Project Location Project Title Federal Funding Fund Approved In Progress * Completed
Abbotsford Abbotsford O&M CNG Facility $11,500,000 PTIF Yes No No
Vancouver; Surrey; Burnaby
Show all municipalities for project Rapid Transit Fleet Expansion - Canada Line
Anmore; Belcarra; Bowen Island; Burnaby; Coquitlam; Delta; Langley; Lions Bay; Maple Ridge; New Westminster; North Vancouver; Pitt Meadows; Port Coquitlam; Port Moody; Richmond; Surrey; Tsawwassen First Nation; Vancouver; West Vancouver; White Rock
Show fewer municipalities for project Rapid Transit Fleet Expansion - Canada Line
Rapid Transit Fleet Expansion - Canada Line $44,000,000 PTIF Yes Yes No
Vancouver; Surrey; Burnaby
Show all municipalities for project Rapid Transit Fleet Expansion - Millennium line
Anmore; Belcarra; Bowen Island; Burnaby; Coquitlam; Delta; Langley; Lions Bay; Maple Ridge; New Westminster; North Vancouver; Pitt Meadows; Port Coquitlam; Port Moody; Richmond; Surrey; Tsawwassen First Nation; Vancouver; West Vancouver; White Rock
Show fewer municipalities for project Rapid Transit Fleet Expansion - Millennium line
Rapid Transit Fleet Expansion - Millennium line $16,000,000 PTIF Yes Yes No
Vancouver; Surrey; Burnaby
Show all municipalities for project Rapid Transit Fleet Expansion - Expo Line
Anmore; Belcarra; Bowen Island; Burnaby; Coquitlam; Delta; Langley; Lions Bay; Maple Ridge; New Westminster; North Vancouver; Pitt Meadows; Port Coquitlam; Port Moody; Richmond; Surrey; Tsawwassen First Nation; Vancouver; West Vancouver; White Rock
Show fewer municipalities for project Rapid Transit Fleet Expansion - Expo Line
Rapid Transit Fleet Expansion - Expo Line $40,000,000 PTIF Yes Yes No
Campbell River Campbell River O&M CNG Facility $6,500,000 PTIF Yes No No
Cowichan Valley Cowichan O&M CNG Facility $6,500,000 PTIF Yes No No
Kelowna Kelowna UBCO Exchange $1,432,500 PTIF Yes Yes No
Langford; Victoria Victoria RTS Seismic Program $5,473,240 PTIF Yes Yes No
Mission; Vancouver Rapid Transit Fleet Expansion - West Coast Express $10,500,000 PTIF Yes No No
North Vancouver Bus facilities and exchanges $20,500,000 PTIF Yes No No
North Vancouver; Vancouver Rapid Transit Fleet Expansion - SeaBus $17,000,000 PTIF Yes Yes No
Prince George Prince George O&M CNG Facility $175,000 PTIF Yes Yes No
Saanich Douglas St. Bus Lane (Tolmie-Mckenzie) $4,625,000 PTIF Yes Yes No
Saanich Victoria Transit Depot and maintenance facility $175,000 PTIF Yes Yes No
Surrey South of Fraser RT Planning & Design $10,000,000 PTIF Yes Yes No
Surrey South of Fraser RT Early Works $19,150,000 PTIF Yes No No
Undefined SmartBus BC (3 sub projects AVL / APC / CCTV) $5,886,350 PTIF Yes Yes No
Undefined Expansion Buses $10,872,700 PTIF Yes Yes No
Undefined Bus Replacement (Light / Medium / Heavy Duty) $34,472,800 PTIF Yes Yes No
Vancouver Millennium Line extension (Broadway) Planning & Design $11,500,000 PTIF Yes Yes No
Vancouver Rapid Transit Systems Rehabilitation and Maintenance $46,200,000 PTIF Yes No No
Vancouver Multimodal station amenities $2,000,000 PTIF Yes Yes No
Vancouver Millennium Line extension (Broadway) Early Works $13,000,000 PTIF Yes No No
Vancouver Information technology $8,750,000 PTIF Yes Yes No
Vancouver Bus / SeaBus Systems Rehabilitation and Maintenance $25,650,000 PTIF Yes Yes No
Vancouver Rapid Transit stations $29,500,000 PTIF Yes Yes No
Whistler Whistler CNG Fueling Facility $1,600,000 PTIF Yes Yes No
100 Mile House Alpine Water System Upgrade $984,425 CWWF Yes Yes Yes
Abbotsford Gladwin Siphon Inlet, Odour Control and Outlet Chamber Project $995,000 CWWF Yes No No
Anmore Optimization of Stormwater Assets $137,500 CWWF Yes Yes No
Armstrong Wastewater Treatment Plant Rehabilitation $316,500 CWWF Yes Yes No
Ashcroft Village of Ashcroft – 2016 Sewage Treatment Plant Upgrade Dewatering Centrifuge $265,000 CWWF Yes Yes No
Balfour Balfour Water System Upgrade & Universal Metering Project $1,698,500 CWWF Yes No No
Bamfield Bamfield Water Treatment Facility $848,900 CWWF Yes Yes No
Boston Bar FVRD Electoral Area A: Boston Bar Water Systems Upgrade $52,972 CWWF Yes Yes Yes
Burnaby Combined Sewer Separation Program 2017 $2,943,080 CWWF Yes Yes No
Burns Lake 5th Avenue Water Tower Replacement $1,261,740 CWWF Yes Yes No
Castlegar Water System Efficiency Plan $30,000 CWWF Yes Yes No
Central Saanich Brentwood Bay Water Main- Phase 1 $425,000 CWWF Yes Yes Yes
Chetwynd Water Treatment Plant Upgrades $1,566,100 CWWF Yes Yes No
Chilliwack Yarrow Waterworks Reservoir "A" Replacement $850,000 CWWF Yes Yes No
Christina Lake Christina Lake Water System Upgrades $402,500 CWWF Yes Yes No
Clearwater Clearwater Septage Receiving Station Equalization Basin $140,000 CWWF Yes Yes No
Clearwater Water Supply Well No. 3 and Water Supply Main $1,053,000 CWWF Yes Yes No
Clinton Clinton Water Supply Main Replacement $587,500 CWWF Yes Yes No
Coldstream Coldstream Sewer Line Extension $65,000 CWWF Yes Yes No
Comox Valley Comox Valley Water Supply System Treatment Project $2,626,500 CWWF Yes Yes No
Coquitlam Plateau Water Pump Station Project $2,900,000 CWWF Yes Yes No
Courtenay Black Creek Oyster Bay Water Supply Security Project $340,250 CWWF Yes No No
Creston Arrow Creek Water Main Replacement and System Improvements - Final Phase $2,507,420 CWWF Yes Yes No
Cumberland Cumberland Water Treatment and Supply Improvements $3,005,000 CWWF Yes Yes No
Dawson Creek Water Treatment Plant Upgrades $2,249,000 CWWF Yes No No
Delta South Delta Groundwater Well Feasibility Study $25,000 CWWF Yes Yes Yes
Duncan Cowichan Water Supply Structured Decision Model (SDM) Development $100,000 CWWF Yes Yes No
Duncan Sustainable Watershed Systems, through Asset Management $132,500 CWWF Yes Yes No
Edgewater Lake Baptiste Dam Upgrade Project $251,404 CWWF Yes Yes No
Elkford Abruzzi Heights Infrastructure Replacement Design $140,000 CWWF Yes Yes No
Elkford District of Elkford - Water Loss Management Implementation $625,000 CWWF Yes Yes No
Enderby Shuswap River Water Main Crossing $329,700 CWWF Yes Yes Yes
Fort Fraser Fort Fraser Infrastructure Improvement Project $1,868,300 CWWF Yes No No
Fort St. James Fort St. James Water Looping Project - Simon Fraser Ave. $188,500 CWWF Yes Yes Yes
Fraser Valley Electoral Area B - Dogwood Valley Water System Upgrade $99,762 CWWF Yes Yes Yes
Fraser Valley Electoral Area E - Baker Trails Estate Wastewater Treatment System Replacement $823,175 CWWF Yes Yes No
Fraser Valley Electoral Area D - Area D Integrated Water System Upgrade $106,250 CWWF Yes Yes Yes
Fruitvale Beaver Valley Water System Davis/Eastview Improvements $108,150 CWWF Yes Yes No
Fruitvale Fruitvale Sewer Treatment Plant and Sewer Upgrades $932,500 CWWF Yes Yes No
Gibsons ISMP Update and Implementation $150,000 CWWF Yes Yes No
Gibsons Water Infrastructure Renewal Program $618,420 CWWF Yes Yes Yes
Gold River Beneficial Biosolids Reuse $298,155 CWWF Yes Yes No
Golden Community Wastewater System Improvements $375,000 CWWF Yes Yes Yes
Grand Forks City of Grand Forks Wastewater Treatment Facility Upgrades $2,005,000 CWWF Yes Yes No
Grand Forks City of Grand Forks 2017 Sewer Phasing Plan $50,000 CWWF Yes Yes No
Granisle Water Treatment Plant Detailed Design $106,018 CWWF Yes Yes Yes
Greenwood Greenwood Wastewater Utility Renewal $350,000 CWWF Yes Yes No
Harrison Hot Springs Harrison Hot Springs (HHS) Water Distribution Project $1,383,800 CWWF Yes Yes No
Hatzic Electoral Area F - Hatzic Prairie Water System Upgrade $889,336 CWWF Yes Yes No
Hazelton Bay Street Storm and Watermain Replacement $175,450 CWWF Yes Yes Yes
Honeymoon Bay Mesachie Lake Wastewater Treatment and Collection Upgrade Project, Phase 1 (Area F) $738,896 CWWF Yes Yes No
Hope Hope Pollution Control Center Upgrade (Sewage Treatment Plant) $1,466,750 CWWF Yes Yes No
Houston Lagoon Outfall Upgrades $167,224 CWWF Yes Yes No
Invermere Paddy Ryan Water Treatment Plant UV Disinfection Upgrade $908,481 CWWF Yes Yes No
Kamloops Juniper Creek Bank Stability $1,337,320 CWWF Yes Yes No
Kamloops TNRD Utility Systems Master Plan $87,100 CWWF Yes Yes No
Kaslo Kaslo Wastewater Treatment Plant Improvements $221,000 CWWF Yes Yes No
Kaslo Kaslo River Intake Upgrades $174,538 CWWF Yes Yes No
Kelowna SEKID/SOMID Water Supply Project $26,450,000 CWWF Yes No No
Kelowna Falcon Ridge Water System Improvement $362,700 CWWF Yes Yes No
Kent Agassiz Avenue Infrastructure Improvements Project $652,500 CWWF Yes Yes Yes
Keremeos Village of Keremeos Water System Upgrades $788,050 CWWF Yes Yes Yes
Keremeos Olalla Water System Rehabilitation Project $299,875 CWWF Yes Yes Yes
Kimberley Kimberley Wastewater Treatment Facility (WWTF) – Planning and Design $1,318,000 CWWF Yes Yes No
Kimberley Kimberley Drinking Water Loss Management $500,000 CWWF Yes Yes Yes
Kitimat Water System Backup Power and Pump 6B upgrade $375,000 CWWF Yes Yes No
Kootenay Boundary Rivervale and Oasis Sewer Service Pump Replacements $100,311 CWWF Yes Yes No
Ladysmith Ladysmith Drinking Water Filtration Project $5,306,760 CWWF Yes No No
Lake Country Eldorado Treated Water Reservoir & Glenmore Booster Station $3,500,000 CWWF Yes Yes No
Lake Cowichan Lake Cowichan Water Main Upgrades $680,177 CWWF Yes Yes No
Lake Errock Electoral Area C Lake Errock Water System Upgrades $200,875 CWWF Yes Yes No
Langley Utilities Works Project $1,811,640 CWWF Yes Yes Yes
Lions Bay Water Storage Facilities $1,355,500 CWWF Yes Yes No
Logan Lake Water Distribution System Improvements $875,000 CWWF Yes Yes Yes
Lumby Groundwater Supply Evaluation & Monitoring Well Construction $120,588 CWWF Yes No No
Lumby Long-Term Wastewater Treatment Plant Upgrades $119,565 CWWF Yes Yes No
Lund Lund Wastewater System Upgrade $280,000 CWWF Yes Yes No
Lytton Village of Lytton Source Water Protection Planning $48,510 CWWF Yes Yes Yes
Lytton Village of Lytton Groundwater Development $1,300,000 CWWF Yes Yes No
Mackenzie District of Mackenzie Community Water Supply Well $399,000 CWWF Yes Yes No
Maple Ridge 225 Street Pump Station and Force Main Upgrade - Phase 1 $601,750 CWWF Yes No No
Masset Masset Water Main Replacement $495,609 CWWF Yes Yes No
McBride Dominion Creek Drinking Water Intake Replacement $172,012 CWWF Yes Yes No
Merritt Coldwater Avenue Infrastructure Improvements $1,384,520 CWWF Yes Yes Yes
Mission Fraser River Sanitary Crossing Siphon $4,155,440 CWWF Yes No No
Montrose Montrose Wastewater Treatment Plant Upgrades $395,000 CWWF Yes Yes No
Mount Waddington Wastewater System Upgrades $270,585 CWWF Yes Yes No
Mount Waddington Water System Upgrades $41,350 CWWF Yes Yes No
Moyie Moyie Watermain Replacement Project $104,952 CWWF Yes Yes Yes
Nakusp Galvanized Main Replacement $307,908 CWWF Yes Yes Yes
Nanaimo Bowser Sewer Servicing $4,572,490 CWWF Yes No No
Nanaimo Greater Nanaimo Pollution Control Centre: Centrifuge and Polymer System $654,500 CWWF Yes Yes No
New Hazelton 13th Avenue Water Line Upgrade $405,250 CWWF Yes Yes Yes
New Hazelton Wastewater Treatment Facility Assessment $15,300 CWWF Yes Yes Yes
New Westminster Sapperton Combined Sewer Separation $3,326,170 CWWF Yes Yes No
North Cowichan Crofton Alternate Water Supply $1,562,440 CWWF Yes Yes No
North Okanagan Duteau Creek Water Treatment Plant UV Disinfection Addition $3,500,000 CWWF Yes Yes No
North Vancouver Wastewater Inflow and Infiltration Program - Lynn Valley Area $1,760,000 CWWF Yes Yes No
Northern Rockies Airport Watermain and Pump Station $2,790,000 CWWF Yes Yes No
Oak Bay Water Main Extension & Secondary Connection Project $692,875 CWWF Yes Yes No
Oak Bay Uplands Combined Sewer Separation Project - Detailed Design $195,758 CWWF Yes Yes No
Okanagan Falls Okanagan Falls Sewer System Upgrade Project $23,282 CWWF Yes Yes No
Oliver Willowbrook Water System Improvement Project $19,550 CWWF Yes Yes No
Oliver Watermain Looping at Head of Lake $281,500 CWWF Yes No No
Osoyoos 2017 Sanitary Sewer Infrastructure Rehabilitation Program $510,000 CWWF Yes Yes No
Parksville French Creek Pollution Control Centre Expansion $200,000 CWWF Yes Yes Yes
Parksville Drinking Water Supply Transmission Mains and Secondary Membrane Water Treatment $3,652,490 CWWF Yes Yes No
Parksville San Pareil Water System - Treatment Upgrades $420,000 CWWF Yes Yes No
Penticton Naramata Water System Upgrade Project $2,217,350 CWWF Yes Yes No
