Completed Access to Information Requests - January 2015

Access to Information requests completed from January 1, 2015 to January 31, 2015

Request Number Summary Disposition Number of pages disclosed
A14-025 Reports produced by Arup Canada Inc. that refer to the New Bridge for the St. Lawrence Corridor Project. Period to be covered: January 1, 2011, to December 31, 2011. Disclosed in part 45
A14-026

Reports produced by Arup Canada Inc. that refer to the New Bridge for the St. Lawrence Corridor Project. Period to be covered: January 1, 2012, to December 31, 2012.

Disclosed in part 370
A14-792

Obtain a copy of any document that Infrastructure Canada has that shows how much it will cost to demolish the Champlain Bridge in Montreal. Please also include any estimate that Infrastructure Canada has that shows how much it will cost to demolish the Champlain Bridge in Montreal. This access request only concerns the demolition of the existing Champlain Bridge. This access request does not concern the demolition of the Nuns' Island Temporary Causeway or the adjacent ice bridge. The period to be covered is January 1, 2012, to July 30, 2014.

Disclosed in part 1611
A14-812

Incidents Reports, Inspections Reports, Risk Assessments Reports and Safety Reports pertaining to the Champlain Bridge. Time frame: January 1, 2013 to December 3, 2014. Do not process Cabinet Confidences.

No records exist 0
A14-814

Please provide all Temporary Help Services (THS) Supply Arrangement (SA) and Standing Offer (SO) call-ups issued in the Western region, specifically the city of Calgary, the Pacific region, specifically for Vancouver, Burnaby, Langley, Abbotsford and Surrey, the Greater Toronto Area and the National Capital Region for the months of August 2014 and September 2014.

Disclosed in part 1
A14-815

Please provide all Task Based Professional Services (TSPS) and Task Based Informatics Services (TBIPS) Supply Arrangement (SA) contracts and Standing Offer (SO) call-ups issued in the National Capital Region for the months of August 2014 and September 2014.

Disclosed in part 4
A14-816

All records pertaining to a two-storey tunnel bridge under the Saint Lawrence River. Please include, but do not limit to, all of the Novaroute studies (October 2007) and all risk assessments reports. Time frame: January 1, 2006 to December 9, 2014.

No records exist 0
A14-828

All briefing notes, risk assessments, reports, associated costs, timetables, and roadblocks pertaining to the Griffintown development. Time frame: January 1, 2013 to December 11, 2014.

No records exist 0
Date modified: