWF Yes Yes No
Hearst Upgrade 10th Street pumping station to prevent contamination of adjacent river $87,500 CWWF Yes Yes Yes
Henvey Inlet First Nation Upgrades to the Pickerel River Water Treatment Plant and Tower of supervisory control and data acquisition (SCADA) System $36,000 CWWF Yes Yes No
Hiawatha First Nation Water System Upgrades $20,000 CWWF Yes Yes No
Hilton Beach Installation of new 15 horsepower Primary Well Pump $6,100 CWWF Yes Yes Yes
Hilton Beach Equipment Upgrades at the Water Treatment Plant for Chlorine analyzer, Turbidity meter and singer valve. $7,500 CWWF Yes Yes Yes
Hilton Beach Upgrades to components of the Supervisory Control and Data Acquisition (SCADA) at the Wastewater Plant $9,556 CWWF Yes Yes Yes
Hilton Beach Blower, rotating biological contactor Pump and Lift Station Pump installation $22,500 CWWF Yes Yes Yes
Hilton Beach Upgrade Wastewater Plant $12,500 CWWF Yes Yes Yes
Hornepayne Variable Frequency Drive for 3 High Lifts at the Water Treatment Plant $25,000 CWWF Yes Yes Yes
Hornepayne Replace 15 Main Valves Within the Water Distribution System $100,000 CWWF Yes Yes Yes
Hornepayne Radio Communication System for Raw Water Pumping Station $5,000 CWWF Yes Yes Yes
Hornepayne Repair/Replace 20 Curb Stops Within the Water Distribution System $32,875 CWWF Yes Yes Yes
Hornepayne Update to Mapping of Wastewater System (Hornepayne) $10,000 CWWF Yes Yes Yes
Hornepayne Update to Mapping of Water Distribution System (Hornepayne) $10,000 CWWF Yes Yes Yes
Horton Stormwater Drainage Study and design of stormwater management facilities(s) to service Lime Kiln Road. $25,000 CWWF Yes Yes No
Horton Rural Road Stormwater Drainage Design & Construction of open ditches and outlet(s) for Humphries Road. $25,000 CWWF Yes Yes Yes
Huntsville Replace of Centre Street Storm Water Management System. $75,221 CWWF Yes Yes Yes
Huntsville Town of Huntsville Drainage Study $35,000 CWWF Yes Yes Yes
Huron Sewage well upgrades at London Road Complex $50,000 CWWF Yes Yes Yes
Huron East Replacement of wastewater, water, storm sewer and road infrastrucutre on Winnipeg Road and Toronto Boulevard in the village of Vanastra with the Municipality of Huron East $124,125 CWWF Yes Yes No
Huron Shores Storm sewer rehabilitation from the end of Phase II, east along John Street and north along Chiblow Lake Road $50,000 CWWF Yes Yes No
Huron-Kinloss Construction of a new 1,450 m3 elevated drinking water storage tank to in the community of Ripley $317,208 CWWF Yes Yes No
Ignace Sewer Main upgrade, with replacement of one sewer main approximately 170 meters long and replacement of one sewer main approximately 50 meters long $123,484 CWWF Yes Yes Yes
Ignace Sewer Main upgrade, with replacement of asbestos pipe to new 200 mm Polyvinyl chloride (PVC) main and storm sewer main $134,669 CWWF Yes Yes Yes
Ingersoll The Installation of a Stormwater System and Urbanization of North Town Line East from Pemberton Street to Mutual Street. $152,117 CWWF Yes Yes Yes
Innisfil Detailed design and construction of a new in ground water reservoir and a pump station to meet the capacity requirements of existing and future planned growth. $1,408,420 CWWF Yes Yes No
Iskatewizaagegan #39 Independent First Nation Rehabilitation of the Water Treatment Plant $64,226 CWWF Yes Yes No
Ivanhoe Provincial Park and Rondeau Provincial Park Water System Upgrades at Rondeau Provincial Park Visitor Centre $56,500 CWWF Yes Yes Yes
Ivanhoe Provincial Park and Rondeau Provincial Park Drinking Water Treatment System Upgrades at Ivanhoe Lake, Ivanhoe Provincial Park $230,000 CWWF Yes Yes Yes
James Purchase new well level probe for main well for the township which serves 440 residents and 160 service connections. Located at the Elk Lake Water Treatment plant, 4 First Street. $2,035 CWWF Yes Yes No
James Repair programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 440 residents and 160 service connections. $6,100 CWWF Yes Yes No
James Enhance programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 245 houses $11,200 CWWF Yes Yes No
Johnson Upgrade the Johnson Township Water Treatment Plant $50,000 CWWF Yes Yes No
Kapuskasing Upgrade to sanitary forcemain and relocation of the Mill Street forcemain $501,015 CWWF Yes Yes No
Kasabonika Lake First Nation Wastewater Lift Station Repairs $69,746 CWWF Yes Yes Yes
Kasabonika Lake First Nation Water Treatment Plant - Treatment Train Filter Repairs $2,230 CWWF Yes Yes Yes
Kasabonika Lake First Nation Water Treatment Plant Energy Efficient Lighting Upgrades $24,666 CWWF Yes Yes Yes
Kashechewan First Nation Replace Highlift Pump #2 at the Water Treatment Plant $37,500 CWWF Yes Yes No
Kashechewan First Nation Replace Highlift Pump #1 at the Water Treatment Plant $37,500 CWWF Yes Yes No
Kashechewan First Nation Replace seals and valves of up to 24 fire hydrants $35,500 CWWF Yes Yes No
Kashechewan First Nation Repairs and Upgrades to Lagoon $14,250 CWWF Yes Yes No
Kawartha Lakes Lindsay Water Treatment Plant Filter Media Replacement $138,515 CWWF Yes Yes Yes
Kawartha Lakes Fenelon Falls Water Treatment Plant Clearwell Modification Study $60,000 CWWF Yes Yes Yes
Kawartha Lakes Elgin St. Water and Sanitary Main Replacement - Phase II $738,000 CWWF Yes Yes Yes
Kearney Drilled well/water system at 111 Main Street. Upgrading of water system from lake source water supply to drilled well for human consumption/use $7,500 CWWF Yes Yes Yes
Kearney Rehabilitate Septic System at 111 Main Street Location $18,833 CWWF Yes Yes Yes
Kearney Rehabilitate Septic System at 163 Main Street Location $16,166 CWWF Yes Yes Yes
Kearney Drilled well/water system at 163 Main Street. Upgrading of water system from lake source water supply to drilled well for human consumption/use $7,500 CWWF Yes Yes Yes
Keewaywin First Nation Community Storm Water Improvement Design $70,172 CWWF Yes Yes No
Kenora Seegmiller Avenue Sanitary Sewer Relining $9,284 CWWF Yes Yes Yes
Kenora First Street North West Dead End Sanitary Sewer Relining $11,230 CWWF Yes Yes Yes
Kenora Drewry Drive Sanitary Sewer Relining $60,313 CWWF Yes Yes Yes
Kenora Gunne Crescent Sanitary Sewer Relining $30,957 CWWF Yes Yes Yes
Kenora Heenan Place Sanitary Sewer Relining - Narin Westerly $5,240 CWWF Yes Yes Yes
Kenora Houghton Road Storm Sewer Relining $196,010 CWWF Yes Yes No
Kenora Heenan Place Sanitary Sewer Relining - East End $24,332 CWWF Yes Yes Yes
Kenora Valley Drive Sanitary Sewer Relining $148,366 CWWF Yes Yes Yes
Kenora Nairn Avenue Sanitary Sewer Relining $20,713 CWWF Yes Yes Yes
Kenora Ninth Avenue South #345 to #322 Sanitary Sewer Relining $9,982 CWWF Yes Yes Yes
Kenora Ninth Street North Storm Sewer Partial Replacement $24,750 CWWF Yes Yes Yes
Kenora First Street South at Main Street South Storm Sewer Relining $26,890 CWWF Yes Yes No
Kenora CCTV of Lakeside Neighbourhood Sanitary Sewers $98,134 CWWF Yes Yes Yes
Kiashke Zaaging Anishinaabek (Gull Bay First Nation) Detailed Water Treatment Plant Assessment, Treatability and Feasibility Study $65,880 CWWF Yes Yes No
Killaloe, Hagarty and Richards Killaloe Wastewater Pollution Control Plant Roof Repair $10,000 CWWF Yes Yes Yes
Killaloe, Hagarty and Richards Killaloe Wastewater Pollution Control Plant , Henry Street Pumping Station upgrades $17,500 CWWF Yes Yes No
Killaloe, Hagarty and Richards Killaloe Wastewater Pollution Control Plant Raw Sewage Grinder System replacement $22,500 CWWF Yes Yes No
Killarney Conduct a survey and inspection of the Sewage Collection System to develop a work plan/tender package for required upgrades/repairs. $61,904 CWWF Yes Yes Yes
Kincardine Connaught Park Trunk Collection Sewer Upgrades $521,605 CWWF Yes Yes No
King Nobleton-Phase 2 Sanitary Sewer (Contract 1) $248,470 CWWF Yes Yes No
Kingfisher Lake First Nation Water Treatment Plant Energy Efficient Lighting Upgrades $20,870 CWWF Yes Yes Yes
Kingston Upgrade of sanitary sewer on Centennial Drive from Resource Road approximately 1544m southerly $982,500 CWWF Yes Yes No
Kingston Process and Control Equipment Upgrades to the Dalton Avenue Sewage Pumping Station $900,000 CWWF Yes Yes No
Kingston Fortune Crescent/Venture Drive Water main replacement from Gardiners Road to Resource Road. $500,000 CWWF Yes Yes No
Kingston Princess Street Water main replacement from Sir John A MacDonald Boulevard to Concession Street $642,500 CWWF Yes Yes No
Kingston Repair and rehabilitate the roofs on Digesters 2 and 3 at Ravensview Wastewater Treatment Plant $750,000 CWWF Yes Yes No
Kingston Structural Integrity evaluation of Tower Street Elevated Storage Tank. $200,000 CWWF Yes Yes No
Kingston Upgrade of water main on Cataraqui Woods Drive from Midland Ave to Clyde Court $750,000 CWWF Yes Yes No
Kingston New water main on Taylor Kidd Boulevard from Bayridge Avenue to Blackburn Mews and northeasterly through utility easement to Gardiners Road $1,750,000 CWWF Yes Yes No
Kingsville Lakeshore West Pollution Control Plant Effleunt Ultraviolet (UV) System Replacement $120,000 CWWF Yes Yes Yes
Kingsville Lakeshore West Pollution Control Plant Main Motor Control Center Panel $75,000 CWWF Yes Yes No
Kingsville Lakeshore West Pollution Control Plant Raw Inlet Bar Screen Upgrade $195,000 CWWF Yes Yes Yes
Kingsville Lakeshore West Pollution Control Plant Facility Roof Replacement $50,000 CWWF Yes Yes Yes
Kingsville Lakeshore West Pollution Control Plant Raw Inlet Grit Blower Replacement $80,511 CWWF Yes Yes No
Kingsville Kingsville Wastewater Treatment Lagoon Main Pumping Station Pump Replacement $60,000 CWWF Yes Yes Yes
Kingsville Cottam Wastewater Treatment Lagoon Lagoon Main Pumping Station Pump Replacement $50,000 CWWF Yes Yes Yes
Kingsville Kingsville Wastewater Treatment Lagoon Main Pumping Station Diesel Generator Replacement $42,500 CWWF Yes Yes No
Kingsville Lakeshore West Pollution Control Plant Supervisory Control and Data Acquisition Programmable Logic Controllers Replacement $75,000 CWWF Yes Yes No
Kirkland Lake Upgrading of no. 2 highlight pumps at the water treatment plant $105,000 CWWF Yes Yes Yes