Penticton Carmi Water Reservoir Storage Capacity Upgrade $707,500 CWWF Yes Yes No
Port Alberni Somass Estuary (SE) Environmental Stewardship Protection Project $4,153,740 CWWF Yes No No
Port Alice Port Alice Water Tank Replacement $230,100 CWWF Yes Yes Yes
Port Alice Port Alice Wastewater Treatment Plant Upgrade $525,210 CWWF Yes Yes Yes
Port Edward Sanitary and Stormwater Pipe Rehabilitation $487,500 CWWF Yes Yes No
Port Hardy District of Port Hardy Reservoir Project $2,500,000 CWWF Yes Yes No
Port McNeill Water Distribution Replacement and Upgrade $965,000 CWWF Yes Yes No
Port Moody Angela Drive & Cecile Drive - Utility & Roadworks Improvements $862,500 CWWF Yes Yes No
Port Renfrew Port Renfrew Water Main Replacement $294,038 CWWF Yes Yes No
Pouce Coupe Village Asset Management Assessment $25,000 CWWF Yes Yes No
Powell River Consolidated Waste Water Treatment System $1,999,550 CWWF Yes Yes No
Powell River Haslam Water Supply Main Replacement $2,110,000 CWWF Yes Yes Yes
Prince Rupert Woodworth Lake Dam Replacement Project $4,295,000 CWWF Yes Yes No
Princeton Wastewater Treatment System Upgrading and Desludging $531,500 CWWF Yes Yes No
Pritchard Pritchard Sewer Backup Generator and System Upgrade Project $57,250 CWWF Yes Yes No
Qualicum Beach The Water and Wastewater Portion of the Memorial Upgrade Phase 3 $862,500 CWWF Yes No No
Quesnel Drinking Water Supply and Storage Upgrades $1,804,450 CWWF Yes Yes No
Radium Hot Springs Water Reservoir Replacement Project $600,000 CWWF Yes Yes Yes
Revelstoke Illecillewaet River Waterline Crossing $585,562 CWWF Yes Yes No
Rossland Comprehensive Sanitary Sewer Inflow & Infiltration Strategy $250,000 CWWF Yes Yes No
Rossland Spokane Street Infrastructure Improvement Project $2,188,030 CWWF Yes Yes Yes
Saanich CIPP Lining Saanich $1,750,000 CWWF Yes Yes No
Salmo Sewage System Upgrade and Improvements $1,046,250 CWWF Yes Yes No
Salmo Asset Inventory and Condition Assessment Upgrading $63,000 CWWF Yes Yes No
Salmon Arm Foreshore Sanitary Sewer Main Rehabilitation $858,000 CWWF Yes Yes Yes
Sayward Newcastle Creek Dam Rehabilitation Project $396,000 CWWF Yes No No
Sechelt Sechelt Sanitary Sewer Expansion Project $1,757,790 CWWF Yes Yes No
Sicamous Wastewater Facilities Upgrades $1,000,000 CWWF Yes Yes No
Silverton Silverton Water Main Replacement Project $234,337 CWWF Yes Yes No
Smithers Main Street to Victoria Drive Watermain Looping Project $282,500 CWWF Yes Yes Yes
Sorrento Lakeview Place Subdivision Water System Connection Project $240,980 CWWF Yes Yes Yes
Sparwood Water and Wastewater Infrastructure Network Study $125,000 CWWF Yes Yes No
Squamish Water System Improvements $688,100 CWWF Yes Yes No
Squamish Water Metering & Water Distribution System Improvements $970,090 CWWF Yes Yes No
Stewart Stewart Wastewater Rehabilitation Project $560,000 CWWF Yes Yes Yes
Strathcona Quathiaski Cove Sewage Extension Project $684,425 CWWF Yes Yes Yes
Summerland Wastewater Treatment Plant Grit Removal and Effluent Filter Upgrades $1,583,340 CWWF Yes Yes No
Sun Peaks Sun Peaks – Sewage Treatment Plant Facilities Upgrades $1,207,500 CWWF Yes Yes No
Sunshine Coast Pender Harbour Water Systems Water Main Replacements $1,650,000 CWWF Yes Yes No
Sunshine Coast Pender Harbour, Canoe Road Community Septic Field System Replacement $37,500 CWWF Yes No No
Sunshine Coast Merrill Crescent Community Septic Field System Replacement $32,500 CWWF Yes No No
Sunshine Coast Square Bay Wastewater Treatment Plant Upgrade $420,062 CWWF Yes No No
Sunshine Valley 2017 Sun Valley Water System Upgrade Project $22,000 CWWF Yes Yes No
Tahsis Wastewater System Condition Assessment and Optimization $137,000 CWWF Yes Yes No
Tahsis Community Water Conservation Project $204,451 CWWF Yes Yes No
Taylor Lift Station #3 Replacement Project $585,000 CWWF Yes Yes No
Taylor Sludge Thickening Planning Project $15,100 CWWF Yes Yes No
Telkwa Water Treatment Plant Assessment and Water Study Update $24,869 CWWF Yes Yes Yes
Terrace Terrace Reservoir Capacity Improvement Design $100,000 CWWF Yes Yes No
Terrace Terrace Wastewater System Improvements $1,327,290 CWWF Yes Yes No
Tofino District of Tofino Wastewater Treatment Plant $875,000 CWWF Yes Yes No
Trail Water Treatment Plant Regulatory Upgrades $623,540 CWWF Yes No No
Trail Rivervale Water and Street Lighting Service Water System Intake Upgrades $46,080 CWWF Yes Yes Yes
Trail Columbia Pollution Control Centre Upgrade to Secondary Treatment $786,000 CWWF Yes Yes No
Tumbler Ridge Lagoon Aeration System - Phase II $535,300 CWWF Yes Yes No
Ucluelet Wastewater Treatment Lagoon Rehabilitation $869,045 CWWF Yes Yes No
Vancouver Vancouver South Sewer Separation Project $5,837,500 CWWF Yes Yes No
Vanderhoof Water Supply and Storage Upgrades: Reservoir, Booster Station & Supply Main $1,789,750 CWWF Yes Yes No
Vernon Okanagan Landing Sewer Extension Project $1,842,500 CWWF Yes Yes No
Warfield Warfield PRV Stations Rehabilitation $111,000 CWWF Yes No No
Wells Water and Sewage Infrastructure $175,000 CWWF Yes Yes Yes
West Kelowna Rose Valley Water Treatment Plant $24,700,000 CWWF Yes No No
West Kelowna East Boundary Lift Station Upgrade $390,625 CWWF Yes Yes No
West Vancouver West Vancouver (Marine at the Beach) Lift Station Reconfiguration and Service Area Upgrades $3,017,250 CWWF Yes Yes No
Whistler Emerald Water System Disinfection Upgrade $1,256,510 CWWF Yes Yes No
Whistler Pinecrest Estates Wastewater Treatment Plant (Sewer) Replacement $998,205 CWWF Yes Yes No
White Rock Arsenic and Manganese Water Treatment Project $7,102,500 CWWF Yes Yes No
Williams Lake Stormwater Management Phase 4 $271,225 CWWF Yes Yes Yes
Williams Lake Water Management Strategy $100,000 CWWF Yes Yes No
Ymir Ymir Water Storage Reservoir Replacement $387,328 CWWF Yes Yes No

* The definition of "in progress" reflects the date when the work is expected to begin and is based on information provided by provinces and territories when projects are submitted for approval. This could include construction activity, engineering or pre-planning work, the signing of contracts to purchase transit buses/trains, etc.