Kirkland Lake Upgrading of wastewater and stormwater infrastructure at the southern end of Allen Avenue to accommodate increased flows $75,000 CWWF Yes Yes Yes
Kirkland Lake Upgrading of water, wastewater and stormwater infrastructure on O'Meara Boulevard (Prospect Street to McCamus Avenue) $671,516 CWWF Yes Yes Yes
Kirkland Lake Water System Upgrades at Esker Lakes Provincial Park $494,500 CWWF Yes Yes Yes
Kitchener Full watermain and sewer replacement on Hugo Crescent and Lorne Avenue $1,523,850 CWWF Yes Yes No
Kitchener Full watermain and sewer replacement on Alice Avenue and Karn Street $857,164 CWWF Yes Yes No
Kitchenuhmaykosib Inninuwug First Nation Water Treatment Upgrades and Repairs $45,100 CWWF Yes Yes Yes
La Vallee Stormwater management: Erosion Away-Elimination of soil erosion and bank stabilization around the Cain Bridge $50,000 CWWF Yes Yes No
Lac La Croix First Nation Replacement of Slow Sand media and Cleaning of Reservoir $59,839 CWWF Yes Yes No
Lac Seul First Nation Raw Water Source Location $25,000 CWWF Yes Yes No
Lac Seul First Nation Distribution System Upgrade $25,000 CWWF Yes Yes No
Lakeshore Stoney Point Wastewater Treatment Plant on St. Clair Road Detailed Design Engineering $598,695 CWWF Yes Yes No
Lakeshore Oakwood Street Trunk Sewer Extension Structural Construction $1,180,030 CWWF Yes Yes No
Lambton Shores Alberta Street Sanitary Pumping Station in Grand Bend - Electrical and Mechanical Upgrades including replcement of the Emergency Stand-by Power System $83,500 CWWF Yes Yes No
Lambton Shores MacHenry Street Watermain Replacement - 250M of Watermain Replacement Through unopened Road Allowance under the Alexander Municipal Drain in Forest Ontario. $325,146 CWWF Yes Yes No
Lambton Shores Grand Bend Beach Sanitary Pumping Station - Electrical and Supervisory Control and Data Acquisition (SCADA) Upgrades with Asbestos Abatement and Replacement of the Emergency Stand-by Power System $112,000 CWWF Yes Yes No
Lambton Shores Green Acres Sanitary Pumping Station in Grand Bend - Life Safety and Electrical upgrades and Installation of New Supervisory Control and Data Acquisition (SCADA) $64,100 CWWF Yes Yes No
Lambton Shores Morenz Lane Sanitary Pumping Station in Grand Bend - Mechanical and Electrical Equipment Replacement $61,950 CWWF Yes Yes No
Lanark Rehabilitation of Existing Storm Sewers (Mississippi Mills) $33,000 CWWF Yes Yes Yes
Lanark Rehabilitation of Existing Storm Sewers (Drummond/North Elmsley) $17,000 CWWF Yes Yes Yes
Larder Lake Supervisory Control and Data Acquisition (SCADA) system replacement and enhancements for the water treatment plant $22,500 CWWF Yes Yes Yes
Larder Lake Raw sewage pump preplacement and soft start installlation for the waste water treatment plant $40,981 CWWF Yes Yes No
LaSalle Install Supervisory Control And Data Acquisition at 2 separate sewage pump station. Flow monitoring equipment at 19 sewage pumping stations. Light Emitting Diode at various sewage pumping stations. $90,000 CWWF Yes Yes No
LaSalle Installation of Mechanical Controlled bar screen at main sewage pumping station $625,000 CWWF Yes Yes No
LaSalle Dedicated emergency back up power supply for the sewage pumping stations. $48,483 CWWF Yes Yes No
Latchford Replace and reprogram computer sofware that runs Water Treatment Plant $35,000 CWWF Yes Yes Yes
Latchford Electrical upgrades to lift station $15,000 CWWF Yes Yes Yes
Laurentian Valley The detailed design for the reconstruction of Roy Street Water, Wastewater and Stormwater infrastructure $50,000 CWWF Yes Yes No
Leamington Seacliff Trunk Sanitary Sewer Study to expand existing sanitary service area and eliminate weeping beds. $51,426 CWWF Yes Yes No
Leamington Separation of sewers on Parkdale and Coronation that serve 56 homes $412,500 CWWF Yes Yes No
Leamington Separation of sewers on Danforth Avenue (Hayward to Seacliff) that serves 65 homes $1,705,000 CWWF Yes Yes Yes
Leamington Separation of sewers on Lorne/Gladstone/Melrose/Henry/William Avenues that will serve 71 homes $125,000 CWWF Yes Yes No
Leeds and Grenville Expansion of the existing stormwater sewer system in the Village of Lyn, along County Road 27 from County Road 46 to St. George Street. $50,000 CWWF Yes Yes Yes
Lennox and Addington Rehabilitation of approximately 330m of Storm Sewer at 2409 County Road 4, Camden East Ontario to the Napanee River $50,000 CWWF Yes Yes No
Lincoln Construction of a new Konkle Creek Stormwater Naturalization Corridor $397,306 CWWF Yes Yes No
London Springbank Reservoirs No. 1 & 3 Protective Membrane Condition Assessment $51,000 CWWF Yes Yes No
London Sewer Separation Program Acceleration -Design and Construction $4,740,920 CWWF Yes Yes No
London Trunk Watermains Syphons and Pipeline - Inspections and Condition Rating $1,017,500 CWWF Yes Yes No
London Design: Dingman Creek Subwatershed Stormwater Infrastructure $102,000 CWWF Yes Yes No
London Purchase and Install of Variable Frequency Drives at 4 Sanitary Pump Stations $661,500 CWWF Yes Yes No
London Trunk Watermain Cathodic Protection Upgrades - Design and Construction $147,500 CWWF Yes Yes No
London Cathodic Protection Program - Inspection, Design and Construction $254,500 CWWF Yes Yes No
London East London - Sanitary Servicing Study $178,000 CWWF Yes Yes No
London Applegate Stormwater Management Facility $229,000 CWWF Yes Yes No
London Design and purchase of Organic Rankine Cycle equipment for Power Generation and Waste Heat Recovery Systems & Biosolids Optimization at Greenway Pollution Control Plant $2,849,500 CWWF Yes Yes No
London Sewer Separation and Infrastructure Renewal - Planning and design for future projects $275,000 CWWF Yes Yes No
London Design and construction of odour control upgrades at 5 Treatment Plants across the City. $1,781,000 CWWF Yes Yes No
London Conduct Facility Improvement Studies at 4 Wastewater Treatment Facilities across the city. $66,000 CWWF Yes Yes No
London Design and Construction of Technology Upgrades (Supervisory Control and Data Acquisition (SCADA) and Security) at 30 Wastewater and 14 Water locations across the City $1,300,000 CWWF Yes Yes No
London Mornington Area Storm Drainage Servicing - Environmental Assessment $224,000 CWWF Yes Yes No
London Reclamation and Naturalization of Existing Urban Watercourses - Rehabilitation Plan Preparation $102,000 CWWF Yes Yes No
London Arva Water Pumping Station Optimization and Energy Efficiency - Planning Study $203,500 CWWF Yes Yes No
London Sewer Relining Program Acceleration - Design and Construction $549,500 CWWF Yes Yes No
London Purchase and Install Solids and Floatables Management equipment at 8 Locations (Pumping Stations and Treatment Plants) $1,109,000